Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹6.3 L
Closing Date
16 Oct 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
Provision of high mast at stations area over PRYJ division.(Phase-I).
ELG-55-2627~NCR
ELG-55-2627
Open
Works - General
12 Months
Prayagraj, Uttar Pradesh
₹0
₹6.3 L
25 Sept 2026
25 Sept 2026
2 Oct 2026
30 items across 1 schedule · ₹3,13,70,182.31 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Supply, erection, testing, connecting &commissioning of 20 meter high mast systemcomplete with all accessories 16 nos. luminaries of200W LED each Light, including making offoundation as per recommendation of manufacturesalong with required materials for making offoundation and with feeder pillar including allaccessories. 20 M high mast with its accessoriesMast shaft shall be hot dip galvanized (Singledip)comprising of polygonal pole and welded baseplate hot dip galvanized head frame with clamps,nuts & bolts for fixing sixteen luminaries and CGbox etc.(01 Job) A rising & lowering mechanismwith winch Lenten carriage head frame, SS wire,Rope cable &power tools with 1.5 HP motor. (1Job). Supply,erection, testing, connecting andcommissioning of16 nos. luminaries of 200W LEDincluding allaccessories. (01Job). Supply of M30foundation bolts of size-850mm manufactured fromspecial steel C/W nuts, washers anchor plates &template for above mast including earthingarrangement with electrode of 40 mm dia "B" classGI pipe of 3.0 mtrslong as per Drg. No. SrDEE/G/ALD 10/94. (01 Job).Construction ofsuitable shallow foundation with M20 gradeconcrete for 20M high mast considering the SBC as10/T sqmtr at 2 mtr depth with all materials &labour (01 Job). Supply of twin domeaviationobservation light with 2 Nos LED array lamp. (01set) Supply & installation of separate control panelin front of feeder pillar housingsuitable controlcircuit with timer & AVR for theoperation of themast. It shall also consist of suitable control for the power tool motors with suitable foundation.Inspection by- RITES. | Numbers | 65.00 | 3,70,819.8 | 2,41,03,287 | |
| 2 | Termination of LT XLPE cables of various sizes (One Job means all 4 cores of cables).Inspection by-Consignee. | Job | 260.00 | 111.69 | 29,039.4 |
| 3 | Supply and laying of B class, 50 mm dia, GI pipe of for cable riser/road crossing as required and as per relevant technical specification. Inspection by-Consignee. | Metre | 400.00 | 115.9 | 46,360 |
| 4 | Collecting, Transporting from SSE/PS/ store to site, laying, testing, and commissioning of above LT cable . Laying direct in ground (Including excavation, sand cushioning, protection brick covering and refilling the trench etc.), direct in RCC/Metal pipes in rod/track crossings and on surface/required in wall/in concrete floor by cutting recessed and finished originally as required as per relevant technical specifications. | Metre | 2000.00 | 61.03 | 1,22,060 |
| 5 | Supply, erection, testing and commissioning of single earth electrode of 50 mm. dia 4000mm long GI pipe class B complete with earth box with CI cover hinged to CI frame including connection from earth electrode to MDB/SDB/poles/with 8 swg GI wire/strip as per attached drawing. Inspection by-RITES. | Numbers | 200.00 | 2,563.18 | 5,12,636 |
| 6 | Horizontal boring of cable duct through machine at more than 2.1 mtr depth from the bottom of pit and without DWC/GI/HDPE pipes. The work shall be done as per extent practice and instruction of site engineer. | Metre | 2000.00 | 1,002.37 | 20,04,740 |
| 7 | Supply and laying of HDPE Pipes (Upto PN 8.0 Pressure Rating Material Grade: PE 63, Pressure Rating: PN 8.0, Nominal Dia(mm): 110) as per IS-4984:2016 suitable for HT/LT XLPE cable & as required and as per relevant technical specification. Inspection by- Consignee. | Metre | 2000.00 | 230.37 | 4,60,740 |
| 8 | Supply of Full HD ResolutionPTZ [Pan, Tilt, Zoom] IPColour Camera with varifocallenses along with housing andmount with all accessories asper RDSO Specification NoRDSO/ SPN/ TC/ 65/ 2021Version 6.0 or latest. Inspection By- RITES/RDSO or as applicable. | Numbers | 34.00 | 47,735.13 | 16,22,994.42 |
| 9 | Installation, Testing & Commissioning of Full HD Resolution PTZ (Pan, Tilt, Zoom) IP Colour Camera along with, Mount . All the accessories and fixing materials including mount required for this installation are to be supplied by contractor within the same cost. | Numbers | 34.00 | 709.14 | 24,110.76 |
| 10 | Supply, Installation, Testing & Commissioning of PCWorkstation hardware as perclause no. 11.0 of RDSO SpecRDSO/ SPN/ TC/ 65/ 2021Revision 6.0 or latest forViewing, Monitoring andSystem Management withdigital keyboard and loadedwith Graphic User InterfaceClient Software Features perclause no, 18.2.0 of RDSOSpecification No RDSO/ SPN/TC/ 65/ 2021 Version 6.0 orlatest. Software licensesconditions as per RDSO specClause 20.0 of RDSOSpecification No RDSO/ SPN/TC/ 65/ 2021 Version 6.0 orlatest. Inspection By- consignee. | Numbers | 1.00 | 1,56,034.9 | 1,56,034.9 |
| 11 | Supply of Full HD resolutionLarge Format display LEDmonitor screen size minimum55 inch as per RDSOSpecification No RDSO/ SPN/TC/ 65/ 2021 Version 6.0 orlatest Inspection By- consignee. | Numbers | 1.00 | 71,367.25 | 71,367.25 |
| 12 | Installation, testing andcommissioning of large formatdisplay monitor unit 55 withall accessories and fixingmaterials required for thisinstallation are to be suppliedby contractor within the samecost. Inspection By-Consignee. | Numbers | 1.00 | 1,134.26 | 1,134.26 |
| 13 | Supply, Installation, Testing & Commissioning of Video Management Software with License as per RDSOSpecification No. RDSO/ SPN/TC/ 65/ 2021 Version 6.0 orlatest amendment [Percamera licence means VideoManagement [Viewing] at multiple locations .Inspection By- consignee. | Numbers | 34.00 | 1,182.41 | 40,201.94 |
| 14 | Supply, Installation, Testing & Commissioning of VideoRecording Software with License as per RDSOSpecification No. RDSO/ SPN/TC/ 65/ 2021 Version 6.0 orlatest amendment [Percamera Licence means VideoRecording at multiple locations Inspection By- consignee. | Numbers | 34.00 | 708.64 | 24,093.76 |
| 15 | Supply, Installation, Testing & Commissioning of rack mountable Layer 2 PoE Switch (24 x 10/100/1000 BASE-T PoE ports • 4 x 1G (minimum) SFP+ ports with minimum PoE Power Budget of 370W or better) and all accessories required for their installation. These switches should be adhering to as per RDSO spec. NO. RDSO/ SPN/TC/65/2021 Version 6.0 or latest. Inspection By- RITES/RDSO or as applicable. | Numbers | 16.00 | 42,803.56 | 6,84,856.96 |
| 16 | Supply, installation, testing &commissioning of Layer-2managed Switch [8 Port10/100 BASE-T and 2 SFP 1Guplink ports] as per RDSOSpecification No RDSO/ SPN/TC/ 65/ 2021 Version 6.0 orlatest. Inspection By- RITES/RDSO or as applicable. | Numbers | 50.00 | 12,634.31 | 6,31,715.5 |
| 17 | Supply of SFP-s withspecification as follows- DataRate - 1 GBPS, TX/RXwavelength - 1310/ 1550 nm,Supports Upto 20 Kmdistance, Media Type - SingleMode fiber [SMF],Compatibility - Multi-vendorMSA Compatible. InspectionBy- Consignee | Numbers | 50.00 | 1,207.17 | 60,358.5 |
| 18 | Installation, testing andcommissioning single modesingle fibre 1G SFP moduleInspection By- Consignee | Numbers | 50.00 | 56.63 | 2,831.5 |
| 19 | Supply of STP CAT-6 cableand all the accessoriesrequired for installation(should be compliant withlatest EIA/TIA-568-B.2-1standard for CAT 6 cable).Inspection By- Consignee. | Metre | 1000.00 | 37.2 | 37,200 |
| 20 | Laying of UTP/STP CAT-6cable/power cable in PVCcasing capping of appropriatesize. The work also includessupply and fixing of casingand capping, fixing andconnection of patch panel,fixing of CAT-6 cable with RJ45 connectors. Work to bedone as per instructions ofsite incharge. Inspection By-Consignee. | Metre | 1000.00 | 35.92 | 35,920 |
| 21 | Supply of 12 fiber OFC -Armoured. Inspection By-Consignee. | Metre | 1000.00 | 20.85 | 20,850 |
| 22 | Laying of Data cable/Communication cable/ Powercable etc. in PVC conduit pipeetc. [As per site requirement].Inspection By- Consignee. | Metre | 1000.00 | 17.46 | 17,460 |
| 23 | Supply of 6U Outdoor cabinate enclosure IP66 complied pole mount similar to Rackom 6UIP66 or similar (Inspection by Consignee). | Numbers | 20.00 | 12,437.2 | 2,48,744 |
| 24 | Supply, installation and Fixingof 19 inch 9 U Racks withFront Glass Door, 06 SocketPower DB, 02 Fan-Fan Tray,Cable Manager , HardwarePacket , Earthing etc. withrequired accessories formounting the equipment.Inspection By- Consignee. | Numbers | 20.00 | 4,879.19 | 97,583.8 |
| 25 | Supply and Fixing of PVCconduit pipe of 25 mm diaconforming to IS: 9537 withsuitable couplers and bends.The PVC pipe should be fixedover the wall/Platformshelter/ceiling etc, as per theinstructions of the railwayrepresentative at site.Inspection By- Consignee. | Metre | 1000.00 | 41.92 | 41,920 |
| 26 | Supply, fixing, termination,indoor wiring, testing andcommissioning of PVC FlexiblePipe dia 1 inch Inspection By-Consignee. | Metre | 500.00 | 21.43 | 10,715 |
| 27 | "Supply and fixing of 12 port FDMS/ LIU with connectors as per site requirement.[Pigtails and other miscelleneous materials required for the work shall be supplied by the contractor]. Make- R&M, Rackom, D-Link or similar.Inspection by- Consignee" | Numbers | 20.00 | 4,279.52 | 85,590.4 |
| 28 | Fiber splicing/termination and testing of spliced joint of all fibers of 12 F OFC. Inspection by- Consignee | Numbers | 20.00 | 2,025.35 | 40,507 |
| 29 | Supply of permanentlylubricated HDPE duct, 40 mmouter dia, as per RDSO spec.No. RDSO/ SPN/ TC/ 45/ 2013Rev.2 Amndt.2 or latest, alongwith all accessories like endcaps, collars, bends, couplersetc. Inspection By- Consignee. | Kilometre | 2.00 | 61,125.3 | 1,22,250.6 |
| 30 | Laying of HDPE duct as perthe approved cable route planin the exavatedtrenches/other protectedworks/RCC channel etc.including all accessories likeend caps, collars, bends,couplers etc. The ends of theduct to be sealed with endplugs till OFC blowing is done.Important: The laying of OFCcable independently or alongwith Quad cable/PIJF cable inthe same trench shall be governed by the RDSOdrawings no.RDSO/TCDO/COP-6 [a] andRDSO/TCDO/COP-8 [a]respectively, issued videChapter-XIII of the TelecommManual. Inspection By- Consignee. | Kilometre | 2.00 | 6,439.68 | 12,879.36 |
| Schedule total | ₹3,13,70,182.31 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_April-2022_2022__27_04_227.pdf
ATTACHMENT
2022_12_13RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril2022ACSNo_2.pdf
ATTACHMENT
GCC CORRECTION
ATTACHMENT
GCC CORRECTION
ATTACHMENT
GCC CORRECTION
ATTACHMENT
GCC CORRECTION
ATTACHMENT
2024_05_14ClarificationregardingsubmissionofAnnexure-VofGCC.pdf
ATTACHMENT
Annexure-VA.pdf
ATTACHMENT
AnnxVIB.pdf
ATTACHMENT
GCCACS2022CORRECTION1.pdf
ATTACHMENT
Likelysourceofsupply.pdf
ATTACHMENT
TechnicalrecommendationsforHighmast.pdf
ATTACHMENT
DETAILOFTECHNICALSPECIFICATIONFOR20MHIGHMAST.pdf
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_111.pdf GCC Correction
ATTACHMENT
TNDoc2.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_3ACS-3113.pdf
ATTACHMENT
2023_08_07RBCE_CE-I-CTIndianRailwayStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_4ACS-4.pdf
ATTACHMENT
2023_10_20RBCE_CE-I-CTIndianRailwayStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_5ACS-5.pdf
ATTACHMENT
2023_12_21IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_6ACS-6.pdf
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_111.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .