Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.4 LAccepted-AOC CHANDIGARH | ₹6.4 L | 1 | Accepted-AOC DUE TO L-1 AGENCY |
| 2 | 2₹6.5 L+₹7,409.63 (1.16%)Rejected-Finance 7 VILLAGE GOPALON DISTT FATEHGARH SAHIB | ₹6.5 L+₹7,409.63 (1.16%) | 2 | Rejected-Finance rate on higher side. |
Tender Value
₹6.7 L
EMD Value
₹13,460
Closing Date
19 Jun 2026, 11:00 amClosed
XEN CP3 SEC 16 CHD
XEN CP3 SEC 16 CHD
ADDITIONAL ROOM AT GROUND FLOOR WITH ATTACHED TOILET IN HOUSE NO. 207, TYPE-8, SECTOR 18, CHANDIGARH.
2026_CHD_93279_1
CP3/2026/2879077
Open Tender
Civil Works
Percentage
SECTOR 18 CHANDIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹13,460
24 Jul 2026
12 Jun 2026
19 Jun 2026
12 Jun 2026
19 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 3.35 | cum | 2,004.57 | ₹6,715.31 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 12.9 | cum | 253.27 | ₹3,267.18 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 6.29 | cum | 6,342.6 | ₹39,894.95 |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | 7.05 | cum | 7,171.64 | ₹50,560.06 |
| 5 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources) | 6.61 | Sqm | 399.76 | ₹2,642.41 |
| 6 | Extra for providing and mixing water proofing material in cement concrete of work in doses by weight of cement as per manufacturer's specification. | 1.72 | Kg | 17.16 | ₹29.52 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) | 13.06 | cum | 9,092.05 | ₹1,18,769.45 |
| 8 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level Cement mortar 1:4 (1 cement :4 coarse sand) | 12.54 | Sqm | 1,093.46 | ₹13,711.99 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | 23 | Sqm | 902.21 | ₹20,750.83 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 543 | Kg | 104.94 | ₹56,982.42 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_114187.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .