Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 127 3 LOWER BAZAR SHIMLA HP | SHIMLA | SHIMLA | HIMACHAL PRADESH | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹35.6 L
EMD Value
₹60,850
Closing Date
2 Jun 2020, 11:00 amClosed
AGM WD SJPNL
AGM WD SJPNL US Club Shimla-01
Maintenance of lift Water Supply Scheme Ashwani Khad (Koti Brandi) (SH Improvement of rotor of 11 KV Induction motor 425 KW/550 HP Sr. No. 48021-A-402-A-01, 48021-A-402-11-05 and 45021-A-402-11-01 of Ashwani Khad , Kawalag second stage)
2020_MC_37449_1
Dated 23-05-2020
Open Tender
Repair and Maintenance Works
90 days
Shimla
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,500
AGM WD SJPNL
₹60,850
5 Oct 2020
23 May 2020
2 Jun 2020
23 May 2020
2 Jun 2020
23 May 2020
23 May 2020 - 2 Jun 2020
Amount
Complete set of rewinding of stator of squirrel cage BHEL make 11 KV motor 425 KW/550 HP/37A/2968 RPM 50 H/z 3 phase induction motor having sr. 48021A-402-A-01 & 48021-A-402-11-05 installed at 1st stage including cost of winding, insulation material, removing of old winding and rewinding with new winding material and allied jobs/ material all lead and lifts etc., complete in all respect and as per the direction of Engineer-in-Charge.
Complete set of rewinding of rotor of squirrel cage BHEL make 11 KV motor 425 KW/550 HP/37A/2968 RPM 50 H/z 3 phase induction motor having sr. 48021A-402-A-01 & 48021-A-402-11-01 installed at 1st stage including cost of winding, insulation material, removing of old winding and rewinding with new winding material and allied jobs/ material all lead and lifts etc., complete in all respect and as per the direction of Engineer-in-Charge.
P/F Bearing at Drive end No.NU 228 ECJ,C3 SKF make complete in all respect and as per the directions of Engineer-in-Charge.
P/F Bearing at Drive end No.6228-C3 SKF make complete in all respect and as per the directions of Engineer-in-Charge.
P/F Bearing at Non Drive end No. NU 224 SKF make complete in all respect and as per the directions of Engineer-in-Charge.
Installation of motor on bed and precision longitudinal as well as axial allignment of motor with pump shaft with suitable precision measuring devices like dial guages stainless steel shims etc.including manual and mechanized loading/unloading including all leads and lifts etc., complete in all respect and as per the direction of Enginner-in-Charge.
Reclamation of DE & NDE side bearing housing complete in all respect and in all leads & lifts as per directions by Engineer-in-Charge.
Tesing of motor on no load and full load conditions including cable connection and commissioning of motor at site including all leads and lifts, complete in all respect & as per the direction of Engineer-In-Charge.
Cleaning of rotor and dry with hot air including Varnishing and baking including all leads and lifts etc.,complete in all respect & as per the direction of Engineer-In-Charge.
Transportation charges of motor from site to workshop and back including all leads and lifts etc., complete in all respect & as per the direction of Engineer- In- Charge.
Thakur Traders
Vijay Kumar C/O Vasudeva Electricals
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid