Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAccepted-Finance | ₹18.9 L | L1 | Accepted-Finance Less Estimate Rate |
| 2 | L2₹20.1 LAccepted-Finance | ₹20.1 L | L2 | Accepted-Finance Above Estimate Rate |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Documents not recived |
| Sl No | Description | Qty | Unit | B SUGUNA L1 | M/S. SRI RAJALAKSHMI RNTERPRISES L2 |
|---|---|---|---|---|---|
| 1.001. Construction of 30000 lit OHT at Kaliyanur Kandigai in Puliyur Panchayat in Tiruvallur Block | |||||
| 2.00Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by officers | |||||
| 3.00A.First depth of 2m From 0 to 2 m below GL | |||||
| 4.00 | In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S.20B | 58.55 | Cum | 263.7 ₹15,439.64 | 450 ₹26,347.50 |
| 5.00 | B.Second depth of 1m | 13.12 | Cum | 263.7 ₹3,459.74 | 450 ₹5,904 |
| 6.00 | Sand filling for foundation with clear river sand including cost of sand, watering ,ramming and consolidation etc complete as directed by officers | 2.92 | Cum | 2,230 ₹6,511.60 | 2,230 ₹6,511.60 |
| 7.00 | Plain Cement Concrete 1:4:8 (one cement, four sand and eight hard granite broken stone of 40mm size ISS gauge) for foundation and footing including mixing, placing, ramming ,finishing curing etc. complete in accordance with standard specification and as directed by the officers. | 4.37 | Cum | 6,011 ₹26,268.07 | 6,011 ₹26,268.07 |
| 8.00Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | |||||
| 9.00 | Below 1.5m from GL | 13.52 | Cum | 9,733 ₹1.3 L | 9,733 ₹1.3 L |
| 10.00 | 0m to 1.50m below GL | 1.75 | Cum | 9,733 ₹17,032.75 | 9,733 ₹17,032.75 |
Tender Value
₹19.7 L
EMD Value
₹20,000
Closing Date
5 Feb 2026, 3:00 pmClosed
Block Development Officer BP
Tiruvallur Panchayat Union Office at Ikkadu
Construction of 30000 lit Kaliyanur Kandigai in Puliyur Panchayat
2026_RDTN_650105_1
3873/2025/A2/Puliyur OHT
Open Tender
Civil Works
Tiruvallur Panchayat Union Office at Ikkadu
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹20,000
Yes
Tiruvallur Panchayat Union Office at Ikkadu
6 Feb 2026
3 Feb 2026
5 Feb 2026
3 Feb 2026
5 Feb 2026
3 Feb 2026
3 Feb 2026
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_779453.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid