Tender Value
₹6.7 L
EMD Value
₹13,443
Closing Date
13 Oct 2026, 5:00 pm
Executive Officer
nagar palika parishad shamli
Ward 14 sarvarpeer road Construction of rcc drain from house of amit to ikbal
2026_DOLBU_1187726_64
330/E-T/PWC/2026-27
Open Tender
Civil Works
Percentage
30 days
Ward 14 sarvarpeer road Construction of rcc drain
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Officer
₹13,443
22 Sept 2026
22 Sept 2026
14 Oct 2026
22 Sept 2026
13 Oct 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Reinforced Cement Concrete by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in 1 volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 4.05 | Cum | 1,032 | ₹4,179.6 |
| 2 | Cartage of Ballast, Kankar, Coal, Grit or Sand etc. including loading and unloading but excluding stackings on pucca roads. Upto 8 Km. | 3.65 | Cum | 230.1 | ₹839.87 |
| 3 | Construction of embankment with approved material obtained from borrow pits with a lift upto 15 m, transporting to site, spreading. grading to requred slope and compacting to meet requirement of Tables 300 1 and 300 2 with a lead upto 1000 m as per Technical Specification Clause 301 5 I/c all cess. Labour cess, levy. toll fee, royalty. Contractor Profit but excluding GST | 168.92 | Cum | 340.4 | ₹57,500.37 |
| 4 | Plain/reinforced cement concrete (R.C.C grade M 25) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. I/c all cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. VI (i) For height upto 5 | 18.63 | Cum | 7,245.99 | ₹1,34,992.79 |
| 5 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 l/c all taxes, Labour cess, levy, toll fee, royalty, Profit but excluding GST | 10.24 | Qtl | 7,080.7 | ₹72,506.37 |
| 6 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (172.60x0.735x110.21)/107=130.66) | 50 | Kg | 130.65 | ₹6,532.5 |
| 7 | WBM Grading 3 - Providing, laying, spreading and compacting stone aggregates of specific sizes 53 mm to 22.4 mm to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST | 23.76 | Cum | 3,389.17 | ₹80,526.68 |
| 8 | Cement Concrete Pavement - Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound | 29.7 | Cum | 6,979.3 | ₹2,07,285.21 |
| 9 | Plain/reinforced cement concrete (R.C.C grade M 20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. I/c all cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. VI (i) For height upto 5 m | 0.84 | Cum | 6,249.3 | ₹5,249.41 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
technicaldocument.pdf
Tender Documents • 1.52 MB
BOQ_2237845.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .