Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹3.4 L
EMD Value
₹3,500
Closing Date
16 Aug 2023, 3:00 pmClosed
Block Development Officer,Kodaokanal
Block Development Officer,Kodaokanal
AGAMT II 2022 - 2023 Poondi
2023_RDTN_355979_1
AGAMT II 2022 - 2023 Poolathur
Open Tender
Civil Works
Works
Block Development Officer, Kodaokanal
AGAMT II 2022 - 2023 Poondi
4 documents required · 4 mandatory
₹3,500
Kodaikanal Panchayat Union
₹3,500
Yes
Block Development Officer,Kodaokanal
16 Aug 2023
7 Aug 2023
16 Aug 2023
7 Aug 2023
16 Aug 2023
7 Aug 2023
7 Aug 2023
Amount
Part 1 : Construction of Cement Concrete Drainage for Suppiramani House to Ramaraj House @ Poolathur H/O Poolathur. With Horizondal Filter.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed of foundation.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including all cost and conveyance etc., complete.
Supply and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90X40cm and BG for stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10-13cm dia spaced at 75cm c/c etc. complete.
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete for 10m3
Plastering with C.M 1:4 mix to 20mm metal including all material and all labour chargers etc., Complete
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed of foundation.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including all cost and conveyance etc., complete.
Cement concrete 1:2:4 mix using 20 mm ISS metal including cost and conveyance of all materials to site and labour charges for mixing, laying, and curing etc complete for 10 cum
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Filling with 40mm HBG metal including all conveyance of all materials to site and all labour charges etc complete
Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification.
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Filling the soak pit with 20mm metal as per specification
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and fixing P.V.C rainwater down fall pipe of 110m dia with necessary shoes, bends,& clamps etc.,
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
CHANDRAN CONTRACTOR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .