| # | Company | Amount |
|---|---|---|
| 1 | ₹10.7 L |
Tender Value
₹15.5 L
EMD Value
₹31,000
Closing Date
15 Apr 2026, 3:00 pmClosed
ER. ARUNJAY KUMAR
EXECUTIVE ENGINEER
SONE CANAL DIVISION, BIKRAMGANJ
DINESH KUMAR SINGH YADAV
SE
BED DESILTATION AND STRUCTURE WORK OF NASRIGANJ DISTRIBUTORY FROM 0.00 TO 7.50 KM.
128868
04/2025-26/SCD BIKRAMGANJ/01
Open Tender
CIVIL
Patna
• Earnest Money. (As per mentioned/specified in the NIT, Bid Document, Technical Checklist Sheet)
• Time of Completion. (As per mentioned/specified in the NIT, Bid Document, Technical Checklist Sheet)
• Registration No. (As per mentioned/specified in the NIT, Bid Document, Technical Checklist Sheet)
• Character Certificate. (As per mentioned/specified in the NIT, Bid Document, Technical Checklist Sheet)
• GST Registration Certificate
• PAN
• Affidavit in required format (Should be after the publication date of the NIT)
• Income Tax Return (ITR)
CIVIL
PERCENTAGE
L1
1
9 documents required · 9 mandatory
₹5,000
Processing Fee: 590
₹31,000
REFER NIT FOR THE SAME.
25 Aug 2026
9 Apr 2026
16 Apr 2026
9 Apr 2026
15 Apr 2026
9 Apr 2026
10 Apr 2026
TECHNICAL BID (GROUP-01)
Name of Work BED DESILTATION AND STRUCTURE WORK OF NASRIGANJ DISTRIBUTORY FROM 0.00 TO 7.50 KM. Cost of Work as per BOQ Rs. 1550000.00 Time of Completion in month May 2026
Sl No. Items Requirement
Name of the contractor
Address of the contractor
1 Earnest Money As per NIT duly pledged in favour of Executive Engineer, Sone Canal Division, Bikramganj (Pay either online or offline) (Bank Guarantee only)
Bid Security Amount - Rs. 31000.00 Bid Security Amount - Rs.
2 Time of Completion
3 Registration No.
4 Character Certificate
5 GST Registration Certificate
7 Income Tax Return (ITR)
8 Affidavit in required format (Should be after the publication date of the NIT)
Executive Engineer Sone Canal Division, Bikramganj
TECHNICAL BID (GROUP-01)
Name of Work BED DESILTATION AND STRUCTURE WORK OF NASRIGANJ DISTRIBUTORY FROM 0.00 TO 7.50 KM. Cost of Work as per BOQ Rs. 1550000.00 Time of Completion in month May 2026
Sl No. Items Requirement
Name of the contractor
Address of the contractor
1 Earnest Money As per NIT duly pledged in favour of Executive Engineer, Sone Canal Division, Bikramganj (Pay either online or offline) (Bank Guarantee only)
Bid Security Amount - Rs. 31000.00 Bid Security Amount - Rs.
2 Time of Completion
3 Registration No.
4 Character Certificate
5 GST Registration Certificate
7 Income Tax Return (ITR)
8 Affidavit in required format (Should be after the publication date of the NIT)
Executive Engineer Sone Canal Division, Bikramganj
BILL OF QUANTITY (GROUP 01)
1 Estimated Cost (Rs.) :- 1550000.00
2 Earnest Money Deposit (Rs.) :- 31000
3 Tender Fee/Cost of BOQ :- 5000.00
4 Tender Processing Fee (TPF) :- 590.00
5 Time of Completion :- May 2026
NAME OF WORK : :- BED DESILTATION AND STRUCTURE WORK OF NASRIGANJ DISTRIBUTORY FROM 0.00 TO 7.50 KM.
S.No. Description of items Unit Total Quantity Rate (in Rs.) Amount (In Rs.)
1 Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15 Metre lead and disposal of unserviceable materials with all leads. as per building specifications and direction of E/I. (5.8.7) Per m3 43.38 741.10 32,148.92
2 Dismantling plain cement or lime concrete work including stacking serviceable materials in stacks within 15 Metre lead and disposal of unserviceable materials with all leads. as per building specifications and direction of E/I. (5.8.8) Per m3 15.48 1354.30 20,964.56
3 Earth work by excavtor and spreader or tractor-
leveller in lower level canal or flood
embankment or dhar ( Like, Minor, Sub -minor,
Jamindari bundh, Pynes etc where tipper is not
neaded ) all types of work like filling and making
of canal banks or embankment of earth free
from logs, roots or any other gradients, desilting
of canal bed and dhar in proper profile with
dressing and finishing including new construction, repair or restoration in odinary soil including cutting, loading, carriage from pit Per m3 6232.73 97.70 6,08,937.23
to banks or embankments, unloading, spreading,
clod-breaking and laying in layers properly with
lead below 15 metre and with.all lifts all
complete job as per specifications and direction
of E/I. ( mode of measurement-sectional
measurement of compacted earth ) (5.1.47)
4 Earth work in excavation of foundation trenches in ordinary soil (vide classification of soil item A ) and disposal of excavated earth so obtained to a distance up to 50 M and average lift of 1.5 M including leveling , ramming the foundation trenches, removing the roots of shrubs etc. all complete and as per specifications and direction of E/I. (5.1.27) Per M³ 257.52 197.90 50,963.21
5 Providing corase clean local sand in filling in foundation trenches including ramming, watering,royalty and all other taxes complete job as per specifications and direction of E/I. 5.1.37 Per M2 9.54 344.10 3,282.71
6 Providing brick flat soling with designation 100A bricks joints filled with coarse sand of approved quality including royaltyand all taxes, all complete as per approved design,specifications and direction of E/I 5.7.14 Per M2 60.06 277.40 16,660.64
7 Providing and laying P.C.C. or R.C.C M-150 with nominal mix of (1:2:4 ) in foundation of various components of canal or embankment structures with approved quality of qraded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (5.3.4) Per M³ 13.62 6498.10 88,504.12
8 Brick work in designation 100 A Brick with cement motar (1 : 4 ) in foundation with approved quality coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curring, scaffolding and its removal wherever required including royaliy and all taxes etc. complete job as per specification and direction of E / I. 5.4.2 Per M³ 22.98 5094.90 1,17,080.80
9 Brick work in designation 100 A Brick with cement motar (1 : 4 ) in superstructure with approved quality coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curring, scaffolding and its removal wherever required including royaliy and all taxes etc. complete job as per specification and direction of E / I. 5.4.6 Per M³ 18.42 5268.70 97,049.45
10 Supplying, Providing and Labour for laying, fiting and fixing NP2 300 mm dia pipe with collors in line level and grade as well providing approved jointing materials and joints properly filled to make them water proof all completeas per specification and direction of E / I. (5.6.1.3) R.m 60.00 995.07 59,704.20
11 Providing shuttering including strutting. Proping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I. (5.3.19) Per M2 31.14 586.00 18,248.04
12 Earth work in filling in foundation trenches and back filling of structure in layers not exceeding 150 mm thick well watered, rammed and fully compacted and finally dressed with suitable earth obtained from excavation of foundation trenches and placed in a suitable profile with in a lead of 30 M and lift of 1.5 M, all complete job as per specification and direction of E/I (5.1.31) Per M³ 77.28 151.10 11,677.01
13 Providing 12 mm thick cement plaster ( 1: 4 ) with approved quality sand of requisite F.M . Washed and screened including curing, scaffolding wherever required and its removal, royalty and all taxes etc. complete job as per specification and direction of E / I. (5.5.2) Per M2 186.90 217.00 40,557.30
14 Providing 1.5 mm thick cement punning including curing, , royalty and all taxes etc. complete job as per specification and direction of E / I. (5.5.10) Per M2 186.90 66.20 12,372.78
15 Carriage of materials
(iii) Stone Chips m³ 12.24 2032.80 24881.47
(iv) Local Sand Per M³ 10.44 250.70 2617.31
(vi) Hume Pipe 150 MM Dia R.m 60.00 75.40 4524.00
Sub-Total Rs. = 1267741.73
Add 1% Labour cess Rs. = 12677.42
Seigniorage fee 10% Rs. = 33142
Total Rs. = 1313561.15
Goods and Services Tax 18% Rs. = 236441.0072
Total Rs. = 1550002.16
Total Say Rs. = 1550000.00
S.No. Description of items Unit Total Quantity Rate (in Rs.) Amount (In Rs.)
(iii) Stone Chips m³ 12.24 2032.80 24,881.47
(iv) Local Sand Per M³ 10.44 250.70 2,617.31
(vi) Hume Pipe 150 MM Dia R.m 60.00 75.40 4,524.00
Sub-Total Rs. 12,67,741.73
Add 1% Labour cess Rs. 12,677.42
Seigniorage fee 10% Rs. 33,142.00
Total Rs. 13,13,561.15
Goods and Services Tax 18% Rs. 2,36,441.01
Total Rs. 15,50,002.15
Total Say Rs. 15,50,000.00
BILL OF QUANTITY (GROUP 01)
1 Estimated Cost (Rs.) :- 1550000.00
2 Earnest Money Deposit (Rs.) :- 31000
3 Tender Fee/Cost of BOQ :- 5000.00
4 Tender Processing Fee (TPF) :- 590.00
5 Time of Completion :- May 2026
NAME OF WORK : :- BED DESILTATION AND STRUCTURE WORK OF NASRIGANJ DISTRIBUTORY FROM 0.00 TO 7.50 KM.
S.No. Description of items Unit Total Quantity Rate (in Rs.) Amount (In Rs.)
1 Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15 Metre lead and disposal of unserviceable materials with all leads. as per building specifications and direction of E/I. (5.8.7) Per m3 43.38 741.10 32,148.92
2 Dismantling plain cement or lime concrete work including stacking serviceable materials in stacks within 15 Metre lead and disposal of unserviceable materials with all leads. as per building specifications and direction of E/I. (5.8.8) Per m3 15.48 1354.30 20,964.56
3 Earth work by excavtor and spreader or tractor-
leveller in lower level canal or flood
embankment or dhar ( Like, Minor, Sub -minor,
Jamindari bundh, Pynes etc where tipper is not
neaded ) all types of work like filling and making
of canal banks or embankment of earth free
from logs, roots or any other gradients, desilting
of canal bed and dhar in proper profile with
dressing and finishing including new construction, repair or restoration in odinary soil including cutting, loading, carriage from pit Per m3 6232.73 97.70 6,08,937.23
to banks or embankments, unloading, spreading,
clod-breaking and laying in layers properly with
lead below 15 metre and with.all lifts all
complete job as per specifications and direction
of E/I. ( mode of measurement-sectional
measurement of compacted earth ) (5.1.47)
4 Earth work in excavation of foundation trenches in ordinary soil (vide classification of soil item A ) and disposal of excavated earth so obtained to a distance up to 50 M and average lift of 1.5 M including leveling , ramming the foundation trenches, removing the roots of shrubs etc. all complete and as per specifications and direction of E/I. (5.1.27) Per M³ 257.52 197.90 50,963.21
5 Providing corase clean local sand in filling in foundation trenches including ramming, watering,royalty and all other taxes complete job as per specifications and direction of E/I. 5.1.37 Per M2 9.54 344.10 3,282.71
6 Providing brick flat soling with designation 100A bricks joints filled with coarse sand of approved quality including royaltyand all taxes, all complete as per approved design,specifications and direction of E/I 5.7.14 Per M2 60.06 277.40 16,660.64
7 Providing and laying P.C.C. or R.C.C M-150 with nominal mix of (1:2:4 ) in foundation of various components of canal or embankment structures with approved quality of qraded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (5.3.4) Per M³ 13.62 6498.10 88,504.12
8 Brick work in designation 100 A Brick with cement motar (1 : 4 ) in foundation with approved quality coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curring, scaffolding and its removal wherever required including royaliy and all taxes etc. complete job as per specification and direction of E / I. 5.4.2 Per M³ 22.98 5094.90 1,17,080.80
9 Brick work in designation 100 A Brick with cement motar (1 : 4 ) in superstructure with approved quality coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curring, scaffolding and its removal wherever required including royaliy and all taxes etc. complete job as per specification and direction of E / I. 5.4.6 Per M³ 18.42 5268.70 97,049.45
10 Supplying, Providing and Labour for laying, fiting and fixing NP2 300 mm dia pipe with collors in line level and grade as well providing approved jointing materials and joints properly filled to make them water proof all completeas per specification and direction of E / I. (5.6.1.3) R.m 60.00 995.07 59,704.20
11 Providing shuttering including strutting. Proping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I. (5.3.19) Per M2 31.14 586.00 18,248.04
12 Earth work in filling in foundation trenches and back filling of structure in layers not exceeding 150 mm thick well watered, rammed and fully compacted and finally dressed with suitable earth obtained from excavation of foundation trenches and placed in a suitable profile with in a lead of 30 M and lift of 1.5 M, all complete job as per specification and direction of E/I (5.1.31) Per M³ 77.28 151.10 11,677.01
13 Providing 12 mm thick cement plaster ( 1: 4 ) with approved quality sand of requisite F.M . Washed and screened including curing, scaffolding wherever required and its removal, royalty and all taxes etc. complete job as per specification and direction of E / I. (5.5.2) Per M2 186.90 217.00 40,557.30
14 Providing 1.5 mm thick cement punning including curing, , royalty and all taxes etc. complete job as per specification and direction of E / I. (5.5.10) Per M2 186.90 66.20 12,372.78
15 Carriage of materials
(iii) Stone Chips m³ 12.24 2032.80 24881.47
(iv) Local Sand Per M³ 10.44 250.70 2617.31
(vi) Hume Pipe 150 MM Dia R.m 60.00 75.40 4524.00
Sub-Total Rs. = 1267741.73
Add 1% Labour cess Rs. = 12677.42
Seigniorage fee 10% Rs. = 33142
Total Rs. = 1313561.15
Goods and Services Tax 18% Rs. = 236441.0072
Total Rs. = 1550002.16
Total Say Rs. = 1550000.00
S.No. Description of items Unit Total Quantity Rate (in Rs.) Amount (In Rs.)
(iii) Stone Chips m³ 12.24 2032.80 24,881.47
(iv) Local Sand Per M³ 10.44 250.70 2,617.31
(vi) Hume Pipe 150 MM Dia R.m 60.00 75.40 4,524.00
Sub-Total Rs. 12,67,741.73
Add 1% Labour cess Rs. 12,677.42
Seigniorage fee 10% Rs. 33,142.00
Total Rs. 13,13,561.15
Goods and Services Tax 18% Rs. 2,36,441.01
Total Rs. 15,50,002.15
Total Say Rs. 15,50,000.00
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT 4 2025-2026 SCD BIKRAMGANJ.doc
NIT • 0.08 MB
GR01 TECHNICAL CHECKLIST NASRIGANJ.xls
NIT • 0.02 MB
GR01 TENDER DOCUMENT NASRIGANJ.doc
NIT • 0.47 MB
NIT 4 2025-2026 SCD BIKRAMGANJ.doc
NIT • 0.08 MB
GR01 TECHNICAL CHECKLIST NASRIGANJ.xls
NIT • 0.02 MB
GR01 TENDER DOCUMENT NASRIGANJ.doc
NIT • 0.47 MB
GROUP 01 BOQ NASRIGANJ NASRIGANJ.xlsx
NIT • 0.02 MB
LETTER NO 891.pdf
NIT • 0.14 MB
Letter_00124_m.pdf
NIT • 0.25 MB
Letter_0915_pmc1.pdf
NIT • 0.17 MB
Order_0200.pdf
NIT • 0.38 MB
GROUP 01 BOQ NASRIGANJ NASRIGANJ.xlsx
NIT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .