| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Finance | ₹4.2 L | L1 | Admitted-Finance |
| 2 | L2₹4.2 L+₹1,687.40 (0.40%)Admitted-Finance | ₹4.2 L+₹1,687.40 (0.40%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical PROP NO A 80 FIRST FLOOR FLAT NO 3 CHATTAR PUR ENCLAVE PHASE 2 NEW DELHI SOUTH WEST DELHI DELHI 110074 | SOUTH DELHI | DELHI | 110074 | - | - | Rejected-Technical EMD not deposit |
| Sl No | Description | Qty | Unit | Prime India Associates L1 | Shiva Buildtech L2 |
|---|---|---|---|---|---|
| 1.01 | Shutting off of inlet valve of UGR and closing the inlet and outlet sluice valves of pump set after taking necessary shut down if required and taking all safety measures and tackles for closing the valves as per site requirement and directions of engineer in charge | 1 | Job | 4,990 ₹5,888.2 Lowest | 5,100 ₹6,018 |
| 1.02 | Dismantling the existing dismantling joint from the main Delivery line with the help of heavy manual labour. Cutting and removing rusted nuts, bolts, and fasteners with the help of a gas cutter, wherever required. Removing the rusted and damaged dismantling joint piece from the pipeline without causing damage to the adjoining pipeline and equipment. Lifting and shifting the dismantled material to the ground level with the help of heavy manual labour and suitable lifting tools/tackles, as per site requirements. The work shall include all labour, gas cutting, tools & tackles, consumables, safety precautions, and incidental works required for complete execution of the job, as directed by the Engineer-in-Charge. | 3 | Jobs | 29,970 ₹35,364.6 Lowest | 30,300 ₹35,754 |
| 1.03 | Isolation of the Delivery line of Pump Set and inlet of the UGR by providing and fixing a 600 mm dia blank flange to completely isolate the pipeline and prevent water leakage inside the pump house during maintenance work. The work shall include installation and subsequent removal of the blank flange, providing suitable gasket, nuts, bolts, tightening, all necessary tools & tackles, heavy manual labour, and taking all required safety precautions to ensure safe working conditions. The complete work shall be carried out as per site requirements and the directions of the Engineer-in-Charge. | 3 | Jobs | 44,850 ₹52,923 Lowest | 45,300 ₹53,454 |
| 1.04 | Fabrication, supply and fixing of 600 mm dia. Expansion Joint of 2'-2" (660 mm) length, Tie Rod – 06 Nos, fabricated from 12 mm thick MS plate, complete with heavy-duty MS flanges of suitable thickness welded at both ends. The flanges shall be provided with machine-drilled bolt holes matching the existing pipeline flange drilling pattern, complete with all necessary welding, cutting, grinding, drilling, testing, alignment, and installation at site. The expansion joint shall be fabricated as per the approved sample/site requirement, including all consumables, labour, tools & tackles, nuts, bolts, washers, and other incidental materials required for complete installation in all respects. | 3 | Jobs | 2,24,970 ₹2,65,464.6 Lowest | 2,25,150 ₹2,65,677 |
| 1.05 | S/O graphite packing 10 mm. DJB sor 25.1.3 Make:- Jyoti / Champion / DJB approved. | 25 | Kg | 21,475 ₹25,340.5 Lowest | 21,525 ₹25,399.5 |
| 1.06 | S/O 50% Neoprene rubber packing sheet Make:- Jyoti/National/DJB approved. | 80 | Kg | 17,520 ₹20,673.6 Lowest | 17,680 ₹20,862.4 |
| 1.07 | Testing and commissioning on full load after opening of all valves including cartage charges of both sides. | 1 | Job | 14,900 ₹17,582 Lowest | 15,050 ₹17,759 |
Tender Value
Refer Docs
EMD Value
₹8,500
Closing Date
14 Aug 2026, 11:15 amClosed
Executive Engineer (EnM) M-8
Office of the Executive Engineer (EnM) M-8 Nangloi Phase-III, Near Maharaja Surajmal Stadium Metro Station New Delhi-110041.
Replacement of 600 mm Expansion Joimnts of Pump Set Nos. 01, 05, 06 in Delivery line at New Avantika BPS under AC-06
2026_DJB_296493_1
NIT No.08 /EE(EnM)M-8/2026-27 Item 20
Open Tender
Civil Works
Works
30 days
Nangloi
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Account No SB 50448339804
₹8,500
Yes
24 Aug 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Shutting off of inlet valve of UGR and closing the inlet and outlet sluice valves of pump set after taking necessary shut down if required and taking all safety measures and tackles for closing the valves as per site requirement and directions of engineer in charge | 1 | Job | 80 | ₹80 |
| 1.02 | Dismantling the existing dismantling joint from the main Delivery line with the help of heavy manual labour. Cutting and removing rusted nuts, bolts, and fasteners with the help of a gas cutter, wherever required. Removing the rusted and damaged dismantling joint piece from the pipeline without causing damage to the adjoining pipeline and equipment. Lifting and shifting the dismantled material to the ground level with the help of heavy manual labour and suitable lifting tools/tackles, as per site requirements. The work shall include all labour, gas cutting, tools & tackles, consumables, safety precautions, and incidental works required for complete execution of the job, as directed by the Engineer-in-Charge. | 3 | Jobs | 80 | ₹240 |
| 1.03 | Isolation of the Delivery line of Pump Set and inlet of the UGR by providing and fixing a 600 mm dia blank flange to completely isolate the pipeline and prevent water leakage inside the pump house during maintenance work. The work shall include installation and subsequent removal of the blank flange, providing suitable gasket, nuts, bolts, tightening, all necessary tools & tackles, heavy manual labour, and taking all required safety precautions to ensure safe working conditions. The complete work shall be carried out as per site requirements and the directions of the Engineer-in-Charge. | 3 | Jobs | - | - |
| 1.04 | Fabrication, supply and fixing of 600 mm dia. Expansion Joint of 2'-2" (660 mm) length, Tie Rod – 06 Nos, fabricated from 12 mm thick MS plate, complete with heavy-duty MS flanges of suitable thickness welded at both ends. The flanges shall be provided with machine-drilled bolt holes matching the existing pipeline flange drilling pattern, complete with all necessary welding, cutting, grinding, drilling, testing, alignment, and installation at site. The expansion joint shall be fabricated as per the approved sample/site requirement, including all consumables, labour, tools & tackles, nuts, bolts, washers, and other incidental materials required for complete installation in all respects. | 3 | Jobs | - | - |
| 1.05 | S/O graphite packing 10 mm. DJB sor 25.1.3 Make:- Jyoti / Champion / DJB approved. | 25 | Kg | - | - |
| 1.06 | S/O 50% Neoprene rubber packing sheet Make:- Jyoti/National/DJB approved. | 80 | Kg | - | - |
| 1.07 | Testing and commissioning on full load after opening of all valves including cartage charges of both sides. | 1 | Job | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_394692.xls
BOQ • 0.26 MB
Corrigendum08.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .