| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.9 L+₹7,329.34 (4.08%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.9 L+₹13,245.80 (7.38%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹2.1 L+₹29,435.10 (16.4%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹2.1 L+₹32,967.31 (18.4%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
18 Nov 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,WRD
O/o, The Executive Engineer, WRD., Periyar Main Canal Division, Melur.
Special Repairs to 5A Sluice channel and 6th sluice of 9th Distributary in Thaniyamangalam village in Melur Taluk in Madurai District.
2026_WRD_719326_1
05 2026-2027 JDO2 F.105 DATED.28.10.2026
Open Tender
Civil Works
Percentage
90 days
Thaniyamangalam
4 documents required · 4 mandatory
₹0
₹3,000
18 Nov 2026
30 Oct 2026
18 Nov 2026
30 Oct 2026
18 Nov 2026
30 Oct 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling, clearing away and carefully stacking material and without disturbing nearby structure useful for reuse for any thickness of brick or stone masonry in cement Mortar walls under 3 (Three) meters high etc, complete as directed by the Engineer in charge of works and as per the technical specifications. | 2.43 | Cubic Meter | 302.96 | ₹736.19 |
| 2 | Earthwork excavation for foundation Earth work Excavaction for foundation in hard stiff clay,stiff black cotton soil, Hard red earth, shales, murrams, gravel, stoney earth and earth mixed small size blouders and hard grvelly soil depositing on bank including shoring strutting and bailing out water wherever necessary, well rammed consolidated and deposting the surplus earth in places as shown by the depar tmental offices with an initial lead of 10metres and initial left of 2 metres and clearing, levelling the site etc., complying with standard specification and as directed by the departmental officers. | 0.5 | Cubic Meter | 147.02 | ₹73.51 |
| 3 | Suppling and filling with M.sand for filling in layers of not more than 15cm thick well rammed with water complying with standard specification and as directed by the departmental officers. | 15.81 | Cubic Meter | 1,985.14 | ₹31,385.06 |
| 4 | P.C.C. - M15 - 20mm Providing and placing Plain Cement oncrete M 15 grade using crusher broken hard coarse aggregate (well graded) of nominal maximum size of 20mm and downgraded to I.S specified grading (To achieve the specified characteristic strength of 15N/mm2 in 28 days) and mixing the ingredients in approved mixer including dewatering of the placement site by baling / pumping and diverting wherever necessary, placing concrete in layers and vibrating, water curing, finishing the surface with all leads and lifts etc., complete as directed by the Engineer in charge of works and as per the technical specifications. | 11.35 | Cubic Meter | 6,619.4 | ₹75,130.19 |
| 5Random Rubble masonry in Cement mortar 1:4 ( One cement and four M.sand by volume mixed mechanically in approved mixer) using Hard granite stones and bond stones from approved sources including simultaneous pointing of the exposed surface with same mortar and all incidental charges such as bailing out water, watering, curing, finishing etc, complete as directed by the Engineer in charge of works and as per the technical specifications | |||||
| 5.01 | Old stone | 0.97 | Cubic Meter | 5,280.5 | ₹5,122.09 |
| 5.02 | New stone | 7.56 | Cubic Meter | 6,013.15 | ₹45,459.41 |
| 6 | Plastering with cement mortar 1:4 (One cement and four M.sand ) 20 mm thick - 10m2 including curing, finishing etc., complete complying with the standard specification | 10.74 | Square Meter | 583.05 | ₹6,261.96 |
| 7 | Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0-100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods sectioning, including watering and consolidation by power roller rolling with lead of 2KMCT including watering and consolidation by power roller ect, complete as directed by the engineer in charge of works and as per technical specifications. | 667.2 | Cubic Meter | 127.82 | ₹85,281.5 |
| 8 | Gst 18% | 1 | No | 1 | ₹1 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
document88.pdf
Tender Documents • 0.64 MB
BOQ_863858.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .