| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.1 CrAccepted-AOC 201 3RD FLOOR A BLOCK SRI GURU TOWERS 80 FEET ROAD ANNA NAGAR MADURAI 625017 | MADURAI | TAMIL NADU | 625017 | ₹36.1 Cr Quoted ₹42.6 Cr | L1 | Accepted-AOC L1 Bidder - Accepted |
| 2 | L2₹46.9 CrRejected-AOC 2 E FRONT BLOCK 283 OLD NO 188 B P H ROAD KILPAUK CHENNAI 600010 | CHENNAI | TAMIL NADU | 600010 | ₹46.9 Cr | L2 | Rejected-AOC L2 Bidder - Rejected |
| Sl No | Description | Qty | Unit | CMK Projects Private Ltd., L1 | R.Krishnamurthy & Co L2 |
|---|---|---|---|---|---|
| 1.00AGARAM SITE | |||||
| 2.00Works including civil, Fabrications and Finishes | |||||
| 3.00PATHWAY | |||||
| 4.00 | Pavement for Lobby - Supplying and laying of Interlocking Paver Block Stone 60mm thick Over a base layer of crushed stone sandfilling incl. Cost of materials laying and Labour charges etc complete complying with the standard specification and as directed by the departmental officers. | 1,010 | Sqm. | 1,422 ₹14,36,220 | 1,065 ₹10,75,650 Lowest |
| 5.00UNDERGROUND TANKS AND ELECTRICAL AND PLUMBING TRUNCH | |||||
| 6.00 | Earth work excavation in all classes of soil except kankar requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring strutting, walling and forming protective bunds whereever necessary etc., complete as per relevant standard specification for DRESSING THE BED UPTO SILL LEVEL. UNDER ABUTMENTS AND PIERS LOCATION (Excavation for Plumbing and Electrical Trench) | 924 | Cum | 101 ₹93,324 Lowest | 150 ₹1,38,600 |
| 7.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers.(Excavation for Tanks) | 118 | Cum | 239 ₹28,202 | 200 ₹23,600 Lowest |
| 8.00CONCRETE WORKS AT FOUNDATION CENTERING AND SHUTTERING WORKS | |||||
| 9.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). -UG TANKS | 172 | Sqm | 770 ₹1,32,440 | 600 ₹1,03,200 Lowest |
| 10.00REINFORCEMENTS FOR RCC WORKS | |||||
Tender Value
₹46.9 Cr
EMD Value
₹47 L
Closing Date
16 Feb 2026, 5:00 pmClosed
Chief Mission Director, TNCRM
Tamil Nadu Coastal Restoration Mission, No.327, 9th Floor, CMRL Metros, Anna Salai, Nandanam, Chennai
Construction of International Bird Centre at Marakkanam, Villupuram District, Tamil Nadu.
2026_TNCRM_641162_2
IN-TNSHORE-520952-CW-RFB
Open Tender
Civil Works
Works
548 days
Marakkanam
Refer RFB
9 documents required · 9 mandatory
₹0
₹47 L
4 Mar 2026
12 Feb 2026
16 Feb 2026
12 Feb 2026
16 Feb 2026
14 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | AGARAM SITE | - | - | - | - |
| 2 | Works including civil, Fabrications and Finishes | - | - | - | - |
| 3 | PATHWAY | - | - | - | - |
| 4 | Pavement for Lobby - Supplying and laying of Interlocking Paver Block Stone 60mm thick Over a base layer of crushed stone sandfilling incl. Cost of materials laying and Labour charges etc complete complying with the standard specification and as directed by the departmental officers. | 1,010 | Sqm. | 1,541.9 | ₹15,57,319 |
| 5 | UNDERGROUND TANKS AND ELECTRICAL AND PLUMBING TRUNCH | - | - | - | - |
| 6 | Earth work excavation in all classes of soil except kankar requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring strutting, walling and forming protective bunds whereever necessary etc., complete as per relevant standard specification for DRESSING THE BED UPTO SILL LEVEL. UNDER ABUTMENTS AND PIERS LOCATION (Excavation for Plumbing and Electrical Trench) | - | Cum | 110 | - |
| 7 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers.(Excavation for Tanks) | - | Cum | 259.33 | - |
| 8 | CONCRETE WORKS AT FOUNDATION
CENTERING AND SHUTTERING WORKS | - | - | - | - |
| 9 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). -UG TANKS | 172 | Sqm | 834.73 | ₹1,43,573.56 |
| 10 | REINFORCEMENTS FOR RCC WORKS | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.17 MB
BOQ_786706.xls
BOQ • 2.56 MB
ReTenderFinalRFBIBC12022026.pdf
Tender Documents • 3.93 MB
DetailedDesignConcept_IBC_compressed.pdf
Tender Documents • 23.71 MB
IBCDrawings1_compressed.pdf
Tender Documents • 34.01 MB
IBC_Drawings_2_compressed.pdf
Tender Documents • 11.87 MB
TechnicalSpecifications.pdf
Tender Documents • 1.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].