Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.4 LAccepted-AOC ROAD NO 04 JANARDHAN NAGAR LOHEGAON PUNE 411047 | PUNE | PUNE | MAHARASHTRA | 411047 | L1 | Accepted-AOC L1 | |
| 2 | L2₹25.2 L+₹7.3 L (40.8%)Rejected-Finance | L2 | Rejected-Finance Not Reasonable | |
| 3 | L3₹57.6 L+₹39.7 L (221.6%)Rejected-Finance | L3 | Rejected-Finance Not Reasonable | |
| 4 | Rejected-Technical | - | Rejected-Technical Firm banned by HQ CWE (A) Mumbai due to non submission of DD within stipulated time vide their letter No 80603/Gen/33/E8 dt 12 Aug 2022. | |
| 5 | Rejected-Technical | - | Rejected-Technical Due to firm not enlisted for appropriate category d (i). |
Tender Value
₹39 L
EMD Value
₹78,000
Closing Date
10 Aug 2022, 6:00 pmClosed
Saurabh Gupta, EE
GE (W) Colaba, Mumbai
MAINTENANCE OF ALMIRAH AND OTHER FURNITURE AT OTM/MD BUILDINGS UNDER GE (WEST) COLABA, MUMBAI
2022_MES_526747_2
8646/E8
Open Tender
Civil Works
Item Rate
300 days
GE (W) Colaba
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE (W) Colaba, Mumbai
₹78,000
Yes
30 Aug 2022
7 Jul 2022
12 Aug 2022
7 Jul 2022
10 Aug 2022
21 Jul 2022
Amount
(I) Almirah Large Steel with four shelf : DRG NO FD-1031
(a) M & L for spot welding/run welding not exceeding 2.5 cm in length to steel items made of steel sheet including scrapping, preparing surfaces, grinding complete all as specified and as directed.
(b) Removing the unserviceable leg and S & F new leg in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and as directed.
(c) Removing the unserviceable shelf and S & F new shelf in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and as directed.
(d) Removing the unserviceable cleat for shelf in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and as directed.
(e) Removing the unserviceable hinge and S & F new hinge in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and as directed.
(f) Removing the unserviceable shutters left/right sheet and S & F new shutters left/right in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and as directed.
(g) Removing the unserviceable handle and S & F new handle in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and as directed.
(h) Removing the unserviceable locks and S & F new locks in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and as directed.
(j) Removing the unserviceable locking vertical rod complete assembly and S & F new locking vertical rod complete assembly in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and as directed.
(k) Preparing steel surfaces and applying two coats of synthetic enamel olive green shade over a coat of red oxide primer with spray machine in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and as directed.
(l) M & L for repairs of dents on steel surfaces of furniture complete all as specified and as directed.
(II) Almirah Medium Steel with four shelf : DRG NO FD-1032
(a) Removing the unserviceable leg and S & F new leg in the furniture (Almirah small/medium steel) as per drawing No FD-1032 complete all as specifed and as directed.
(b) Removing the unserviceable shelf and S & F new shelf in the furniture (Almirah small/medium steel) as per drawing No FD-1032 complete all as specifed and as directed.
(c) Removing the unserviceable cleat for shelf and S & F new shelf in the furniture (Almirah small/medium steel) as per drawing No FD-1032 complete all as specifed and as directed.
(d) Removing the unserviceable hinge and S & F new hinge in the furniture (Almirah small/medium steel) as per drawing No FD-1032 complete all as specifed and as directed.
(e) Removing the unserviceable shutters left/right sheet and S & F new shutters left/right sheet in the furniture (Almirah small/medium steel) as per drawing No FD-1032 complete all as specifed and as directed.
(f) Removing the unserviceable handle and S & F new handle in the furniture (Almirah small/medium steel) as per drawing No FD-1032 complete all as specifed and as directed.
(g) Removing the unserviceable locks and S & F new locks in the furniture (Almirah small/medium steel) as per drawing No FD-1032 complete all as specifed and as directed.
(h) Removing the unserviceable locking vertical rod complete assembly and S & F new locking vertical rod complete assembly in the furniture (Almirah small/medium steel) as per drawing No FD-1032 complete all as specifed and as directed.
(j) Preparing steel surfaces and applying two coats of synthetic enamel olive green shade over a coat of red oxide primer with spray machine in the furniture (Almirah small/medium steel) as per drawing No FD-1032 complete all as specifed and as directed.
(III) Locker Steel with four shelf : DRG NO FD-1029
(a) Removing the unserviceable leg and S & F new leg in the furniture (locker steel) as per drawing No FD-1029 complete all as specifed and as directed.
(b) Removing the unserviceable shelf and S & F new shelf in the furniture (locker steel) as per drawing No FD-1029 complete all as specifed and as directed.
(c) Removing the unserviceable cleat for shelf and S & F new cleat for shelf in the furniture (locker steel) as per drawing No FD-1029 complete all as specifed and as directed.
(d) Removing the unserviceable conduit pipe and S&F new conduit pipe in the furniture (locker steel) as per drawing No FD-1029 complete all as specifed and as directed.
(e) Removing the unserviceable handle and S & F new handle in the furniture (locker steel) as per drawing No FD-1029 complete all as specifed and as directed.
(f) Removing the unserviceable hasp & staple and S & F new hasp and staple in the furniture (locker steel) as per drawing No FD-1029 complete all as specifed and as directed.
(g) Preparing steel surfaces and applying two coats of synthetic enamel olive green shade over a coat of red oxide primer with spray machine in the furniture (locker steel) as per drawing No FD-1029 complete all as specifed and as directed.
(IV) Charpoy steel with hard top : DRG NO FD/MAP-II/01
(a) Removing the unserviceable stiffener and S & F new stiffener in the furniture (charpoy steel hard top) drawing No FD/MAP-II/01 complete all as specified and as directed.
(b) Removing the unserviceable long rail and S&F new long rail in the furniture (Charpoy steel hard top) as per drawing No FD/MAP-II/01 complete all as specified and as directed.
(c) Removing the unserviceable short rail and S&F new short rail in the furniture (Charpoy steel hard top) as per drawing No FD/MAP-II/01 complete all as specified and as directed.
(d) Removing the unserviceable leg and S&F new leg in the furniture (Charpoy steel hard top) as per drawing No FD/MAP-II/01 complete all as specified and as directed.
(e) Removing the unserviceable top ply wood and S&F new top ply wood 12mm thick in the furniture (Charpoy steel hard top) as per drawing No FD/MAP-II/01 complete all as specified and as directed.
(f) Preparing steel or wooden surfaces and applying French polich (glossy finish) to all exposed wooden surfaces and two coats of synthetic enamel paints over one coat of primer including scrapping old paint, sanding, applying putty to steel surfaces in the furniture (charpoy hard top) as per drawing No FD/MAP-II/01 complete all as specified and as directed.
(V) Charpoy GI pipe FD-220/similar pattern
(a) Removing the existing all unserviceable ply from frame of charpoy, Tightening/refixing the serviceable Loose parts of frames. Supply & fixing 1948mm Long x 868mm wide single piece fresh new plywood 12mm thick (Make: Greenply/Kitply/Orchid of BWR Grade) along with flush/countersunk bolt (06 Nos in Qty ) of dia 10mm, length 50mm and bolt top shall be flat and of dia 25mm. Each bolt must consist two cup washers & one nut. Hole on plywood for fixing bolt shall be made at a distance of two inch from centre of long rail, complete all as specified and directed.
(b) Removing the existing all unserviceable all MS cleats and supply and fixing MS cleats of size 60mmx30mmx5mm.
(c) Removing the existing unserviceable all MS angles, and supply & fixing MS angles of size 25mmx25mm having 5mm thickness and of length 868mm.
(d) Removing the existing unserviceable Niwar from frame of charpoy, Tightening/refixing the serviceable Loose parts of frames. Supply and fixing bright white colour vergin new fresh niwar of 50 mm to 55 mm width, and must be without joints. weight of niwar1.5 Kg per charpoy complete all as specified and directed.
(e) Removing the existing unserveceable long rail from charpoy GI pipe, tightening all loose parts and S&F long rail made of GI pipe 32mm dia medium Grade ISI marked duly threaded both ends and fixing to charpoy complete all as per Drg FD-220/Similar pattern complete all as specified and directed.
(f) Manufacturing of short rail made out of unserveceable long rail , duly threaded both ends and proper fixing in charpoy GI and tightening all loose parts after removing existing unserveceable short rail carefully without damaging/disturbing other parts all as per Drg FD-220/Similar pattern complete all as specified and directed.
(g) Manufacturing of legs made out of unserveceable short rail , duly threaded one end and proper fixing in charpoy GI and tightening all loose parts after removing existing unserveceable Leg rail carefully without damaging/disturbing other parts all as per Drg FD-220/Similar pattern.all as directed.
(h) Removing unserveceable elbow and S&F GI elbow 32 mm bore and tightening all loose parts as per Drg FD-220/Similar pattern all as directed.
(j) Removing unserveceable check nut and S&F GI check nut and tightening all loose parts as per Drg FD-220/Similar pattern all as directed.
(VI) Table 3'x2' steel FD-1008, 1007 similar patern, removing the existing unserviceable part and S&F following similar new part as per Drg
(a) Hard top sheet
(c) Rubber shoe
(d) Top/Bottom long stifner
(e) Top/Bottom short stifner
(f) Drawer for FD -1008 only
(g) Preparation/cleaning of existing decorated surface/rubbing by emery paper, removing all spots, filling all cavity with putty one coat of synthetic enamel paint for repaired and existing good furniture at furniture yard/MD/OTM buildings under GE (W) Colaba and all as directed.
(h) Material and labour for running welding (not exceeding 25mm each) of steel items including scraping preparing surface of welded portion by grinding all as directed.
(VII) Table 3'x3' steel FD-1009/ similar patern, removing the existing unserviceable part and S&F following similar new part as per Drg
(a) Hard top sheet
(b) Rubber shoe
(d) Stifner
(e) Preparation/cleaning of existing decorated surface/rubbing by emery paper, removing all spots, filling all cavity with putty one coat of synthetic enamel paint for repaired and existing good furniture at furniture yard/MD/OTM buildings under GE (W) Colaba and all as directed.
(f) Material and labour for running welding (not exceeding 25mm each) of steel items including scraping preparing surface of welded portion by grinding all as directed by BSO
(VIII) Table office clerk steel FD-1004/ similar patern, removing the existing unserviceable part and S&F following similar new part as per Drg
(a) Hard Top sheet
(b) Drawer
(c) Locks
(e) Top/Bottom long stifner
(f) Top/Bottom short stifner
(g) Rubber shoe
(h) Preparation/cleaning of existing decorated surface/rubbing by emery paper, removing all spots, filling all cavity with putty one coat of synthetic enamel paint for repaired and existing good furniture at furniture yard/MD/OTM buildings under GE (W) Colaba and all as directed.
(j) Material and labour for running welding (not exceeding 25mm each) of steel items including scraping preparing surface of welded portion by grinding all as directed.
(IX) Chair CB steel with arm FD-75/similar pattern, removing the existing unserviceable part and S&F following similar new part as per Drg
(a) Complete seat frame with canning
(b) Complete back frame with canning
(c) Arm rest
(d) Frame for arm rest
(f) Rubber shoe
(g) S&F MS plate of size 15mm width, 3mm thickness and full length to be welded at centre of seat as support parallel to front/rear rail all as directed.
(h) S&F MS plate of size 15mm width, 3mm thickness and full length to be welded at centre of back as support parallel to front/rear rail all as directed.
(j) Preparation/cleaning of existing decorated surface/rubbing by emery paper, removing all spots, filling all cavity with putty one coat of synthetic enamel paint for repaired and existing good furniture at furniture yard/MD/OTM buildings under GE (W) Colaba
(k) M&L for spot welding (not exceeding one inch) of steel items including scraping, preparing surface of welded portion, grinding complete all as directed.
BALAJISTEELINDUSTRIES
VISHWAS ENTERPRISES
Bidder Name
BALAJISTEELINDUSTRIES
SARGAM ENTERPRISES
VISHWAS ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .