Loading…
Loading…
Tender Value
₹53.0 L
EMD Value
₹1.1 L
Closing Date
5 Oct 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
HQ OFFICE
15 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less ; where V= Advertised value of the tender in crores of Rupees & N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.(Please refer para 10.2 of tender document)
The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.(Please refer para 10.1 of tender document)
**Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender.
Defination of Similar Work :- Any work of bridge on running lines involving Metallizing or Painting.
8 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
For Schedule of Work, Scope of Work, Special Conditions, Methodology etc. please refer tender document.
All the bidders/tenderers must ensure that they are GST compliant and their quoted tax structures / rates are GST Law.
Improvement of structural life Composite ROBs and TGBs by Metallising and Conventional painting over various sections (DW-PNVL ,MNKD-PNVL, KYN-LNL) of Mumbai division. (8 Bridges)
CR-BR272026-27~CR
CR-BR272026-27
Open
Works - General
6 Months
Mumbai, Maharashtra
₹0
₹1.1 L
11 Sept 2026
11 Sept 2026
21 Sept 2026
12 items across 1 schedule · ₹17,38,295.2 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| preparation of steel work of bridge girders by cleaning with and/or wire brushes to remove and loose or perished paint to perfectly clean & dry bare metal free from all dirt/foreign material for initial coat of paint for new or steel girders. Rate includes cost of consumables, brushes, tools & ladders, scaffoldings, jhoola, scaffolding staging etc. | — | — | — | — | |
| 1 | girders with old paints | Sqm | 2100.00 | 53.07 | 1,11,447 |
| 2 | preparation for painting of bridge girders and other steel where the finishing coat shows deterioration; but primer coat of sufficiently in good condition and no signs of rusting etc. Surface cleaned free from oil grease, and other foreign matters without the primer coat {Rate includes labour, consumables, tools & scaffolding, jhoola, ladder etc.} | Sqm | 9800.00 | 26.02 | 2,54,996 |
| of cleaned plate/composite bridge including all scaffolding along with of Jhoola / hanging scaffolding etc. where required. | — | — | — | — | |
| 3 | coat ready mix Zinc Chromate to IS:104 with DFT of 25-30 followed by one coat of Zinc red oxide conforming to IS:2074 Microns | Sqm | 2100.00 | 83.53 | 1,75,413 |
| 4 | coats of Aluminium paint in dual conforming to IS:2339 with DFT Microns for each coat. | Sqm | 11900.00 | 87.26 | 10,38,394 |
| preparation of steel work of bridge girders by cleaning with and/or wire brushes to remove and loose or perished paint to perfectly clean & dry bare metal free from all dirt/foreign material for initial coat of paint for new or steel girders. Rate includes cost of consumables, brushes, tools & ladders, scaffoldings, jhoola, scaffolding staging etc. | — | — | — | — | |
| 5 | working under traffic conditions 041220 to 041274 [RATE = | Sqm | 2100.00 | 5.31 | 11,151 |
| 6 | working under traffic conditions 041220 to 041274 [RATE = | Sqm | 9797.00 | 2.6 | 25,472.2 |
| of cleaned plate/composite bridge including all scaffolding along with of Jhoola / hanging scaffolding etc. where required. | — | — | — | — | |
| 7 | working under traffic conditions 041220 to 041274 [RATE = | Sqm | 2100.00 | 8.35 | 17,535 |
| 8 | working under traffic conditions 041220 to 041274 [RATE = | Sqm | 11900.00 | 8.73 | 1,03,887 |
| Schedule total | ₹17,38,295.2 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
27TDpdf.pdf
ATTACHMENT
Checklistabove50Lakh1.pdf
ATTACHMENT
Proformafordeclarationpreviousyearbalancesheetyettobeprepared.pdf Proforma
ATTACHMENT
Proformafordeclarationpreviousyearbalancesheetyettobeprepared.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .