Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 CrSame as L1Rejected-Finance | ₹1.7 CrSame as L1 | L2 | Rejected-Finance L2 |
| 3 | L2₹1.7 CrSame as L1Rejected-Finance | ₹1.7 CrSame as L1 | L2 | Rejected-Finance L2 |
| 4 | L2₹1.7 CrSame as L1Rejected-Finance | ₹1.7 CrSame as L1 | L2 | Rejected-Finance L2 |
| 5 | L2₹1.7 CrSame as L1Rejected-Finance | ₹1.7 CrSame as L1 | L2 | Rejected-Finance L2 |
Tender Value
₹2.0 Cr
EMD Value
₹5.9 L
Closing Date
26 Sept 2025, 3:00 pmClosed
CE
Ghaziabad Nagar Nigam
Work No-84 Construction work of drain wall from SA-01 to SG-15 in Ward 47, Shastri Nagar.
2025_DOLBU_1071841_82
091/Nirman/2025-26 Date 03.09.2025
Open Tender
Civil Works
Percentage
CE
Please refer Tender documents.
2 documents required · 2 mandatory
₹12,154
₹5.9 L
4 Dec 2025
11 Sept 2025
26 Sept 2025
11 Sept 2025
26 Sept 2025
11 Sept 2025
eProcurement System Government of Uttar Pradesh Created By: narendra kumar chaudhary Created Date/Time: 20-Nov-2025 06:42 PM Tender Title: Work No-84 Construction work of drain wall from SA-01 to SG-15 in Ward 47, Shastri Nagar. Tender ID: 2025_DOLBU_1071841_82
Tender Inviting Authority: GHAZIABAD MUNICIPAL CORPORATION
Name of Work: WARD 47 SHASTRI NAGAR MAIN HAPUR CHUNNGI A-1 SE G - 15 TAK BADE NALE KI RETENING WALL NIRMAAN KA KARYA.
Contract No: 091/Nirman/2025-26 Dt. 03.09.2025
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 M/S NORTH INDIA DEVELOPERS (GSTN-09BOKPK0295Q1Z5) BID ID -5557090 19678032.03 -15.00 16726327.22 One Crore Sixty Seven Lakh Twenty Six Thousand Three Hundred and Twenty Seven
2.00 Cotec Builders (GSTN-09AQYPS9170K3ZI) BID ID -5561369 19678032.03 -15.00 16726327.22 One Crore Sixty Seven Lakh Twenty Six Thousand Three Hundred and Twenty Seven
3.00 PREM CONSTRUCTION (GSTN-09BAQPS7782G2ZQ) BID ID -5561647 19678032.03 -15.00 16726327.22 One Crore Sixty Seven Lakh Twenty Six Thousand Three Hundred and Twenty Seven
4.00 SHREEJI INFRAPROJECTS P LTD (GSTN-09AAPCS1939L1ZM) BID ID -5561975 19678032.03 -15.00 16726327.22 One Crore Sixty Seven Lakh Twenty Six Thousand Three Hundred and Twenty Seven
5.00 AKASHINFRATECH (GSTN-09ABPPC2937C2ZN) BID ID -5563997 19678032.03 -15.00 16726327.22 One Crore Sixty Seven Lakh Twenty Six Thousand Three Hundred and Twenty Seven
6.00 ZUBER CONSTRUCTIONS (GSTN-NA) BID ID -5548821 19678032.03 -15.00 16726327.22 One Crore Sixty Seven Lakh Twenty Six Thousand Three Hundred and Twenty Seven
7.00 Raj Shyama Constructions Pvt. Ltd. (GSTN-NA) BID ID -5558232 19678032.03 -15.00 16726327.22 One Crore Sixty Seven Lakh Twenty Six Thousand Three Hundred and Twenty Seven
Lowest Amount Quoted BY: ZUBER CONSTRUCTIONS,M/S NORTH INDIA DEVELOPERS,Raj Shyama Constructions Pvt. Ltd.,Cotec Builders,PREM CONSTRUCTION,SHREEJI INFRAPROJECTS P LTD,AKASHINFRATECH(16726327.22)
BOQ Summary Details Tender Title: Work No-84 Construction work of drain wall from SA-01 to SG-15 in Ward 47, Shastri Nagar. Tender ID: 2025_DOLBU_1071841_82
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 ZUBER CONSTRUCTIONS (BID ID -5548821) 16726327.22 L1
2 M/S NORTH INDIA DEVELOPERS (BID ID -5557090) 16726327.22 L1
3 Raj Shyama Constructions Pvt. Ltd. (BID ID -5558232) 16726327.22 L1
4 Cotec Builders (BID ID -5561369) 16726327.22 L1
5 PREM CONSTRUCTION (BID ID -5561647) 16726327.22 L1
6 SHREEJI INFRAPROJECTS P LTD (BID ID -5561975) 16726327.22 L1
7 AKASHINFRATECH (BID ID -5563997) 16726327.22 L1
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .