| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC | L1 | Accepted-AOC accept | |
| 2 | L2₹9.9 L+₹19,557.09 (2.02%)Rejected-Finance 17 A SHYAMA JI PURAM I I T SOCIETY IIT KALYANPUR KANPUR UTTAR PRADESH 208016 | KANPUR NAGAR | UTTAR PRADESH | 208016 | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | KRISHNA AND CO L2 | SRI MURUGAN CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub soils in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and to full depth as may be directed,except in hard rock,requiring blasting including shoring and shuttering and bailing out of water wherever necessary,refilling the sides of foundation with excavated earth or sand in layer of not more than 15cm thick.well rammed and consolidated and depositing on bank with initial lead and lift of 10m & initial lift of 2m and depositing the surplusr earth within the compound in places shown by the departmental officers with iniital lead and lifts,clearing and levelling the site etc., complete as per SS20B and as directed by departmental Engineers(TNBP No.17,23,24). | 69 | M3 | 281.72 ₹19,438.68 | 276.1 ₹19,050.9 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Course Aggregate) Using 40mm Brick Jelly metal including all cost conveyance of materials and labour charges including vibrating charges etc. complete as per standard specification and as directed by departmental Engineers(TNBP No.28). | 11 | M3 | 5,773.14 ₹63,504.54 | 5,659 ₹62,249 Lowest |
| 3.00 | Reinforced Cement Concrete 1:1.5:3 mix (One cement and One and a half Fine Aggregate and Three Coarse Aggregate) Using 20mm ISS HBG metal including all cost conveyance of materials and labour charges for curing,finishing but excluding centering,shuttering and cost of reinforcement grills, including vibrating charges etc. complete as per standard specification and as directed by departmental Engineers(TNBP No.30). | 20 | M3 | 8,809.03 ₹1,76,180.6 | 8,636.2 ₹1,72,724 Lowest |
| 4.00 | Supplying, fabricating and placing in position TMT steel Bar for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30 | 1,000 | Kg | 94.83 ₹94,830 | 92.9 ₹92,900 Lowest |
| 5.00Supplying and erecting centering for sides and soffits including supports and strutting uptp 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90cmx60cm and 10 gauge stiffened, welded with mild steel angles of size 25mmx25x3mm for boarding laid over silver oak (country wood) joist of size 10cmx6.5cm dia spaced about 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre tocentre etc.complete complying with standard specification and as directed by the departmental engineers. TNBP No.30 | |||||
| 5.01 | square column | 15 | M2 | 1,271.71 ₹19,075.65 | 1,246.7 ₹18,700.5 Lowest |
| 5.02 | plian surface | 110 | M2 | 587 ₹64,570 | 575.4 ₹63,294 Lowest |
| 6.00 | Brick Work in CM 1:5 (One part of cement & five parts of sand) mix using Third Class Country Brick Kiln Burnt bricks 8 ¾ " x 4 ¼ " x 2 3/4" including cost and conveyance of materials to work site and including all labour charges for mixing, laying, curing the concrete etc., complete as per standard specifications and as directed by departmental Engineers – TNBP No:31 | 20 | M3 | 7,663.76 ₹1,53,275.2 | 7,513.4 ₹1,50,268 Lowest |
| 7.00 | Special Ceiling Plastering with CM 1:3 (One part of cement & three parts of sand)mix for 10mm thick including cost and conveyance of materials to work site and including all labour charges for mixing, laying, curing,finishing etc., complete as per standard specifications and as directed by departmental Engineers – TNBP No:30,56&57 | 39 | M2 | 313.44 ₹12,224.16 | 307.2 ₹11,980.8 Lowest |
| 8.00 | Plastering with CM 1:5 (One part of cement & five parts of sand) mix for 12mm thick including cost and conveyance of all materials to work site and including all labour charges for mixing, laying, curing,finishing etc., complete as per standard specifications and as directed by departmental Engineers – TNBP No:56&57 | 210 | M2 | 297.16 ₹62,403.6 | 291.3 ₹61,173 Lowest |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
23 Jan 2026, 3:00 pmClosed
Executive Officer, Kariapatti Town Panchayat
Town Panchayat Office, Kariapatti
Construction of Community Toilet (Seat 8) at Ward No-6, Kallikudi Road, Government Hospital in Kariapatti Town panchayat
2026_DTP_644717_1
190/2025/A1
Open Tender
Civil Works
Works
90 days
Kariapatti
Contractor Class - I
4 documents required · 4 mandatory
₹0
₹12,000
Yes
23 Mar 2026
19 Jan 2026
23 Jan 2026
19 Jan 2026
23 Jan 2026
19 Jan 2026
Earthwork excavation for foundation in all soils and sub soils in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and to full depth as may be directed,except in hard rock,requiring blasting including shoring and shuttering and bailing out of water wherever necessary,refilling the sides of foundation with excavated earth or sand in layer of not more than 15cm thick.well rammed and consolidated and depositing on bank with initial lead and lift of 10m & initial lift of 2m and depositing the surplusr earth within the compound in places shown by the departmental officers with iniital lead and lifts,clearing and levelling the site etc., complete as per SS20B and as directed by departmental Engineers(TNBP No.17,23,24).
Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Course Aggregate) Using 40mm Brick Jelly metal including all cost conveyance of materials and labour charges including vibrating charges etc. complete as per standard specification and as directed by departmental Engineers(TNBP No.28).
Reinforced Cement Concrete 1:1.5:3 mix (One cement and One and a half Fine Aggregate and Three Coarse Aggregate) Using 20mm ISS HBG metal including all cost conveyance of materials and labour charges for curing,finishing but excluding centering,shuttering and cost of reinforcement grills, including vibrating charges etc. complete as per standard specification and as directed by departmental Engineers(TNBP No.30).
Supplying, fabricating and placing in position TMT steel Bar for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30
Supplying and erecting centering for sides and soffits including supports and strutting uptp 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90cmx60cm and 10 gauge stiffened, welded with mild steel angles of size 25mmx25x3mm for boarding laid over silver oak (country wood) joist of size 10cmx6.5cm dia spaced about 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre tocentre etc.complete complying with standard specification and as directed by the departmental engineers. TNBP No.30
square column
plian surface
Brick Work in CM 1:5 (One part of cement & five parts of sand) mix using Third Class Country Brick Kiln Burnt bricks 8 ¾ " x 4 ¼ " x 2 3/4" including cost and conveyance of materials to work site and including all labour charges for mixing, laying, curing the concrete etc., complete as per standard specifications and as directed by departmental Engineers – TNBP No:31
Special Ceiling Plastering with CM 1:3 (One part of cement & three parts of sand)mix for 10mm thick including cost and conveyance of materials to work site and including all labour charges for mixing, laying, curing,finishing etc., complete as per standard specifications and as directed by departmental Engineers – TNBP No:30,56&57
Plastering with CM 1:5 (One part of cement & five parts of sand) mix for 12mm thick including cost and conveyance of all materials to work site and including all labour charges for mixing, laying, curing,finishing etc., complete as per standard specifications and as directed by departmental Engineers – TNBP No:56&57
Laying with first quality design ceramic tiles of all colours new ceramic tiles 305 x 305x 6mm tk for flooring and set in Cement Mortar 1:3 (one part of cement & three parts of sand)20mm thick and pointed with white cement including adding with suitable colouring pigments of match with the colour of tiles used and curing etc., complete.including cost and conveyance of all materials etc.and all labour charges etc.complete as per Standard specification and as directed by the departmental officers. TNBP No.special
Supply and fixing of Indian water closet with new glazed earthern ware Indian water closet of 22” Oriya type of approved quality & approved colour with “P” or “S” trap with sand cushion and forming flooring around the water closet using 40mm size broken brick jelly in cement concrete 1:2:4 of 4” thick and plastering with cement motar 1:3 20mm thick using river sand including fixing the water closet in position and giving necessary connection to CI stacks etc. complete including cost and conveyance of all materials and all labour charges etc.complete complying with standard specification and as directed by the departmental officer etc. complete. TNBP No. 100,102 & 103
Painting two coats with ready mixed Plastic Emulsion Paint S.I.358 Plastic emulison paint of'approved quality and colour over a priming coat, including thorough scraping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required including cost and conveyance of all materials etc.and all lobour charges etc.complete as per Standard specification and as directed by the departmental officers. TNBP No:66-A
Supply, fabrication and fixing of MS Door and Windows with one coat of priming coat including Cost and conveyance of all materials and labour charges to site etc. complete-1Kg
Wiring with 2x2.5 sqmm PVC unsheathed SC Alu cable of 650V grade in suitable OVC accessories and with TW Switch box wire connection of 14 SWGTC wire for PVC light point SD-26.
solid pvc door shutturs using 19gauge 19mm ms sqare tubes for styles and outer frames 15mm ms square tubes for top, lock and bottom rails. The steel tube shall be coverd with 5mm thick solid pvc sheets shuttur using 5mm thick solid pvc sheets for paneling shell regidly fixed in possition including necessary furniture and fittings the over all size of styles shell be 50mm X 30mm the over all size of top rail, lock rail and bottom rail shell be 75mm X 30mm. the over all size of frames shall be 50mm X 45mm, with suitable rabate for housing the shuttur. solid panal pvc door with frame.
Painting two coats with ready mixed enamel paint of'approved quality and colour over a priming coat, including cost and conveyance of all materials etc.and all lobour charges etc.complete as per Standard specification and as directed by the departmental officers. TNBP No:66-A
500Lits capacity HDPE Tank
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_772590.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .