Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.7 L+₹873.73 (0.51%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.7 L+₹1,747.46 (1.01%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹1.7 L
EMD Value
₹3,492
Closing Date
5 Aug 2026, 6:00 pmClosed
xen rew udhampur
xen rew udhampur
nit
2026_RDPR_315907_18
e-NIT No. 43 REW UDHAMPUR of 2026-27 Dated 14-07-2026
Open Tender
Civil Works
Percentage
30 days
udhampur
boq
2 documents required · 2 mandatory
₹600
xen rew udhampur
₹3,492
14 Aug 2026
15 Jul 2026
6 Aug 2026
15 Jul 2026
5 Aug 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Provison for Citizen Information Board | 1 | no. | 3,000 | ₹3,000 |
| 2 | Earth work inBulk excavation by manual means in in A.K.S with disposal lead upto 1 mtr and lift uto 1.5 mtr. All kind soil
Mechanical means | 57.36 | Cum | 187.3 | ₹10,743.53 |
| 3 | Earth work in Bulk excavation by manual means in in A.K.S with disposal lead upto 1 mtr and lift uto 1.5 mtr All kind soil
Manuall means | 18.7 | Cum | 592.9 | ₹11,087.23 |
| 4 | P/L in position Cement concrete (1:5:10) 1 cement: 5 fine sand: 10 graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. | 0.26 | Cum | 4,826.5 | ₹1,254.89 |
| 5 | EXTRA FOR ADDITIONAL LIFT APART IN ALL KIND OF SOIL. | 55.16 | Cum | 89.75 | ₹4,950.61 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs excluding cost of centring, shuttering, finishing and reinforcement.1 cement: 2 coarse sand :4graded stone aggregates 20mm nominal size. | 1.03 | Cum | 7,104.35 | ₹7,317.48 |
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . | 61.6 | kg | 123.2 | ₹7,589.12 |
| 8 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with Cement mortar 1:6 (1 Cement : 6 coarse sand) | 16 | Cum | 5,402.9 | ₹86,446.4 |
| 9 | Extra for random rubble masonry with hard stone curved on plan for a mean radius not exceeding 6 m | 16 | cum | 978.4 | ₹15,654.4 |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 38.07 | Cum | 218.4 | ₹8,314.49 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_1027036.xls
BOQ • 0.30 MB
Extension.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .