Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 2 516E THIRUVALLUVAR NAGAR MALLUMICHAMPATTY POST COIMBATORE | COIMBATORE | TAMIL NADU | 638459 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹37 L
EMD Value
₹37,000
Closing Date
13 Oct 2026, 3:00 pmClosed
The commissioner, coimbatore
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Centre Median at VKL Nagar Tower Line Road in ward No.14 in North zone
2026_MAWS_708141_9
e70/2026-two cover NZ
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
AS PER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹37,000
14 Oct 2026
25 Sept 2026
14 Oct 2026
25 Sept 2026
13 Oct 2026
25 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS. 20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loamordinary soil and to full depthasmay bedirected except inhardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum ( CCMC 2025-26 S.NO -1A ) | 45 | m3 | - | - |
| 2 | Conveyance of earth and dismantled debries from work site to City outer with average lead of 15 km etc., complete as per standard specification ( CCMC 2025-26 S.NO -2.01 ) | 27 | m3 | - | - |
| 3 | PlainCementConcrete1:4:8 (onepart of cement, four part of Crushed Stone Sand (M-Sand) and Eight part of coarse aggregates) using 20mm size ISS HBGmetal including cost and conveyance of all materials to site and including for themixing, layingand labour charges and all incidential charges such as water providing etc., complete as per standard specification ( CCMC 2025-26 S.NO -3 ) | 30 | m3 | - | - |
| 4 | Brickwork in CM 1:5 mix Using Fly Ash bricks of 230x110x70mm (8 3/4"x41/4"x23/4")inculding cost of Materials and labour charges etc, as per standard specification | 28 | m2 | - | - |
| 5 | Supplying and filling the foundation and basement with GOOD EARTH FILLING in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.. ( CCMC 2025-26 S.NO -2D ) | 294 | cum | - | - |
| 6 | Brick Partition Walls using III class country bricks of size 8 3/4"X4 1/4" X 2 3/4" inC.M1:3 using hoop iron reinforcement,if found necessary standard specification including finishing, curing,etc., complete complying with standard specification - 10 sqm (Sl.No.212) | 76 | sqm | - | - |
| 7 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P-Sand))12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (Sl.No.297) ( CCMC 2025-26 S.NO - 29 ) | 1,274 | sqm | - | - |
| 8 | Supply & stacking of red earth at site to the departmental guage for pre-measurements which is of light textured, crystalline, porous and friable and not of generally acidic or neutral but not of alkaline and should be fertile, including seignior age charges, cost of transportation, loading, unloading, stacking and inclusive of all taxes etc., complete. ( HC-W0026 PD-1610 P.NO -269) | 157 | cum | - | - |
| 9 | Supply and filling of good quality Garden soil in the ratio of 2:2:1 of good quality existing earth, mixed with Red soil, FYM with all bio organic fertiliserorganic pesticides, fungicides, nutrients and plant growth regulators, etc. | 79 | cum | - | - |
| 10 | Planting of Dracena mahatma ornamental foliage shrub variety of height 30-45 cm in polythene bag of size 6x7 inch including loading and unloading charges, transportation, stacking of saplings at site, earth work excavation of required size, planting of sapling, refilling of excavated earth etc as directed by the site in-charge. (HC-W0059 PD-1647 P No.274) | 800 | Nos | - | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
bulidingandSWD.pdf
Tender Documents • 1.02 MB
ITB.pdf
Additional Documents • 0.19 MB
BOQ_851202.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .