| 1 | L1₹9.8 LAccepted-AOC | L1 | Accepted-AOC WORK ORDER | |
| 2 | L2₹10.1 L+₹38,605.46 (3.96%)Rejected-Finance SOUTH THOTTAM PALAKKANTHU PO DINDIGUL WEST TALUK DINDIGUL 624 019 TAMIL NADU | 624019 | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | P S STALIN CONTRACTOR L2 | KANDASAMY L1 |
|---|---|---|---|---|---|
| 1.00Name of the work : 1 Providing Additional facilities with New bore well to Community hall at Kuttathupatti, H/O Kuttathupatti Estimate Amounts :10.00 Lakhs | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 45.92 | m3 | 273 ₹12,536.16 | 263 ₹12,076.96 Lowest |
| 3.00 | Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 3.39 | m3 | 1,858 ₹6,298.62 | 1,787 ₹6,057.93 Lowest |
| 4.00 | Cement Concrete 1:4:8 (One Cement, Four sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 15.71 | m3 | 5,642 ₹88,635.82 | 5,425 ₹85,226.75 Lowest |
| 5.00 | Brick work in Cement Mortar1:5 (one cement and five sand) using best quality of country bricks of size 8-3/4" x 4-1/4" x 2-1/4" for foundation and basement including curing, etc., complete complying with standard specifiction. | 14.81 | m3 | 6,387 ₹94,591.47 | 6,142 ₹90,963.02 Lowest |
| 6.00 | Cement Concrete 1:2:4(One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, finishing, curing, etc., complete complying with standard specification and as directed by the departmental officers | 5.69 | m3 | 6,998 ₹39,818.62 | 6,729 ₹38,288.01 Lowest |
| 7.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification | 6.48 | m3 | 46 ₹298.08 | 45 ₹291.6 Lowest |
| 8.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton | 77.76 | m2 | 1,138 ₹88,490.88 | 1,095 ₹85,147.2 Lowest |
| 9.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. | 0.8 | MT | 95,615 ₹76,492 | 91,938 ₹73,550.4 Lowest |
| 10.00 | Reinforced Cement Concrete 1:1.5:3 (One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, finishing, curing, etc., complete complying with standard specification and as directed by the departmental officers | 9.29 | m3 | 9,534 ₹88,570.86 | 9,168 ₹85,170.72 Lowest |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
13 Feb 2026, 3:00 pmClosed
The Project Director DRDA Dindigul
The Project Director DRDA Dindigul
Capital Grant Fund Savings and Interest Scheme 2025- 2026 Providing Additional facilities with New Bore well to Community Hall at Kuttathupatty in Reddiyarchatram block of Dindigul District Package No. TN05-133
2026_RDTN_652843_1
DIPR-542-Tender 2026
Open Tender
Civil Works
Item Wise
90 days
DRDA DINDIGUL
Capital Grant Fund Savings and Interest Scheme 2025- 2026 Providing Additional facilities with New Bore well to Community Hall at Kuttathupatty in Reddiyarchatram block of Dindigul District Package No. TN05-133
2 documents required · 2 mandatory
₹0
₹10,000
DRDA DINDIGUL
1 Apr 2026
7 Feb 2026
13 Feb 2026
7 Feb 2026
13 Feb 2026
7 Feb 2026
11 Feb 2026
Name of the work : 1 Providing Additional facilities with New bore well to Community hall at Kuttathupatti, H/O Kuttathupatti Estimate Amounts :10.00 Lakhs
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:4:8 (One Cement, Four sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Brick work in Cement Mortar1:5 (one cement and five sand) using best quality of country bricks of size 8-3/4" x 4-1/4" x 2-1/4" for foundation and basement including curing, etc., complete complying with standard specifiction.
Cement Concrete 1:2:4(One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, finishing, curing, etc., complete complying with standard specification and as directed by the departmental officers
Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification.
Reinforced Cement Concrete 1:1.5:3 (One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, finishing, curing, etc., complete complying with standard specification and as directed by the departmental officers
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials & all labour charges etc., complete.
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 200mm x 200mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
White washing two coats with shell lime including cost & conveyance of all materials to site and all labour charges etc.complete.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.
Painting two coats of newly plastered wall surface with ready mixed plastic Exterior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification.
Towards supply and delivery of steel door as per std. Specification of size 0.90m x 2.00m
Provistion NameBoard
borewell
Towards the cost of Providing Geophysical investigation survey including all charges etc.,complete
Drilling of 150mm dia vertical borewell in hard rock area as per the recommendation of hydrogeolegist including the rig transportation inserting of casing pipe and flushing etc.,complete-
Upto 150m from ground level
From 150m to 180m
Supply and insertion of 180 mm dia 6KSC PVC casing pipe with ISI mark including all charges etc.,complete
Supply and delivery of the following
Supply and delivary of 3 Phase Submersible Pumpset Suitable for 150mm dia borewell with ISI Mark without Panel board having Duty of 50Lpmx 225m -2.00 HP including cost and conveyance and all charges etc.,complete
Supply and delivary of 3 Phase Panel board -Star delta with two level guard and Auto start for2.5Hp including all etc.,complete
Supply and delivary of PVC insulated and sheathed 3 Core Flat type 2.5 Sq .mm Submersible copper cable with ISI Mark including all etc.,complete
Supply and delivary of 40mm uPVC Column Pipes with ISI mark including all etc.,complete (800 feet)
40mm dia GI Hex Nipple
40mm dia GI Bend
40mm dia GI Coupler
40mm dia CI Check valve
Erection pipeclamp(Heavy)
Borewell cover PVC
20mm dia PVC pipe (Super thick) for Cable encansing
20mm dia PVC bend
Pumping Main line from Borewell
Supply of 63m dia PVC Pipe 4 Kg/sq.cm
Supply of 63m dia PVC Coupler
Supply of 63mm dia PVC Elbow
Supply of Solvent cement
Supply of 2000 litre Capacity water storage tank
Labour charges for erection of 7.50 HP Submersible pumpset into the Borewell with Riser pipes, cables with proper clamping,valves fixing,cable jointing and wiring from EB pole to Kiosk fixing of main switch Panel board etc Complete and testing the pumpset and trail run etc.,complete.
Earth work excavation in hard stiff clay and hard rock earth and lowering and laying, Jointing of pipes and refilling the trench with excavation soils, well rammed and consolidated after the pipes and specials are laid, jointed and tests including all labour charges etc.,complete
Pumping main line - 63mm OD PVC 4 KSC Pipe
Cable line
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_782801.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .