GEMC-511687731028726
Awarded to VARINDER KUMAR BANSAL CONTRACTOR
₹39.0 L
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| 1 | General Cleaning of Lab shelves, benches, working tables, reagent bottles, glass wares and instruments etc . | HSN not specified by seller | 365 days | 1,084 | 395,660 |
| 2 | To carry samples from various plants and sites like cooling towers , stores, coal handling area , effluent drains, urea silo, effluent ponds, ash ponds, water ponds, sub soil water, lube oil, petrol, diesel etc | HSN not specified by seller | 365 days | 1,220 | 445,300 |
| 3a | a) Preparation of coal samples, grinding & sieving. | HSN not specified by seller | 700 each | 20 | 14,000 |
| 3b | b) Cutting & Testing of HDPE Bags ( 216) test specimens per lot) | HSN not specified by seller | 130 each | 50 | 6,500 |
| 3c | c) Preparation of scale samples by grinding etc. | HSN not specified by seller | 55 each | 50 | 2,750 |
| 4a | a) Shifting of HVS machines to Air Monitoring Station No.1, 2 & 3 for sampling etc. | HSN not specified by seller | 104 round | 45 | 4,680 |
| 4b | b) Shifting of Stack Monitoring Kit to SGP, CPP, Ammonia & Urea Prilling Tower etc | HSN not specified by seller | 50 round | 70 | 3,500 |
| 4c | c) Assistance for work room study | HSN not specified by seller | 12 round | 24,000 | 288,000 |
| 4d | d) Assistance for boundary wall sampling | HSN not specified by seller | 104 round | 70 | 7,280 |
| 5 | Shifting of material like LPG, O2, H2, N2, and He cylinders, chemicals, Glassware, and instrument etc from stores to C.Lab/Plant Labs and vice versa. Weight per trip is up to 100 Kg Approx. Hand cart will be provided by NFL free of cost | HSN not specified by seller | 130 round | 29 | 3,770 |
| 6 | Shifting of instruments / equipments for repairs etc from Central Lab/ Plant Labs toInstrument,mechanical,electricalworkshop& Stores etc and vice versa. Weight per trip is up to 100 Kg Approx. Hand cart will be provided by NFL free of cost | HSN not specified by seller | 50 round | 47 | 2,350 |
| 7 | To deliver dak /documents etc from Central lab to Plant labs and various departments/stores etc and vice versa. | HSN not specified by seller | 300 days | 1,000 | 300,000 |
| 8 | PLANT LABS To carry samples like Raw material, Cooling water , effluent , oil & various water & gas samples etc from AFCP, SGP, CPP, DM , Urea , ETP plants and stores etc to Central Lab , Ammonia Lab, Urea Lab, DM Lab etc and General Cleaning of Plant Labs shelves, benches, working tables, reagent bottles, glass wares and instruments etc in General shift, A,B and C shifts. | HSN not specified by seller | 1,464 man days | 1,191 | 1,743,624 |
| 9 | Supply of manpower (if required) for unforeseen jobs | HSN not specified by seller | 150 man days | 100 | 15,000 |
| 10 | Upkeep of floors washroom and peripheral area of central lab | HSN not specified by seller | 365 man days | 914 | 333,610 |
| 11 | Cleaning of Agrochemical lab`s floors, slabs and sample collection(Raw material & Product) | HSN not specified by seller | 365 man days | 914 | 333,610 |