| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC Tender Awarded |
| 2 | L2₹1.7 CrRejected-Finance | ₹1.7 Cr | L2 | Rejected-Finance Financial Bid rejected being higher rate |
Tender Value
₹1.8 Cr
EMD Value
₹10.8 L
Closing Date
28 Jan 2026, 12:00 pmClosed
SE Unnao Circle PWD Unnao
SE Unnao Circle PWD Unnao
Construction of Buxer -Maa Chandrika Devi Temple- Bypass with Five Year Maintenance
2026_CEUCZ_1107567_1
140MT/1MT/E-Tender/2025 dt. 09-01-2026
Open Tender
Civil Works
365 days
Unnao
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹10.8 L
Yes
SE Unnao Circle PWD Unnao
28 Feb 2026
19 Jan 2026
28 Jan 2026
19 Jan 2026
28 Jan 2026
20 Jan 2026
20 Jan 2026
Construction of Embankment and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No. 300-2 (Carted up to 2km) (Including labour Cess & Excluding GST)
Laying and spreading available soil in the sub-grade on a prepared surface, pulverising, mixing the spread soil in place with Soil Stabilizer with 2 per cent slaked lime using Binder spreader Machine, having minimum content of 70 per cent of CaO, grading with motor grader and compacting with the road roller at OMC to the desired density to form a layer of improved sub grade As per Clause 402(i) 4.2 B (Including labour Cess & Excluding GST)
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401(B) (Close Graded Grade-1) (Including labour Cess & Excluding GST)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including labour Cess & Excluding GST)
Primer coat with SS-2 Grade Bitumen Emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (Including labour Cess & Excluding GST)
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder(VG-40) @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (DBM Grade-1) (Including labour Cess & Excluding GST)
Providing and applying tack coat with bitumen VG_10 using Bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including labour Cess & Excluding GST)
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-40) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (BC Grade-2) (Including labour Cess & Excluding GST)
Laying reinforced cement concrement 350mm Dia Hume Pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation, protection works, back filling, concrete and masonary works in head walls and parapets. (Including labour Cess & Excluding GST)
Maintenance of Constructed Road for next Five Year after the actual date of completion,Total maintenace Cost 2.50% of BOQ shall be paid in the form of installment as below,The payment shall be the inclusive of cess but Excluding GST,Payment shall be done as per satisfaction of Engineer-in-Charge regarding maintenance work carried out by Contractor. (i) From Completion of 1 Year to 2nd Year 0.25% of Bill Amount.
(ii) 2nd Year to 3rd Year 0.50% of Bill Amount.
(iii) 3rd Year to 4th Year 0.75% of Bill Amount.
iv) 4th Year to 5th Year 1.00% of Bill Amount.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.09 MB
Tendernotice_2.pdf
PDF • 1.03 MB
BOQ_2044110.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid