| 1 | L1₹2.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.9 L+₹1,620.02 (0.56%)Rejected-AOC 1897 TS NO 6 5 VELLIANGKATTU RAMASAMY GOWNDER LAY OUT 60 FEET ROAD TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | L2 | Rejected-AOC L2 | |
| 3 | L3₹3.4 L+₹50,870.39 (17.6%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹3.5 L+₹62,052.65 (21.5%)Rejected-AOC | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | V ELANGOVAN L4 | PMS CONSTRUCTION L1 | PORKODI M L3 | Senthilkumar L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation and deposting on bank with intial lead and lift in stiff clay black cotton soils and ordinary gravely soil etc complete | 71.1 | Cum | 275 ₹19,552.5 | 168 ₹11,944.8 | 263 ₹18,699.3 | 150 ₹10,665 Lowest |
| 2.00 | Foundation concrete in C.C.1:4:8 mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and all labours etc., complete | 7.21 | Cum | 5,750 ₹41,457.5 | 4,780 ₹34,463.8 Lowest | 5,628 ₹40,577.88 | 5,000 ₹36,050 |
| 3.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc., complete. a) Centering For Below GL | 118.59 | Sqm | 555 ₹65,817.45 | 440 ₹52,179.6 | 547 ₹64,868.73 | 400 ₹47,436 Lowest |
| 4.00 | b) Centering For Above GL | 19.98 | Sqm | 1,125 ₹22,477.5 | 910 ₹18,181.8 Lowest | 1,095 ₹21,878.1 | 1,095 ₹21,878.1 |
| 5.00 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges etc., complete. | 140 | Kg | 95 ₹13,300 | 90 ₹12,600 | 91 ₹12,740 | 75 ₹10,500 Lowest |
| 6.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete. | 2.08 | Cum | 9,450 ₹19,656 | 7,000 ₹14,560 Lowest | 9,382 ₹19,514.56 | 8,000 ₹16,640 |
| 7.00 | Plain Cement Concrete 1:3:6 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 12.95 | Cum | 6,750 ₹87,412.5 | 5,600 ₹72,520 Lowest | 6,386 ₹82,698.7 | 6,000 ₹77,700 |
| 8.00 | Plastering with Cement Mortar 1:4 Mix to 20mm thick thick including cost and coveyance to site and all labour charges etc complete | 6.3 | Sqm | 600 ₹3,780 | 500 ₹3,150 Lowest | 591 ₹3,723.3 | 500 ₹3,150 Lowest |
| 9.00 | Towards cost and supply of Following Materials including cost and coveyance to site and all labour charges etc complete a) 110mm PVC Pipe | 18 | Rm | 315 ₹5,670 | 250 ₹4,500 Lowest | 304 ₹5,472 | 304 ₹5,472 |
| 10.00 | b) Weld Mesh (1.50m x 0.75m) | 2 | Nos | 775 ₹1,550 | 4,800 ₹9,600 | 750 ₹1,500 | 500 ₹1,000 Lowest |
Tender Value
₹3.4 L
EMD Value
₹3,425
Closing Date
18 Sept 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (VP) ALATHUR
BLOCK DEVELOPMENT OFFICE ALATHUR
Construction Of Horizontal Type Community Soak Pit Near Government Higher Secondary School Survey no 12 BY 7 at Kolathur Panchayat of Alathur Block of Perambalur District Under SBM 2026 27 Package No TN 11 01
2026_RDTN_700908_1
Rc.No.2235/2026/B6 Date 28.08.2026
Open Tender
Civil Works
Item Rate
180 days
BLOCK DEVELOPMENT OFFICE ALATHUR
AS PER TENDER DOCUMENTS
4 documents required · 4 mandatory
₹0
₹3,425
9 Oct 2026
3 Sept 2026
18 Sept 2026
3 Sept 2026
18 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation and deposting on bank with intial lead and lift in stiff clay black cotton soils and ordinary gravely soil etc complete | 71.1 | Cum | - | - |
| 2 | Foundation concrete in C.C.1:4:8 mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and all labours etc., complete | 7.21 | Cum | - | - |
| 3 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc., complete. a) Centering For Below GL | 118.59 | Sqm | - | - |
| 4 | b) Centering For Above GL | 19.98 | Sqm | - | - |
| 5 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges etc., complete. | 140 | Kg | - | - |
| 6 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete. | 2.08 | Cum | - | - |
| 7 | Plain Cement Concrete 1:3:6 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 12.95 | Cum | - | - |
| 8 | Plastering with Cement Mortar 1:4 Mix to 20mm thick thick including cost and coveyance to site and all labour charges etc complete | 6.3 | Sqm | - | - |
| 9 | Towards cost and supply of Following Materials including cost and coveyance to site and all labour charges etc complete a) 110mm PVC Pipe | 18 | Rm | - | - |
| 10 | b) Weld Mesh (1.50m x 0.75m) | 2 | Nos | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.87 MB
PART2.pdf
Tender Documents • 0.66 MB
EMD.pdf
Additional Documents • 0.14 MB
PART1.pdf
Tender Documents • 0.82 MB
BOQ_842474.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .