Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical 1 SHAKTI NAGAR JAMMU JAMMU KASHMIR 180001 | JAMMU | JAMMU AND KASHMIR | 180001 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹6.1 L
EMD Value
₹12,200
Closing Date
5 Sept 2026, 1:00 pmClosed
Executive Engineer Mechanical RandB Division Pir P
o/o Executive Engineer Mechanical (RNB) Division Pir Panjal.
Fire Fighting Works for Construction of Cooperative Super Bazar at Haveli Poonch (Gplus2).
2026_PWDJK_322320_1
e-NIT No. 06 of 2026-27 dated 25.08.2026
Open Tender
Machineries/ Mechanical Engg Items
Percentage
60 days
Poonch
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer Mechanical (RNB) Division Pir P
₹12,200
Rajouri
5 Sept 2026
25 Aug 2026
5 Sept 2026
25 Aug 2026
5 Sept 2026
27 Aug 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Fire Fighting Works for Construction of Cooperative Super Bazar at Haveli Poonch (G+2). | 1 | Job | 6,06,975 | ₹6,06,975 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
Tendernotice_2.pdf
PDF • 0.67 MB
BOQ_1079833.xls
BOQ • 0.37 MB
CorrigendumTurnover.pdf
PDF • 0.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .