| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 CrAccepted-AOC | ₹9.2 Cr Quoted ₹9.4 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹9.4 Cr+₹3,459.38 (<0.01%)Rejected-Finance 56 LAKSHMANPUR COLONY ALLAHABAD ROAD SULTANPUR | SULTANPUR | SULTANPUR | UTTAR PRADESH | ₹9.4 Cr+₹3,459.38 (<0.01%) | L2 | Rejected-Finance Rejected Being Higher Rate |
| 3 | Not Admitted-Fee/PreQual/Technical F NO 302 SARANG RESIDENCY PLOT NO 29 OLD VIJAY NAGAR AGRA 282004 | AGRA | AGRA | UTTAR PRADESH | 282004 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹9.2 Cr
EMD Value
₹18.3 L
Closing Date
11 Feb 2025, 12:00 pmClosed
Aditya Kumar
SE Sultanpur Amethi Circle PWD Sultanpur
Widening and Strengthening of Karthuni Lalganj Dadra Gajanpur Duwariya Road Chanage 7-200 to 15-000 ODR in District Amethi Length 7-80 Km
2025_CEUFZ_1001563_1
296/ 1com. su.a cir / 2024-25 Dt 23.01.2025
Open Tender
Civil Works - Roads
Item Rate
365 days
Amethi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹18.3 L
Yes
SE Sultanpur Amethi Circle PWD Sultanpur
16 Apr 2025
3 Feb 2025
11 Feb 2025
3 Feb 2025
11 Feb 2025
3 Feb 2025
5 Feb 2025
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Providing and laying granular sub-base (GSB) by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in plant method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.As per Direction of E/I.
For T Jinction
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. As per MORT&H reff.- 406
For T Jinction
Providing, laying and spreading of graded stone aggregate (wet mix macadam) after mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying with 1% OPC Cement & 3.5% Emulsion in uniform single layers on sub- base /subgrade and compacting with road roller to achieve the desired density.
For T Jinction
Providing and applying tack coat with Bitumen VG-10 using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned . as per MORT&H Sp. 503. As per Direction of E/I.
For T Jinction
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous [email protected] per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finesher with senser control to the required grade,level and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the disiered compaction as per MoRT&H specifications clause 509 complete in all respects . As per Direction of E/I.
For T Jinction
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. as per SOR No.Chapter-4 (2.27)
P/L cement concrete 1:3:6 having 6 part of Stone Ballast (20 mm nominal size):3 part of coarse sand :1 part of cement and curing complete i/c suplly of all materials,labour & T&P etc. required for proper completion of work.As per direction of E/I.As per SOR chapter no.-5 (4.1.5)
Reinforced cement concrete in open foundation complete as per drawing and technical specification. As per MoRT&H S.I. No.-12.8 & Clause 1500,1700 & 2100 (M-25)
Supplying, fitting & placing HYSD bar reinforcement in foundation complete as per drawing & technical specifications. As per MoRT&H S.I. No.-12.4 & Clause 1600
Construction of earthen shoulders (Patries) with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 As per Direction of E/I.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. As per SI 280
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification.As per direction of E/I,As Per SI N0-288
Supplying, fitting and placing Mild steel reinforcement complete in foundation as per drawing and Technical Specification. As per direction of E/I,
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m.As per Direction of E/I.
Providing and laying in cement concrete 1:4:8 (1cement:4 fine sand:8graded stone ballast 40 mm nominal size) and curing complete including supply all materials, labour and T&P etc. required for proper completion of the work. As per SOR Chapter-5 (4.1.8)
Brick masonry work in 1:4 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications as per SOR Chapter-6 (6.1.1)
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but including the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately). All works above plinth level upto floor V level.As per SOR Chapter-5 (5.33.2)
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and Technical Specification
Plastering with cement mortar (1:4 ) on brick work in sub-structure.As per SOR Chapter-11 (13.4.1)
Earth work in excuavation in foundation trenches or drains (not exccding 1.5 m. in width or 10sqm.on plan) including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. As per SOR DAR 2.6.1
For 600mm
For 350 MM
Providing and laying in cement concrete 1:4:8 (1cement:4 fine sand:8graded stone ballast 40 mm nominal size) and curing complete including supply all materials, labour and T&P etc. required for proper completion of the work. As per MORTH Spe-2100
For 600mm
Providing and laying 40 mm gauge brick ballast below pipe and in sides As per SOR Chapter-1
For 600mm
For 350 MM
Supply of 1000 mm dia NP3 pipe.As per SOR
Supply of 600 mm dia NP3 pipe.As per SOR
Supply of 350 mm dia NP3 pipe.As per SOR
Laying & fixing of 1000 mm dia NP-3 pipe with collers As per Non Sch Item-12D SOR Chapter-17
Laying & fixing of 600 mm dia NP-3 pipe with collers As per Non Sch Item-12D SOR Chapter-17
Laying & fixing of 350 mm dia NP-3 pipe with collers As per Non Sch Item-12D SOR Chapter-17
Class 150 brick work in foundation and plinth with cement mortar 1:4 (1Cement :4 Coarse sand) As per DAR 6.1.1 SOR Chapter-6
For 600mm
Struck Cement Pointing on Brick work with cement mortar 1:2 (1 Cement : 2 Fine sand) As per DAR 13.32.1 SOR Chapter-11
For 600mm
12mm cement plaster in 1;3 cement & coarse sand mortar.As per DAR 13.4.1 SOR Chapter-11
For 600mm
Maintenance Cost @ 2.50% As per Go No. 17/2024/Sa-113/23-23-1-2024-23-1099/113/2023 Dt 16.01.2024 and 3689C/PRML/Mul-23-24 Dt 17.02.2024
KUMAR TRADERS (BID ID -4915468)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1783517.xls
BOQ • 0.31 MB
162381924.pdf
Tender Documents • 4.51 MB
162381925.pdf
Tender Documents • 0.18 MB
162381926.pdf
Tender Documents • 0.36 MB
162381927.pdf
Tender Documents • 0.18 MB
162381928.pdf
Tender Documents • 0.03 MB
162381930.html
Tender Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .