| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.3 LAdmitted-Fee/PreQual/Technical/Finance | -1.00% | ₹8.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.4 L+₹7,561.23 (0.91%)Admitted-Fee/PreQual/Technical/Finance | -0.10% | ₹8.4 L+₹7,561.23 (0.91%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹8.5 L+₹16,802.74 (2.02%)Admitted-Fee/PreQual/Technical/Finance | +1.00% | ₹8.5 L+₹16,802.74 (2.02%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.4 L
EMD Value
₹16,802
Closing Date
25 May 2026, 11:00 amClosed
EXECUTIVE OFFICER NAGAR PALIKA PARISHAD RUDAULI
EXECUTIVE OFFICER NAGAR PALIKA PARISHAD RUDAULI
DR APJ ABDUL KALAM NAGAR WARD ME OMNATH GUPTA KE MAKAN SE SALMAN KE MAKAN TAK CC SADAK AND NALI VA COVERED KA NIRMAN KARYA.
2026_DOLBU_1141189_66
23/NPP/RUDAULI/2026-27
Open Tender
Civil Works
Percentage
AYODHYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹999
EXECUTIVE OFFICER NAGAR PALIKA PARISHAD RUDAULI
₹16,802
5 Aug 2026
30 Apr 2026
26 May 2026
30 Apr 2026
25 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old Interlocking tiles all complete. | 300 | sqm | 8 | ₹2,400 |
| 2 | E/W Excavation in foundation in ordinary soil including filling lift upto 1.5 mtr and lead upto 30m including filling watering and ramming of excavated earth into the trenches etc all compt. As per SI no. 251 | 49.5 | cum | 125 | ₹6,187.5 |
| 3 | P/L PCC 1:6:12 in cement, Fine Sand and 40mm brick ballast including supply of materials labour and T&P etc required for proper completion of the wrork and curring compt. All complete as per SI no. 273 | 11.1 | cum | 3,950 | ₹43,845 |
| 4 | First class 150 brick work in 1:4 cement:C.sand mortar all compt. As per SI no. 305(b) | 25.53 | cum | 5,390 | ₹1,37,606.7 |
| 5 | 12mm plaster work in 1:3 cement&C.sand mortar all complete. | 84 | sqm | 190 | ₹15,960 |
| 6 | P/L PCC 1:2:4 in cement, C. Sand and 20mm stone grit of nominal sizes including supply of materials labour and T&P etc required for proper completion of the wrork and curring compt. All complete. | 6.48 | cum | 7,850 | ₹50,868 |
| 7 | Construction of Granular sub base by provinding well grades material, spreading inuniform layers with morter grader on prepared surface, mixing by mix in place method with rotavator at OMC.. All compt. As per Clause 401. | 30 | cum | 3,650 | ₹1,09,500 |
| 8 | Construction of un-reinforced dowel joints at expansion and construction joint only, plan cement concrete pavement thickness as per design over…. All compt. As per TS 1501 | 36 | cum | 9,070 | ₹3,26,520 |
| 9 | Additional for non-metalic CC surface Hardner I/C all compt. | 300 | sqm | 96.25 | ₹28,875 |
| 10 | RCC 1:1.5:3 in cement, C. Sand and 20mm stone grit in RCC Slab. All complete as per SI no. 284 B | 8 | cum | 8,650 | ₹69,200 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.50 MB
BOQ_2134379.xls
BOQ • 0.26 MB
NIT56-68.pdf
Additional Documents • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .