Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
12 Jun 2026, 5:00 pm7d left
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Providing and Fixing of Demarcation board and RCC post in Pocket O, P and Q in Sector-20, YEA WC-06
2026_YEIDA_1155182_31
YEA/GM(PROJECT)/2026/512 DT-27/05/2026
Open Tender
Civil Works
279 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,411
₹2.5 L
2 Jun 2026
2 Jun 2026
15 Jun 2026
2 Jun 2026
12 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom.Lifts up to 1.50 m including getting out the excavated soil and disposal of surplus excavated soil as directed with in a lead of 50m. Depth from 0.00 to 1.50 m below UPPWD SOR | 481.62 | Cum | 72.8 | ₹35,061.94 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). UPPWD SOR 5.08/281 | 481.62 | Cum | 5,820 | ₹28,03,028.4 |
| 3 | Providing and laying in position machine batched
land machine mixed design mix M-25 grade lcement concrete for reintorced cement concrete
work, using cement content as per approved design mix, including pumping of concrete to site
of laying but excluding the cost of centering, |shuttering, finishing and reinforcement, admixtures in recommended proportions as per IS: 9103 to accelerate, retard |setting of concrete, improve workability without| impairing strength and durability as per direction of Engineer-in-cha rge. "(Note:- Cement content considered in this item is @ 330 kg/cum."Excess/ less cement used as per |design mix is payable/recoverable |including |separately). All works upto plinth level (DAR/5.33.1/Based on UPPWD SOR-2020) | 155.53 | Cum | 7,849.65 | ₹12,20,856.06 |
| 4 | Steel rainforcement for R.C.C. work including straightening, cutting bending, placing in position and binding all complete upto plinth level. Thermo-mechanically treated bars/Cold twisted bars. | 25,880.91 | kg | 77.08 | ₹19,94,900.54 |
| 5 | Finishing wall with water proof cement paint of
approved make and quality on new wood with
two coat to give an even shade including
supply of all materials, labour, Tools & plant
etc. required for proper completion of the work UPPWD SOR 660/ new item | 2,873.66 | sqm | 60 | ₹1,72,419.6 |
| 6 | Centering and shuttering including strutting propping etc. and removal of form for: Columns, pillars, piers, abutments, posts and struts. DSR-
|13/5.9.6/P-97 Sqm | 4,368.84 | sqm | 426.8 | ₹18,64,620.91 |
| 7 | Letter writing with black japan paintof approved brand…... UPPWD SOR 21.04/819 | 5,26,245 | sqm | 8 | ₹42,09,960 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
BOQ_2166122.xls
BOQ • 0.26 MB
31.pdf
Tender Documents • 1.83 MB
Download all tender documents and submit your bid