Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.2 LAccepted-AOC SONEPUR MUNICIPALITY | ₹3.2 L | 1 | Accepted-AOC Lottery Owner |
| 2 | 2₹3.2 LRejected-Finance | ₹3.2 L | 2 | Rejected-Finance Lottery Looser |
| 3 | 3₹3.2 LRejected-Finance SONEPUR MUNICIPALITY | PURI | ODISHA | 752001 | ₹3.2 L | 3 | Rejected-Finance Lottery Looser |
| 4 | 4₹3.2 LRejected-Finance | ₹3.2 L | 4 | Rejected-Finance Lottery Looser |
| 5 | 5₹3.2 LRejected-Finance AT GHODAGHATPADA PO DIST SUBARNAPUR PIN 767017 ODISHA | SUBARNAPUR | SUBARNAPUR | ODISHA | 767017 | ₹3.2 L | 5 | Rejected-Finance Lottery Looser |
Updated dates
Tender Value
₹3.2 L
EMD Value
₹3,244
Closing Date
5 Feb 2026, 5:00 pmClosed
Executive Officer
Sonepur Municipality
Completion of Community Center at Mahabir Colony Ward No-4
2026_ORULB_124735_2
SNP-MUN-34/2025-26
Open Tender
Civil Works - Others
90 days
Sonepur Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹3,244
Yes
26 Mar 2026
20 Jan 2026
6 Feb 2026
20 Jan 2026
5 Feb 2026
20 Jan 2026
20 Jan 2026 - 5 Feb 2026
Earth Excavation of foundation in hard soil within initial lead & lift including leveling the bed & depositing the soil away working area.
Filling in foundation and plinth with sand, watered and rammed including cost, conveyance & royalty of materials with labour and T&P required for the work.
Plain Cement Concrete of proportion (1:3:6) with 40mm & down graded size hand broken H.G. metal including cost, conveyance & royalty of materials with all labour charges.
R.C.C/C.C. work in ground floor of M-30 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete .
Brick work with Fly Ash bricks having crushing strength not less than 75kg/cm2 in cement mortar(1:4) in foundation and plinth. T & P etc all complete.
16 mm thick cement plaster in cement mortar (1:4) including cost, conveyance & royality of materials. .complete including cost of sheet & all fitting (per 1 SqMtr).
Iron work wrought and put up in trusses and purlines including fabrication and all cost of MS pipe 40mm dia (Labour only)
Painting two coats with weather seal coat over a coat of water bound wall primer.T & P etc all complete
Supplying ,fitting and fixing of precoated Galvanized iron Profile semi gloss of 1000mm width & total coated thickness 0.50mm in roof drilling hole in wind ties including fixing of ridges valleys ,wind ties etc .complete including cost of sheet & all fitting (per 1 SqMtr).
Supplying, fitting & fixing of vitrified floor Tile of size 600 x 600 mm of approved make laid on 20mm thick cement mortar (1:4) & finishing joints with white cement etc.
Cost of Display board & Photographs
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
finance_576346.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.78 MB
BOQ_576346.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid