Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1 LAccepted-AOC | ₹1 L Quoted ₹55,868.20 | L1 | Accepted-AOC ok |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
6 Mar 2024, 3:00 pmClosed
Executive Officer
6/A, Abdul Kuthus Street
Construction of Culvert at Ward 4, Muniswaran Koil Street in Polur Town Panchayat
2024_DTP_432836_1
300/2024/HC
Open Tender
Civil Works
90 days
Polur
II Class
2 documents required · 2 mandatory
₹0
₹2,000
Yes
29 May 2024
1 Mar 2024
7 Mar 2024
1 Mar 2024
6 Mar 2024
1 Mar 2024
Amount
Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS20B
Plain Cement Concrete 1:4:8 Mix (one part cement, four part sand and eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with std. specifications.
Steel Centering for the Soffits of PCC/RCC works for the following items including cost of all materials, labour strutting, removing etc., as directed by Departmental Officers.
With out Strutting
With Strutting
Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete.
Supplying fabricating and placing in position of RTS Rods for reinforcement at all RCC works including cost of steel, binding wire, labour charges etc. complete as directed by Departmental Officers
Reinforced Cement Concrete 1:1.5:3 mix using 20mm size hard granite broken stone (machine crushed) excluding cost of reinforcement, fabrication and placing th egrills in position and excluding the cost of centering, shuttering and strutting but including cost of cement mixing concrete using mechanical mixer, vibrating with mechanical vibrator, finishing, curing etc. complete as directed by Departmental Officers.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_514392.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid