Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹36.1 CrAdmitted-Finance | -15.67% | ₹36.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹36.5 CrAdmitted-Finance | -14.88% | ₹36.5 Cr | L2 | Admitted-Finance |
| 3 | L3₹37.0 CrAdmitted-Finance | -13.59% | ₹37.0 Cr | L3 | Admitted-Finance |
| 4 | L4₹38.1 CrAdmitted-Finance | -11.20% | ₹38.1 Cr | L4 | Admitted-Finance |
| 5 | L5₹39.2 CrAdmitted-Finance PLOT NO HIG 7 CHUNVATI LANE GOPALGAN BALASORE 756001 | BALESHWAR | ODISHA | 756001 | -8.58% | ₹39.2 Cr | L5 | Admitted-Finance |
Tender Value
₹42.9 Cr
EMD Value
₹52.9 L
Closing Date
15 May 2026, 3:00 pmClosed
Ashok Kumar K, Technical Officer D
CCE R AND D WEST PUNE
Design and Construction of Test, Evaluation and Upskilling Facility for Infrastructure Research Development at Pune
2026_DRDO_905787_1
CCEW/C2/20002/CIRD/CONS
Open Tender
Civil Works
730 days
Pashan
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹52.9 L
19 Jun 2026
18 Apr 2026
22 May 2026
20 Apr 2026
15 May 2026
5 May 2026
20 Apr 2026 - 30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SUB HEAD I : EARTH WORK & EXCAVATION | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m.
Note : No additional payment will be made for extra lift for mechanical Excavation | - | - | - | - |
| 1.02 | All kinds of soil. | - | - | - | - |
| 1.03 | a) lift upto 1.5 m | - | cum | - | - |
| 1.04 | b) Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.
All kinds of soil.
Note : No additional payment will be made for extra lift for mechanical Excavation | - | cum | - | - |
| 1.05 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m.
Note : No additional payment will be made for extra lift for mechanical Excavation | - | - | - | - |
| 1.06 | Ordinary rock | - | - | - | - |
| 1.07 | a) lift upto 1.5 m | - | cum | - | - |
| 1.08 | b) Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.
Ordinary rock
Note : No additional payment will be made for extra lift for mechanical Excavation | - | cum | - | - |
| 1.09 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains not exceeding 1.5m in width or 10 sqm on plan including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m.
Note : No additional payment will be made for extra lift for mechanical Excavation | - | - | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.87 MB
Enq1.pdf
Tender Documents • 11.85 MB
EnqPart02.pdf
Tender Documents • 21.95 MB
BOQ_952075.xls
BOQ • 1.69 MB
corrigendum06cird.pdf
PDF • 0.55 MB
corigendon05.PDF
PDF • 2.89 MB
corrigendum4.pdf
PDF • 0.80 MB
Corrigendum3.pdf
PDF • 0.86 MB
corrigendum2.pdf
PDF • 0.48 MB
Amndmnt01.pdf
PDF • 1.07 MB
Download all tender documents and submit your bid