Tender Value
₹8.1 L
EMD Value
₹16,220
Closing Date
6 Mar 2021, 5:00 pmClosed
Executive Officer
Municipal Council Baddi
Construction of Boundary Wall and Gate, Grills in Herbal Park, Ward No 3, Swaraj Majra Labana, Baddi.
2021_UDDHP_44719_1
MCBADDI/Feb21/3
Open Tender
Civil Works
Item Rate
60 days
Baddi
As per NIT Attached
3 documents required · 3 mandatory
₹500
Executive Officer
₹16,220
5 Apr 2021
23 Feb 2021
8 Mar 2021
23 Feb 2021
6 Mar 2021
23 Feb 2021
Amount
Excavation in foundation trenches etc. in earth work lift upto 1.50 mts stacking the excavated soil not more than 3 mts clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into the plinths sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all excavated earth as directed within a lead of 20mts Pick Work
Providing and laying cement concrete 1:6:12 (1 cement:6 sand : 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centring and shuttering in: foundation and plinth
Brick work using 2nd class common burnt clay building bricks laid in cement sand mortar 1:5 in foundation and plinth.
Providing form work with steel plates 3.15mm thick welded with angle iron frames 30x30x5mm so as to give a fair finish including centering, shuttering, strutting and propping, etc. with wooden battens and ballies heights of propping and centering below supporting floor to ceiling in all heights and removal of the same for in-situ reinforced concrete and plain concrete work including carriage of material in all leads and lifts Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters buttresses,plinth and string courses and the like as per the direction of the Engineer in charge
Providing Tor steel /TMT Steel reinforcement for R.C.C. work including bending, binding and placing in position complete including cost of binding wire upto all heights including carriage of material in all leads and lifts.
P/L cement concrete 1:2:4 ( 1 cement : 2 sand: 4 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete with all leads and lifts as per the direction of the Engineer in Charge
Brick work using 1st class common burnt clay building bricks laid in cement sand mortar 1:5 in foundation and plinth complete with all leads and lifts as per the direction of the Engineer in Charge
Applying Birla JK white wall care putty over plaster surface after thoroughly brushing the surface free from mortar drops, dust, loose materials and other foreign matters sand papered smooth to give final matter finish to the surface complete including carriage of material in all leads & lifts. (i) In Wall /ceiling surface.
15mm Cement plaster in single coat on the fair side of brick/ concrete/stone walls for interior plastering upto floor two level including arrises, internal rounded angles, chamfers and/or rounded angles not exceeding 80mm in girth and finished even and smooth. Cement Mortar 1:4 (1Cement:4 Sand).
15mm Cement plaster in single coat on the rough side of brick/ concrete/stone walls for interior plastering upto floor two level including arrises, internal rounded angles, chamfers and/or rounded angles not exceeding 80mm in girth and finished even and smooth. Cement Mortar 1:4 (1Cement:4 Sand).
Finishing wall with weather proof exterior grade emulsion of approved design (Apexultima) or its equarlied on undecorated wall surfaces (two coats) to give an even shade and final finish after throughly cleaning the surface to remove all dirt, dust and other foreign matter etc including sand paper smooth complete including carriage of material in all leads & lifts. (i) In Wall
Steel work welded in built up sections, trusses and framed work, including cutting,hoisting, fixing in position and applying a priming coat of red lead paint including carriage of material in all leads and lifts: -In gratings framed guard bars, ladders, railling, brackets and similar works i/c making holes & filling the same with cement concrete 1:2:4 (1 cement:2 sand 4 graded stone aggregate 20mm nominal size).
Painting two coats (excluding priming coat) on new steel and other metal surfaces with enamel paint, brushing to give an even shade including cleaning the surface of all dirt, dust and other foreign matter including carriage of material in all leads & lifts. (a)Enamel paint other than white or white paint.
Kalyan Singh Govt Contractor
Harpal Singh (Govt. Contractor)
NARESH KUMAR
SATNAM CONSTRUCTION AND FABRICATION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .