Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹3,900
Closing Date
3 Nov 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE Pochampally
EE Pochampally Tirupatthur main road, Pochampally-635206
Popy/009,DT.20.10.22/S.pally
2022_EB_257686_1
Popy/009,DT.20.10.22/S.pally
Open Tender
Electrical Works
Works
180 days
Pochampally
Should be TNEB registered contractor
2 documents required · 2 mandatory
₹0
₹3,900
Yes
2 Dec 2022
20 Oct 2022
4 Nov 2022
20 Oct 2022
3 Nov 2022
20 Oct 2022
20 Oct 2022 - 3 Nov 2022
Amount
Excavation of Pole Pit for hard soil pole above 8.00 m length using JCB/Manual.
Excavation of Pole Pit for hard rock area pole above 8.00 m length using JCB/Manual.
Excavation of Stay Pit of 4.5' to 5 ' depth using JCB/Manual
Erection of RCC,REC,PSC Poles above 8.00 m length using JCB/Manual
Fixing of HT Pin Insulator with Pin/Polymer Pin Insulator
Fixing of V X arm 3.5 Feet/4.5 Feet/5 Feet
Fixing of HT/LT TI Fitting
Fixing of11 KV Strain Disc with Hardwares
Erection of Stay set complete
Fixing of two Tapping X arm per cut Point upto 33 KV line including fixing of Disc,Insulators and Jumpering etc
Paving and String of Conductors of 1 run above 7/2.59 mm ACSR or other equivalent Conductor upto 7/4.09 mm ACSR OR other equivalent Conductor
Mass Concreting of poles all size with material
Manufacturing and altering clamp
Drilling of holes in X Arm and clamps
Loading and unloading Charges of All REC,RCC Pole above 8.00 m length
Loading Un Loading Charges of Conductors from Stores to Site
Loading and unloading Charges of Line materials
Transporting of all types and sizes of poles and other associated materials from road side to pole pit and vice versa above 5KM
Transporting of DT Materials and line materials
Transporting of Conductors of all Size from road side to pit location upto one KM
Earthing of poles(coil earth)
GST. @18 % For labour
EPF. @13 % should be Entered by the Bidder
ESI. @3.25% should be Entered by the Bidder
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .