| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 CrAccepted-AOC | ₹6.1 Cr | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹6.2 Cr+₹10.6 L (1.73%)Rejected-Finance KOLLIDAM | ₹6.2 Cr+₹10.6 L (1.73%) | L2 | Rejected-Finance Highest Amount Quoted |
Tender Value
₹6.3 Cr
EMD Value
₹6.3 L
Closing Date
10 Jul 2024, 3:00 pmClosed
District Collector,Mayilduthurai
District Collector,Mayilduthurai
Construction of 100 houses, Arch and Periyar Statue at Periyar Ninaivu Samathurapuram in Edamanal Panchayat in Kollidam Block in Mayiladuthurai District Periyar Ninaivu Samathurapuram 2023-24
2024_RDTN_457484_1
DIPR.2052/Tender/2024 dt 21.06.2024
Open Tender
Civil Works - Buildings
Item Rate
270 days
Edamanal
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹6.3 L
District Collector Office,Mayiladuthurai
30 Jan 2025
26 Jun 2024
10 Jul 2024
27 Jun 2024
10 Jul 2024
27 Jun 2024
2 Jul 2024
Amount
Construction of 100 houses at Periyar Ninaivu Samathurapuram Edamanal Panchayat at Kollidam Panchayat Union in Mayiladuthurai District under Periyar Ninaivu Samathurapuram 2023-24
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
filling with good river sand including cost and conveyance of material to work site and all labour charges etc complete
Plain Cement Concrete 1:4:8 mix using 100mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
Brick in cm 1:5 which using country bricks of 8 3/4'' * 4 1/4'' * 2 1/4'' includidng cost and conveyence of materials from approved quarry to work site and all labour charges for laying and curing etc ccomplete as per standard specification (Below basement)..
Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. Above basement
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C slab & Lintel including all material to work site etc complete.for Shuttering
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C slab & Lintel including all material to work site etc complete.for Centering
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Special ceiling Plastering in CM 1:3 ,10mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plastering in CM 1:5 ,12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
Weathering course Brick jelly 20mm lime concrete 0.075 thick including cost and conveyance etc.,
Providing one course of pressed tiles of size 20x20x2 cm over brickjelly lime concrete including cost and conveyance of all materials to work site and all labour charges for watering, curing and all other incidental charges etc., complete.
Providing granolethic floor finish ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
White washing two coats with shell lime including all materials to site cost and conveyance etc complete.
Painting the plastered wall surfaces with two coats oil bound distemper (inside the building) of approved quality and colour over one coat of wall primer including clearing surface in all floors etc complete with standard specification
Painting the newly plastered wall surface with two coats of Plastic Emulsion Paint outside the building over one coat of cement primer including clearing the surface in all floors etc., complete as per standard specification.
Painting two coats over iron steel works with ready mix paint of approved colour and trade including cost and conveyance of all materials and all other labour charges etc., complete.
Wiring with 2 x 1.50 sqm ( 22/0.3 ) PVC insulated unsheathed single core Copper Conductor of 1100 v Grade in suitable PVC Rigid Pipe on wall and ceiling with PVC accesseries with TW Switch box with 5 A F . T . Switch with painting of suitable colour for Light Point and Fan Point ( For Electronic Regulator ) S D N o25
Supply and Fixing of 11 W CFL in the existing light point SD 80
Supply and fixing of single box type 4" 40w flu fitting complete with electronic ballast with TW round on wall or ceiling with flu tupe with PVC unsheathed Copper leads from terminals to the fittings SD 88
Suplying and Fixing of 1200mm (48") AC ceiling fan complete with stepped Regulator as per standard specifications.SD107
Supply and Fixing of Water TIGHT Bulk Head fitting with Guard for incandescent lamp with 60 w Bulb SD 84
Wiring with 2x1.50 sqm PVC insulated unsheated Sc.alu Cable of conductor of 1100V grade insulated for open plug point .SD134
Supply and fixing of 16 Amps DPIC Switch of 500 V with Metal Clad with fuse and neutral with (SD 141) Main
Supply and fixing of TNEB meter Board Suitable For 32 A Single Phase sc .With 32 A Fuse Unit etc., SD 125
Supply and run off 4x6 sqm PVC unsheated Sc unsheated , Copper Conductor of 1100V grade for Service Main SD 73
Supply and fixing run off 2x1.50sqm PVC insulated Sc . Un sheated Sc conductor of 1100 v grade on 7/20 GI Bearer wire for Service Main (SD 64)
Provision for new steel Window 0.90*1.20m of 4nos
Provision for new steel Door 0.90*2.10m of 3nos
Provision for new steel Toilet Door 0.75*1.80m of 1nos
Towards labour charges for new steel Door including all charges etc complete.
Towards cost and fixing of RCC Rings 900mm dia 4nos and cover slab 1nos
Towards cost and fixing of sanitary pipe and vent pipe 110mm dia 3.00m including all charges etc complete.
Towards cost and fixing of Indian water closet including all charges etc complete.
Construction of Periyar statue at Samathuvapuram in Edamanal Panchayat
Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with intial lead and lift asper SS 20 B including shoring baling out water where necessary etc. complete for foundation.
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
CC 1:4:8 mix using 40metal including cost and conveyance of all labours charges etc complete and conveyance of all materials to site and all labour charges etc complete -10 cum
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Provision for Periyar statue
Erection charges for periyar statue
Construction of Arch at Samathuvapuram in Edamanal panchayat.
Earth work excavation and depositing on bank with all lead and lift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, stoneyearth mixed with 50% fair mixed boulders, hard gravellyetc except sand and rock requiring blasting with all incidental charges etc., complete for foundation as per SS 20B etc. complete.
Filling in basement with good river sand including cost and conveyance of all labour charges, sand salacking ramming etc., complete.
Cement concrete in CM 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and labour charges, cement which will be supplied bydept shoring shuttering baling out water etc., complete for foundation & Basement etc., complete
RCC 1:1 1/2:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site exculding cost and fabrication of steel with all labour charges for laying mixing concrete curing compacting for labour with centering arrangement all including charges etc., complete for Plinth Beam.
RCC 1:1 1/2:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site exculding cost and fabrication of steel with all labour charges for laying mixing concrete curing compacting for labour with centering arrangement all including charges etc., complete for Column
RCC 1:1 1/2:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site exculding cost and fabrication of steel with all labour charges for laying mixing concrete curing compacting for labour with centering arrangement all including charges etc., complete for Tie Beam
Supplying and fabrication of steel for RCC works including cost and conveyance of steel to site including labour charges for cutting bending and tying rods and placing the grills in position for premeasurement asper steel schedule.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country) wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Brick work in CM 1:5 mix using country bricks of size 8 3/4" x 4 1/4" x 2 1/4 including cost and conveyance of all materials to site and cement which will be supplied by dept. including watering curing and other labour charges etc., complete
Plastering with CM 1:3 mix 10mm thick including cost and conveyance of all materials and labour charges etc., complete.
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext. Emul. Paint for 1 Sqm
provision for photos
Provision for ornamental works.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
jj engineering construction (BID ID -1078329)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .