| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | -20.05% | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹5.1 L (2.58%)Admitted-Finance ANAKA KRUSHNAPUR SASAN BALICHANDRAPUR DIST JAJPUR PIN 755049 | BALICHANDRAPUR | JAJPUR | ODISHA | 755049 | -17.99% | ₹2.0 Cr+₹5.1 L (2.58%) | L2 | Admitted-Finance |
| 3 | L3₹2.1 Cr+₹7.7 L (3.88%)Admitted-Finance BHUBANESWAR | JAJAPUR | ODISHA | 755007 | -16.95% | ₹2.1 Cr+₹7.7 L (3.88%) | L3 | Admitted-Finance |
| 4 | L4₹2.2 Cr+₹19.9 L (9.98%)Admitted-Finance AT JAMARA PO BAGHUNI PS NEMALO DIST CUTTACK PIN 754209 | CUTTACK | ODISHA | 754209 | -12.07% | ₹2.2 Cr+₹19.9 L (9.98%) | L4 | Admitted-Finance |
| 5 | L5₹2.5 Cr+₹50.1 L (25.1%)Admitted-Finance WARD NO 65 PO PS KHANDAGIRI DIST KHURDA PIN 751019 | KHANDAGIRI | KHURDA | ODISHA | 751019 | +0.00% | ₹2.5 Cr+₹50.1 L (25.1%) | L5 | Admitted-Finance |
Tender Value
₹2.5 Cr
EMD Value
₹2.5 L
Closing Date
29 May 2026, 5:30 pmClosed
CCE Cuttack RandB Circle
O/o CCE Cuttack RandB Circle
Building work
2026_EICCL_129456_1
CCE.Ctc.(RandB)3/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
330 days
Kendrapara
As per DTCN
3 documents required · 3 mandatory
₹10,000
₹2.5 L
Yes
19 Aug 2026
19 May 2026
30 May 2026
19 May 2026
29 May 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil works - Earth work in excavation in hard soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer in Charge. | 356.05 | Cum | 282.9 | ₹1,00,726.55 |
| 2 | Disposal of dismantled materials by mechanical means within 5km. Lead away from the site including cost of all labour , T&P complete as per the direction of the Engineer-in-charge. | 485.58 | Cum | 173.9 | ₹84,442.36 |
| 3 | Supplying, diluting and preparing chemical emulsion like Imidacloprid 30.5 % SC or other chemicals approved by Central Insecticides Board or as directed by the manufacturer and spraying the mixture uniformly by sprayer as Pre-Constructional Anti-termite Treatment confirming to IS 6313 (Part-II) and creating a chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of walls and floors along with external perimeter of the building, expansion joints, surrounding the pipes and conduits etc. at the rate of 7.5 liters per sqm on vertical surface and 5.0 liters per sqm on horizontal surfaces, 50% of the emulsion to be filled in the holes made in trenches at 150mm center to center (or as directed by the manufacturer) including the cost of all materials, cost of all labour, conveyance, loading, unloading, T&P, etc. all complete as per the direction of Engineer-in-Charge. | 405 | Sqm | 104.5 | ₹42,322.5 |
| 4 | Supplying and Filling with Sand in Foundation and Plinth in layers not exceeding 20 cm in depth, well watered and compact , top surface dressed and levelled to proper level and gradient including cost of all materials , conveyance, royalties, loading, unloading, cost of all labour, T&P, etc.All compelete as per the dirrection of Engineer-in-charge. | 308.42 | Cum | 654.2 | ₹2,01,768.36 |
| 5 | Providing and lying Plain Cement Concrete of proportion (1:3:6) in foundation & floor using 40 mm size black hard crusher broken granite stone metal, washed and screened sharp sand of approved quality from approved quarry including hoisting, lowering, laying the concrete, ramming, watering and curing etc. complete to required thickness including cost of all materials, conveyance, loading, unloading, royalties, cost of labours, T&P, hire & running charges of concrete mixer, etc. all complete as per the direction of the Engineer -in -charge. | 40.66 | Cum | 6,330.9 | ₹2,57,414.39 |
| 6 | Providing and lying Plain Cement Concrete of proportion (1:2:4) in foundation & floor using 12 mm size black hard crusher broken granite stone metal, washed and screened sharp sand of approved quality from approved quarry including hoisting, lowering, laying the concrete, ramming, watering and curing etc. complete to required thickness including cost of all materials, conveyance, loading, unloading, royalties, cost of labours, T&P, hire & running charges of concrete mixer, etc. all complete as per the direction of the Engineer -in -charge. | 43.09 | Cum | 7,986.3 | ₹3,44,129.67 |
| 7 | Single Under reamed Bored Cast in situ Compaction Pile 300mm dia up to 6.00mtr in foundation with R.C.C work M-25 grade with 20mm and down grade c.b.h.g chips including boring but excluding cost of M.S Rods with cutting bending & binding Charges of steel etc. | 104 | Each | 6,806.46 | ₹7,07,871.84 |
| 8 | Single Under reamed Bored Cast in situ Compaction Pile 300mm dia beyond 6.00mtr up to 1.00mtr in foundation with R.C.C work M-25 grade with 20mm and down grade c.b.h.g chips including boring but excluding cost of M.S Rods with cutting bending & binding Charges of steel etc. | 76 | Each | 896.32 | ₹68,120.32 |
| 9 | RCC WORK - Providing, lifting, hoisting and laying in position machine batched , machine mixed and machine vibrated design mix cement concrete of M-25 Including the cost of Centering and Shuttering (minimum cement content not less than 403 Kg/Cum) grade in reinforced cement concrete structural elements using black hard crusher broken granite chips of approved quality from approved quarry including mixing and compacting to proper shape and size, level and plumbs and finishing the exposed surfaces smooth including the cost of all materials, cost of labour, conveyance,loading, unloading, royalties, watering and curing for the required period, T&P , hire & running charges of concrete mixer and vibrator, cost of Admixtures in recommended proportions ( as per IS 9103 ) to accelerate, retard setting of concrete, improve workability without impairing strength and durability etc. complete as per the direction of the Engineer-in-charge but excluding the cost of steel reinforcement.
In Foundation (pile cap , column pedestal & column upto GL) | 74.22 | Cum | 7,200.8 | ₹5,34,443.38 |
| 10 | R.C.C. Plinth Beam | 20.83 | Cum | 8,075.2 | ₹1,68,206.42 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
DTCN.pdf
Tender Documents • 0.55 MB
BOQ_591754.xls
BOQ • 1.30 MB
Clarification_OM.pdf
Additional Documents • 2.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .