| 1 | ₹31.2 Laccepted-finance | accepted-finance |
Tender Value
Refer Docs
EMD Value
₹59,800
Closing Date
18 Nov 2025, 9:30 pmClosed
Public Works Department
Laxman AEE
Shifting of Pole , HT/LT and DTCs Due to widening of road from Tegur bridge to Murarji School 0.00 km to 3.5 Km in Mugthihally at Chikkamagalur.
PWD/2025-26/EL/WORK_INDENT27743
PWD/2025-26/EL/WORK_INDENT27743
Open
Electrical
Two Tender Document System(Two Cover)
PWD Electrical Division Office Bengaluru
7 documents required · 7 mandatory
3.2To qualify for award of this contract, each tenderer in its name should have in the last Five years i.e. 2020-21 to 2024-25.b) Satisfactorily completed (at least 50% of the contract value), as prime contractor, at least one similar work i.e., Shifting of HT / LT Lines Works of value not less than Rs 14.93 Lakhs in a single work.
3.2To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2020-21 to 2024-25 c) executed in any one financial year, the following minimum quantities of work: 1. RCC/PCC Poles-114 Nos 2. Guy Set-48Nos 3.Rabbit Conductor-5.04Km (List of quantities to be uploaded by the Tenderer).
The tenderer as a Prime Contractor having valid Class-1 & above Electrical License issued by Electrical Inspectorate Govt. of Karnataka and should have suitable technical, financial & managerial capabilities.
3.6Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under/ Assessed available tender capacity - (AxNx2.5-B) Where, A-Maximum value of construction works executed in any one year during the last five years (updated 2025-26 price level) taking into account the completed as well as works in progress. N Number of years prescribed for completion of the works for which tenders are invited. 0.50 Years (06 Months) B - Value, at 2025-26 price level, of existing commitments and on-going works to be completed during the next. 0.50 Years (06 Months) (period of completion of the works for which Tenders are invited) Note: The statements showing the value of existing commitments and on-going works as well as the stipulated period of completion remaining for each of the works listed should be countersigned by the Employer in charge, not below the rank of an Executive Engineer or equivalent.
The Tenderer must submit ongoing and existing commitments details separately.
The Tenderer must have submitted the Certification of registration in the Labour department with the latest renewal.
3.2To qualify for award of this contract, each Tenderer in its name should have during last five years i.e., from 2020-21 to 2024-25.a) The tenders must have achieved in at least two financial years an average annual financial turnover of an amount Not less than Rs.29.86 Lakhs during last five years. With UDIN Number certified by Chartered Accountant, If Failed to Satisfy the condition tender will be rejected Note: The returns submitted to the I.T. along with the Profit and Loss account statement, Balance sheet should be uploaded for the financial turnover criteria.
3.3Each Tenderer should further demonstrate: (b) liquid assets and /or availability of credit facilities of not less than Rs.8.96 Lakhs (For Particular work only) (Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc. (usually the equivalent of the estimated cash flow for three months in the peak construction period)
The Bidders shall deposit E.M.D of Rs. 59,800/- through any e-payment mode.
Nil
Nil
Nil
₹750
₹59,800
18 Nov 2025
3 Nov 2025
19 Nov 2025
7 Nov 2025
Shifting of Pole , HT/LT and DTCs Due to widening of road from Tegur bridge to Murarji School 0.00 km to 3.5 Km in Mugthihally at Chikkamagalur
Supply & Erection of Pre-Stressed Tubular Spun Pole - 11 Mtr Long, 500 Kg WL (Dwg No. BESCOM/GM/QS&S/45 Dtd 24.11.2018) as per IS-13158: 1991 including Digging of Pit 2.5 Mtr depth for erection of 11 ...
Supply & Erection of RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. BESCOM GM QS&S 02 Dtd 24.11.2018) as per IS 785including Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC su...
Supply & Erection of PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No.BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards including Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC...
Supply & Erection of PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards including Digging of Pit 1.6 Mtr depth for erection of 7.5/8 Mtr Long Steel/RCC/P...
Double Pole Structure complete including 5 Kg, 8 SWG GI Wire for Structure Grounding 9M RCC Pole ---- Items of work are including cost and convey ance of all materials, labour charges for all items of...
Supply & Providing Guy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07 ---- Items of work are including cost and convey ance of all materials, labour...
Supply & Providing Spiral Earth Electrode type earthing (without charcoal, salt etc.,) ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with...
Supply of 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole ---- Items of work are including cost and convey ance of all materials, labour charge...
Supply of 11 kV, 45 kN Polymeric Insulator ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloading an...
11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - For PSCC Pole 140 KG WL ---- Items of work are including cost and convey ance of all materials, labour charges ...
Supply & Providing of 11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work wit...
Supply & stringing of Rabbit ACSR
(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM and Stringing of Conductor for Rabbit ACSR ---- Items of work are including cost and convey ance of all materials, la...
LT 2 Pin Cross Arm with clamps, bolts, nuts & washers with braces For RCC Pole ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lea...
ReleasinReleasing and Refixing of RCC Pole - 9 Mtr Long, 145 Kg WL ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, ...
Releasing and Restringing of ACSR Rabbit conductor ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unlo...
Releasing of PSCC Pole - 9 Mtr Long, 200 Kg WL ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloadin...
Releasing of V-Shape/Horizontal cross arm for DC Line including Brace and Insulator fixing. (Without Single Top Support) ---- Items of work are including cost and convey ance of all materials, labour ...
LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace -For RCC Pole ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lea...
LT Single Top Support with bolts, nuts & washers (MS) ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and u...
LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS For PSCC Pole 140 KG WL ---- Items of work are including cost and convey ance of all materials, labour charges for all items of wo...
LT 2 Pin Cross Arm with clamps, bolts, nuts & washers with braces - MS For PSCC Pole 140 KG WL ---- Items of work are including cost and convey ance of all materials, labour charges for all items of w...
Supply of 1.1 kV Ceramic Pin Insulator (Shell only) (Material) ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, load...
Supply of 1.1 kV GI Pin for 1.1 kV Ceramic Shell Insulator ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading ...
Supplying and providing No.8 strain insulator (BR.27.00+ASL3%) ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, load...
Releasing and Refixing of Weasel ACSR Conductor ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloadi...
Releasing and Refixing of RCC Pole - 8 Mtr Long, 115 Kg WL ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading ...
Releasing and Refixing of 4 Pin cross arm with Insulator and Braces fixing ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead an...
Releasing and Refixing of 2 Pin cross arm with Insulator and Braces fixing (BR. 144.00+ASL 3%) ---- Items of work are including cost and convey ance of all materials, labour charges for all items of w...
Double Pole Transformer Structure complete with cross arms, braces, clamps, bolts & nuts and
washers including 2 No of Poles For 25/63/100 kVA 4/5 Star Rated Transformer on RCC Pole - 9 M Long, 145 Kg...
GI Grounding pipe, B - Class, 42 mm dia, 2.5 M long, 3.2 mm thick with bolts nuts, GI Strips and wash ers complete Minimum Weight of GI Pipe: 7.3 Kgs (Material ) ---- Items of work are including cost ...
7/10 SWG Guy Wire (7/3.251 mm Dia), Std Wt: 680 Kg/KM ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and u...
8 SWG GI Wire (4.064 mm Dia), Std Wt: 131 Kg/KM ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloadi...
11 kV, Horizontal Cross Arm with clamps, HTST
supports, bolts, nuts and washers for RCC Pole - 9 Mtr Long, 145 Kg WL ---- Items of work are including cost and convey ance of all materials, labour char...
HT Single Top Support with bolts, nuts & washers (MS) ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and u...
Alkathene Tube 19 mm Dia and in coils of 30 Mtr ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloadi...
Caution/Danger Board ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloading and HOM of machineries e...
Anti Climbing Device (12 Mtr GI Barbed Wire) ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloading ...
11 kV Lightning Arrester, Metal oxide,
10 kV, 5 kA Polymeric Type with ground
disconnector ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work ...
Providing & Fixing the 11 kV, 200 Amps, Single Break GOS ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading an...
GOS as per IS-9921, IS-1977 H - Frame Set for fixing 11 kV, 200 Amps Single Break
GOS - (For DP structure for providing New GOS for sectionalisation) - MS and Erection of H-Frame ---- Items of work ar...
HG Fuse Unit as per IS-5350 Part-2 11 kV, HG Fuse Unit with Solid Core Insulator (Dwg No. BESCOM/GM/QS&S/21 Dtd 24.11.2018) and Fixing DOLO Cutout/Horn Gap Fuse including fixing of cross arm and wirin...
b) LT Wiring (From DTC to LT Line Through
Metering Box & LT Protection Kit) SINGLE
i) Al Lead Wire - 50 Sqmm
ii) Heavy Duty Long Barrel Copper Lug - 50
iii) PG Clamp - Rabbit to 50 Sqmm...
Providing the LT Protection Kit (Dwg No. BESCOM/GM/QS&S/10 Dtd 24.11.2018) Fixing of LT Protection Kit (Material+ Labour ) ---- Items of work are including cost and convey ance of all materials, labou...
Releasing of H-Frame for mounting GOS ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloading and HOM...
Releasing of 11 kV, 200 Amps, Single Break GOS ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloadin...
Releasing of LT Protection Kit ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloading and HOM of mac...
Releasing of DOLO Cutout/Horn Gap Fuse including fixing of cross arm and wiring ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all le...
Fixing Metering Box for housing the ETV Meter 3 Phase 4 Wire along with CT's, Meter & wiring
for DTC 100 kVA TC ---- Items of work are including cost and convey ance of all materials, labour charges f...
Releasing and Refixing of 100 kVA Transformer ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloading...
Releasing and Refixing of GOS including wiring (11 kV Single Break 200 Amps) ) ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lea...
Releasing and Refixing of DOLO Cutout/Horn Gap Fuse including fixing of cross arm and wiring ---- Items of work are including cost and convey ance of all materials, labour charges for all items of wor...
Releasing and Refixing of Earthing materials pipe type for grounding (Single Electrode with accessories) ---- Items of work are including cost and convey ance of all materials, labour charges for all ...
Releasing and Refixing of V-Shape/Horizontal cross arm including Single Top Support Brace and Insulator fixing ---- Items of work are including cost and convey ance of all materials, labour charges fo...
Supplying and Fixing of Caution/Danger Board ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloading ...
Releasing and Refixing of Guy set with 2 Nos. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07 ---- Items of work are including cost and convey ance of all materia...
Releasing and Refixing of Double Pole Structure complete including 5 Kg, 8 SWG GI Wire for Structure Grounding 9M RCC Pole ---- Items of work are including cost and convey ance of all materials, labou...
Double Pole Structure complete including 5 Kg, 8 SWG GI Wire for Structure Grounding 8M RCC Pole ---- Items of work are including cost and convey ance of all materials, labour charges for all items of...
Releasing and Refixing of LT Protection Kit ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloading a...
Releasing and Refixing of Wiring of 2 Circuits of LT Wiring for for 25/63/100 kVA DTC to the existing LT protection Kit/Distribution Box via metering box. (includes fixing of necessary supports like 2...
LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - GI For PSCC Pole 140 KG WL ---- Items of work are including cost and convey ance of all materials, labour charges for all items of wo...
11 kV GI Pin for 11 kV Ceramic Shell Insulator ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all lead and lift, loading and unloadin...
Releasing & Refixing of 4 Pin cross arm with Insulator and Braces (1.9% of 304 ) ---- Items of work are including cost and convey ance of all materials, labour charges for all items of work with all l...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KPPP kw-2 bid 27743.doc
Tender Document • 1.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .