Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-AOC | ₹19.7 L | L1 | Accepted-AOC L1 Accept |
| 2 | L2₹19.9 LRejected-Finance | ₹19.9 L | L2 | Rejected-Finance L21 Reject |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Withdraw |
| Sl No | Description | Qty | Unit | L D RAJENDRAN L2 | SRI POLINCHI AND CO L1 |
|---|---|---|---|---|---|
| 1.00Strengthening to the Main Road @ Sri Lankan Refugee Camp Thoppukkollai in Thiruvarankulam Panchayat | |||||
| 2.00 | Earthwork excavation and depositing on bank with in itial lead and lift in all clauses of soils such as hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams as per SS20A including sectioning and breaking clods for widenting and raining the berms. | 98.55 | Cum | 145 ₹14,289.75 | 140.3 ₹13,826.57 |
| 3.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) | 184.78 | Cum | 2,650 ₹4.9 L | 2,627.5 ₹4.9 L |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 171.09 | Cum | 2,700 ₹4.6 L | 2,690.5 ₹4.6 L |
| 5.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,368.75 | Sqm | 85 ₹1.2 L | 84.7 ₹1.2 L |
| 6.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 1,368.75 | Sqm | 20 ₹27,375 | 19.5 ₹26,690.63 |
| 7.00 | Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 34.22 | Cum | 11,450 ₹3.9 L | 11,359.4 ₹3.9 L |
| 8.00 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms | 32.85 | Cum | 455 ₹14,946.75 | 452.3 ₹14,858.06 |
| 9.00 | Providing HM stones etc., complete | 2 | Nos | 575 ₹1,150 | 570 ₹1,140 |
| 10.00 | Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation. | 22.74 | Cum | 265 ₹6,026.10 | 263.5 ₹5,991.99 |
Tender Value
₹20.2 L
EMD Value
₹20,160
Closing Date
31 Oct 2025, 3:00 pmClosed
Bdo,Thiruvarankulam
Pt.Uniion Office,Thiruvarankulam
Strengthening to the Main Road at SriLangan Refugee Camp Thoppukkollai in Thiruvarankulam Panchayat
2025_RDTN_617386_1
Tvk/STRCS/Work-11
Open Tender
Civil Works
Thiruvarankulam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹20,160
13 Dec 2025
25 Oct 2025
31 Oct 2025
25 Oct 2025
31 Oct 2025
25 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
Tvk-Doc--11.pdf
Tender Documents • 0.30 MB
BOQ_737816.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid