| Sl No | Description | Qty | Unit | P S CONSTRUCTIONS L3 | GREEN HOURS L2 | BOSS BHASKARAN NURSERY L1 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing light jungle area of all kinds of shrubs, bulb weeds, grass, small plants, branches including cutting all unwanted plants, branches, twigs, wild growth, thorny leaves etc. complete, and disposing the same as place specified by Engineer, transporting at contractors own cost complete all as directed by the Engineer-in-Charge. Note: The unwanted cut bulb weeds, wild grass, unwanted vegetation are to be periodically collected and transported to dumping yard. During execution period any damages shall be rectified to the original at contractor cost. The measurement for payment shall be taken prior to cut the jungle and as directed by the Engineer-in-Charge. The rate shall include the cost of labour, transportation, loading, and unloading at dumpyard or place as directed by Engineer-in-Charge. | 10,000 | Sq.m. | 6.5 ₹65,000 | 9 ₹90,000 | 5 ₹50,000 |
| 2.00 | Filling with selected excavated earth available at site upto a lead of 200m, filling in layer of not more than 150mm thickness, each layer well rammed and consolidated by hand/earth rammer including excavation of dumped earth, hire charges of rammer, water consolidation, levelling to proper gradient, dressing the top surface to the required level, complying with specification and all as directed by the Engineer-in-Charge. | 25 | Cu.m. | 300 ₹7,500 | 350 ₹8,750 | 100 ₹2,500 |
| 3.00 | Collection, supplying and stacking good quality Red earth without stones, gravel etc., and stacking for premeasurement at places as shown by Engineer for taking pre measurements including spreading the same at places shown with a lead upto 100metres and filling in pits etc., complete all as per specification and as directed by the Engineer-in-Charge. | 100 | Cu.m. | 1,300 ₹1,30,000 | 2,275 ₹2,27,500 | 800 ₹80,000 |
| 4.00 | Collection, supplying and stacking of Decomposed dry farmyard manure without undesirable materials, stacking the same to at places as shown by Engineer for taking pre measurements including spreading the same at places shown with a lead upto 100metres and filling in pits etc., complete all as per specification and as directed by the Engineer-in-charge. | 100 | Cu.m. | 1,300 ₹1,30,000 | 2,100 ₹2,10,000 | 800 ₹80,000 |
| 5.00 | Maintenance of lawns, flower beds, hedges, trees etc., in garden area (Non- sprinklers area) by watering at regular intervals, cutting and trimming hedges, and the unwanted growth of grasses as and when required including running lawn mover, removing weeds, collecting the cut grass, fallen leaves of trees and disposing the same at dumping yards shown by the department, watering the trees inside the garden area complete all as per specifications and as directed by the Engineer-in-charge. Note: 1. The rate shall include the cost of hire charges of lorry and labour for transporting of cut grass, leaves etc., to the dumping yard. 2. The rate shall also include cost of all tools, plants, water delivery hose required for gardening etc. 3. The rate quoted shall be per Sq.m. area maintained per month. 4. Contractor has to make his own arrangement for Lawn Movers. If departmental lawn movers is available it will be provided by department on chargeable basis. 5. If lawn mover is not used, then recovery at the rate as mentioned in specification will be levied as penalty from RA Bill. 6. The contractor shall engage minimum 1 person for 1500 sq. m /day throughout the month as directed by Engineer-in-charge. Failure to employ the above minimum numbers of labour will attract penal clause as per additional special condition of contract attached with the tender for every default of labour. 7. Cutting plants should be handed over to nursery for sampling by the contractor as directed by the Engineer-in-charge. 8. The contractor shall supply the PPE to the garden labour and they should wear the PPE during their working hours. | 27,000 | Sq.m. | 14.8 ₹3,99,600 | 13 ₹3,51,000 | 14 ₹3,78,000 |
| 6.00 | Maintenance of lawns, flower beds, hedges, trees etc., in garden area by using Department sprinklers (Pop-up) for watering at regular intervals, cutting and trimming hedges, and the unwanted growth of grasses as and when required including running lawn mover, removing weeds, collecting the cut grass, fallen leaves of trees and disposing the same at dumping yards shown by the department, watering the trees inside the garden area complete all as per specifications and as directed by the Engineer-in-charge. Note: 1. The rate shall include the cost of hire charges of lorry and labour for transporting of cut grass, leaves etc., to the dumping yard. 2. The rate shall also include cost of all tools, plants, water delivery hose required for gardening etc. 3. The rate quoted shall be per Sq.m. area maintained per month. 4. Contractor has to make his own arrangement for Lawn Movers. If departmental lawn movers is available it will be provided by department on chargeable basis. 5. If lawn mover is not used, then recovery at the rate as mentioned in specification will be levied as penalty from RA Bill. 6. The contractor shall engage minimum 1 person for 2200 sq. m /day throughout the month as directed by Engineer-in-charge. Failure to employ the above minimum numbers of labour will attract penal clause as per additional special condition of contract attached with the tender for every default of labour. 7. Cutting plants should be handed over to nursery for sampling by the contractor as directed by the Engineer-in-charge. 8. The contractor shall supply the PPE to the garden labour and they should wear the PPE during their working hours. | 5,60,000 | Sq.m. | 12.8 ₹71,68,000 | 10.5 ₹58,80,000 | 12 ₹67,20,000 |
| 7.00 | Planting the plants / saplings in required site taken from nursery, including formation of pits, spreading & filling of red earth and farm yard manure to an average thickness of 50mm, conveyance from nursery, planting and initial watering all as per specification and as directed by the Engineer-in-Charge. Note: The rate shall excluding the cost of red earth and farm yard manure used for planting operation which will be paid under relevant item. | 5,000 | Nos. | 7 ₹35,000 | 20 ₹1,00,000 | 3 ₹15,000 |
| 8.00Supplying and planting of following plants/saplings of good quality & healthy appearance with blooming nature etc., including excavation, transportation, planting, refilling with suitable excavated soil mixed with red earth, manure or sludge as directed (cost of red earth, manure or sludge to be paid separately under relevant item) and initial watering all as per standard practice complete and as directed by the Engineer-in-Charge. The plants having 30cm to 60cm height (unless otherwise mentioned below), well developed, fresh and healthy nature. | ||||||
| 8.01 | Malli | 100 | Nos. | 60 ₹6,000 | 30 ₹3,000 | 45 ₹4,500 |
| 8.02 | Ixora Hybrid (All colours) | 1,000 | Nos. | 125 ₹1,25,000 | 30 ₹30,000 | 85 ₹85,000 |
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
15 Apr 2026, 11:30 amClosed
Chief Engineer, CEG
Room No. 222, CDO Building, Indira Gandhi Centre for Atomic Research, Kalpakkam - 603102.
Development and Maintenance of Lawn, hedges, flowers, beds at IGCAR North side for the year 2026- 2027.
2026_IGCAR_904337_1
CEG/IGC/2182/2026
Open Tender
Civil Works
365 days
Kalpakkam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹2.1 L
19 May 2026
2 Apr 2026
16 Apr 2026
2 Apr 2026
15 Apr 2026
3 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing light jungle area of all kinds of shrubs, bulb weeds, grass, small plants, branches including cutting all unwanted plants, branches, twigs, wild growth, thorny leaves etc. complete, and disposing the same as place specified by Engineer, transporting at contractors own cost complete all as directed by the Engineer-in-Charge. Note: The unwanted cut bulb weeds, wild grass, unwanted vegetation are to be periodically collected and transported to dumping yard. During execution period any damages shall be rectified to the original at contractor cost. The measurement for payment shall be taken prior to cut the jungle and as directed by the Engineer-in-Charge. The rate shall include the cost of labour, transportation, loading, and unloading at dumpyard or place as directed by Engineer-in-Charge. | 10,000 | Sq.m. | - | - |
| 2 | Filling with selected excavated earth available at site upto a lead of 200m, filling in layer of not more than 150mm thickness, each layer well rammed and consolidated by hand/earth rammer including excavation of dumped earth, hire charges of rammer, water consolidation, levelling to proper gradient, dressing the top surface to the required level, complying with specification and all as directed by the Engineer-in-Charge. | 25 | Cu.m. | - | - |
| 3 | Collection, supplying and stacking good quality Red earth without stones, gravel etc., and stacking for premeasurement at places as shown by Engineer for taking pre measurements including spreading the same at places shown with a lead upto 100metres and filling in pits etc., complete all as per specification and as directed by the Engineer-in-Charge. | 100 | Cu.m. | - | - |
| 4 | Collection, supplying and stacking of Decomposed dry farmyard manure without undesirable materials, stacking the same to at places as shown by Engineer for taking pre measurements including spreading the same at places shown with a lead upto 100metres and filling in pits etc., complete all as per specification and as directed by the Engineer-in-charge. | 100 | Cu.m. | - | - |
| 5 | Maintenance of lawns, flower beds, hedges, trees etc., in garden area (Non- sprinklers area) by watering at regular intervals, cutting and trimming hedges, and the unwanted growth of grasses as and when required including running lawn mover, removing weeds, collecting the cut grass, fallen leaves of trees and disposing the same at dumping yards shown by the department, watering the trees inside the garden area complete all as per specifications and as directed by the Engineer-in-charge. Note: 1. The rate shall include the cost of hire charges of lorry and labour for transporting of cut grass, leaves etc., to the dumping yard. 2. The rate shall also include cost of all tools, plants, water delivery hose required for gardening etc. 3. The rate quoted shall be per Sq.m. area maintained per month. 4. Contractor has to make his own arrangement for Lawn Movers. If departmental lawn movers is available it will be provided by department on chargeable basis. 5. If lawn mover is not used, then recovery at the rate as mentioned in specification will be levied as penalty from RA Bill. 6. The contractor shall engage minimum 1 person for 1500 sq. m /day throughout the month as directed by Engineer-in-charge. Failure to employ the above minimum numbers of labour will attract penal clause as per additional special condition of contract attached with the tender for every default of labour. 7. Cutting plants should be handed over to nursery for sampling by the contractor as directed by the Engineer-in-charge. 8. The contractor shall supply the PPE to the garden labour and they should wear the PPE during their working hours. | 27,000 | Sq.m. | - | - |
| 6 | Maintenance of lawns, flower beds, hedges, trees etc., in garden area by using Department sprinklers (Pop-up) for watering at regular intervals, cutting and trimming hedges, and the unwanted growth of grasses as and when required including running lawn mover, removing weeds, collecting the cut grass, fallen leaves of trees and disposing the same at dumping yards shown by the department, watering the trees inside the garden area complete all as per specifications and as directed by the Engineer-in-charge. Note: 1. The rate shall include the cost of hire charges of lorry and labour for transporting of cut grass, leaves etc., to the dumping yard. 2. The rate shall also include cost of all tools, plants, water delivery hose required for gardening etc. 3. The rate quoted shall be per Sq.m. area maintained per month. 4. Contractor has to make his own arrangement for Lawn Movers. If departmental lawn movers is available it will be provided by department on chargeable basis. 5. If lawn mover is not used, then recovery at the rate as mentioned in specification will be levied as penalty from RA Bill. 6. The contractor shall engage minimum 1 person for 2200 sq. m /day throughout the month as directed by Engineer-in-charge. Failure to employ the above minimum numbers of labour will attract penal clause as per additional special condition of contract attached with the tender for every default of labour. 7. Cutting plants should be handed over to nursery for sampling by the contractor as directed by the Engineer-in-charge. 8. The contractor shall supply the PPE to the garden labour and they should wear the PPE during their working hours. | 5,60,000 | Sq.m. | - | - |
| 7 | Planting the plants / saplings in required site taken from nursery, including formation of pits, spreading & filling of red earth and farm yard manure to an average thickness of 50mm, conveyance from nursery, planting and initial watering all as per specification and as directed by the Engineer-in-Charge. Note: The rate shall excluding the cost of red earth and farm yard manure used for planting operation which will be paid under relevant item. | 5,000 | Nos. | - | - |
| 8Supplying and planting of following plants/saplings of good quality & healthy appearance with blooming nature etc., including excavation, transportation, planting, refilling with suitable excavated soil mixed with red earth, manure or sludge as directed (cost of red earth, manure or sludge to be paid separately under relevant item) and initial watering all as per standard practice complete and as directed by the Engineer-in-Charge. The plants having 30cm to 60cm height (unless otherwise mentioned below), well developed, fresh and healthy nature. | |||||
| 8.01 | Malli | 100 | Nos. | - | - |
| 8.02 | Ixora Hybrid (All colours) | 1,000 | Nos. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
2182technicalbid.pdf
Tender Documents • 2.30 MB
2182Undertakingsandformoftender.pdf
Tender Documents • 0.22 MB
BOQ_950535.xls
BOQ • 0.32 MB
2182FormsACDFGHforfillinganduploading.xls
Tender Documents • 0.08 MB
Download all tender documents and submit your bid