Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-AOC OPPOSIT RELIANCE PETROL PUMP NEAR SINGLA DHARAM KANTA SIRSA ROAD FATEHABAD FATEHABAD HARYANA 125050 | FATEHABAD | HARYANA | 125050 | ₹3.5 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹3.5 Cr+₹2 L (0.58%)Rejected-AOC | ₹3.5 Cr+₹2 L (0.58%) | L2 | Rejected-AOC L2 Bidder |
| 3 | L3₹4.2 Cr+₹76 L (22.0%)Rejected-AOC 104 105 SUNEJA TOWER 1 DISTRICT CENTRE JANAKPURI NEW DELHI DELHI 110058 | WEST DELHI | DELHI | 110058 | ₹4.2 Cr+₹76 L (22.0%) | L3 | Rejected-AOC L4 Bidder |
| 4 | L4₹5.6 Cr+₹2.1 Cr (61.4%)Rejected-AOC 309 SKYLARK BUILDING 309 SKYLARK BUILDING 60 NEHRU PLACE NEW DELHI NEW DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | ₹5.6 Cr+₹2.1 Cr (61.4%) | L4 | Rejected-AOC L5 Bidder |
Tender Value
₹6.7 Cr
EMD Value
₹13.4 L
Closing Date
4 Apr 2022, 3:00 pmClosed
GM (CNS-WR)
GM (CNS-WR), AAI, Integrated Operational Office Building, New Airport colony, Vile Parle East, Mumbai
S.I.T.C. of Critical Operations Power System COPS and Accessories at Mopa Airport
2022_AAI_110193_1
AAI/CNSWR/COPS/MOPA/2022
Open Tender
Miscellaneous Works
Tender cum Auction
84 days
AAI MOPA AIRPORT
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,800
Yes
₹13.4 L
Yes
Virtual meeting on 23.03.2022 at 1130 Hrs.
28 Apr 2022
16 Mar 2022
5 Apr 2022
16 Mar 2022
4 Apr 2022
16 Mar 2022
16 Mar 2022 - 23 Mar 2022
23 Mar 2022
Amount
CRITICAL OPERATIONS POWER SYSTEM BUS to serve full Load rated Capacity of 2X100 KVA WITH ALL ACCESSORIES BATTERY BACKUP.
CRITICAL OPERATIONS POWER SYSTEM BUS to serve full Load rated Capacity of 30KVA WITH ALL ACCESSORIES AND BATTERY BACKUP.
K-13 ISOLATION TRANSFORMER 280 KVA for COPS of 2X100 KVA With all Accessories.
K-13 ISOLATION TRANSFORMER 45KVA for 30 KVA COPS With all Accessories
K13 ISOLATION TRANSFORMER 80 KVA With all Accessories
K13 ISOLATION TRANSFORMER 30 KVA With all Accessories
K13 ISOLATION TRANSFORMER 15 KVA
Static Switch With all Accessories
PDU With all Accessories
Power Cable 16 sq mm, 3core XLPE insulated, PVC sheathed cable
Cable Tray 150mm X 50mm wide with installation accessories
Monitoring & Control System Software for Items No. 1 to 7 and other as specified in the document.
SERVER Hardware
Network Switch
NETWORK TIMING PROTOCOL SERVER:
46” Intelligent Monitor.
MAINTENANCE LAPTOP
Ethernet Cat – 6A STP cables with shielded connectors and other accessories etc. as per the site requirements
Cat 6A U/FTP LSZH Patch Cord:
19” Equipment Rack 42 RU and Accessories
Equipment Rack 9 RU and Accessories
Hardware for Integrating NO/NC Contact of MCCB of Panels & DB and accessories.
Installation Material & Accessories needed for installation of items/components as specified in the document.
Cost of 1st calendar years Onsite Operational Performance Comprehensive Annual Maintenance (OOPCAM), inclusive of all spares & battery after completion of 03 calendar years OOPMW after Successful SAT.
Cost of 2nd calendar years Onsite Operational Performance Comprehensive Annual Maintenance (OOPCAM), inclusive of all spares & Battery after completion of 03 calendar years OOPMW after Successful SAT..
Cost of 3rd calendar years Onsite Operational Performance Comprehensive Annual Maintenance (OOPCAM), inclusive of all spares & battery after completion of 03 calendar years OOPMW after Successful SAT.. .
Cost of 4th calendar years Onsite Operational Performance Comprehensive Annual Maintenance (OOPCAM), inclusive of all spares & battery after completion of 03 calendar years OOPMW after Successful SAT..
Cost of 5th calendar years Onsite Operational Performance Comprehensive Annual Maintenance (OOPCAM), inclusive of all spares & battery after completion of 03 calendar years OOPMW after Successful SAT..
Cost of 6th calendar years Onsite Operational Performance Comprehensive Annual Maintenance (OOPCAM), inclusive of all spares & battery after completion of 03 calendar years OOPMW after Successful SAT..
Cost of 7th calendar years Onsite Operational Performance Comprehensive Annual Maintenance (OOPCAM), inclusive of all spares & battery after completion of 03 calendar years OOPMW after Successful SAT..
SITC of Replacement of batteries at the end of Third year after successful completion of SAT.
SITC of Replacement of batteries at the end of Sixth year after successful completion of SAT
SITC of Replacement of batteries at the end of Ninth year after successful completion of SAT.
Bidder Name
Amount in Words
INFOSOFT DIGITAL DESIGN AND SERVICES PVT. LTD.
Nikom InfraSolutions Pvt. Ltd.
VITS TOTAL POWER SOLUTIONS PRIVATE LIMITED
LABOTEK
LABOTEK
INFOSOFT DIGITAL DESIGN AND SERVICES PVT. LTD.
Nikom InfraSolutions Pvt. Ltd.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .