| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-Finance BHAGWATI NAGAR JAMMU | ₹1.2 L | L1 | Accepted-Finance L1 for item No.01 |
| 2 | L1₹4.0 LAccepted-Finance GSTIN: 01BALPS0965Z1ZPINDUSTRIAL ESTATE DIGIANA JAMMU | ₹4.0 L | L1 | Accepted-Finance L1 for item No.02 |
| 3 | L2₹5.4 LAccepted-Finance GSTIN: 01AWRPS2836D3ZHBARI BRAHMANA JAMMU | ₹5.4 L | L2 | Accepted-Finance L2 |
| 4 | L3₹5.4 LAccepted-Finance GSTIN: 01AFBPR2044B1ZBBHAGWATI NAGAR JAMMU | ₹5.4 L | L3 | Accepted-Finance L3 |
| Sl No | Description | Qty | Unit | M/S V.N ENGG WORKS L1 | JAGDEMBAY MECH ENGG WORKS L3 | PERFECT ELECTRICAL WORKS L2 | BEE AAR ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|
| 1.01 | Providing of various machinery and equipment parts to 250 KVA transformer installed at Ujh Barrage by way of disconnecting of HT and LT electrical supply of the transformer by deploying skilled labour. De-mounting the transformer from its installed position by way of using long boom crane and then shifting it into the vehicle with the assistance of manual labour for carriage, shifting it to work shop. Unloading in the workshop in the same manner by using crane and specified tools/tackles. Dismantling of the transformer and then extracting out the damaged worn-out coils and other components of the transformer from the tank after draining out the old transformer oil. Complete rewinding, Testing and Refitting of HT coils and LT strips by using superior double paper covered wires of requisite size/gauge. Servicing, cleaning and flushing of oil tank by using chemicals to clean all the carbon deposits. Providing and fitting of HT bush 03 Nos, HT bush rod 03 Nos, HT bush clamp 03 Nos, LT bush 04 Nos, LT bush rod 04 Nos, Set of Gaskets including all accessories items i.e. Cotton tape, Bobon tape, Gum, sleeves , nuts/bolts, sundry items along with other parts. Assembling the transformer, re-filling the extracting transformer oil after de-moisturing into the oil chamber & topping up with new transformer oil- 150 lts (approx.). Job also includes cleaning the complete surface of transformer by scratching/removing of old paint with heat treatment, wire brush and emery paper. Then applying two coat of superior quality of smoke gray paint on the whole surface of transformer and then Shifting of repaired transformer to work site at Ujh Barrage mounting it on its appropriate/original position by way of using long boom Crane. P/F of new thimbles with proper crimping tool, nut bolts, insulation material used for making all the electrical connections and then testing on full load. Complete job includes installation/fitting charges, tools and tackles required for the execution of job along with the cost of material including cost of supply at site besides charges of installation and all the taxes as applicable(01 job) | 1 | Job | 1,28,800 ₹1.3 L | 1,31,000 ₹1.3 L | 1,24,300 ₹1.2 L | 1,27,500 ₹1.3 L |
| 1.02 | 2. (A)Provision for providing of various machinery and equipment parts to motors, dial indicator assemblies, electromagnetic brakes along with allied electromechnical works at Ujh Barrage.(B) Provision for providing of various machinery and equipment parts to Elecon worm gear box, Central drive units, driving and floating shafts along with allied electromechnical works at Ujh Barrage. As per Scope of work Annexure "C" of SBD item no.02 | 1 | Job | 4,02,600 ₹4.0 L | 4,06,500 ₹4.1 L | 4,09,000 ₹4.1 L | 4,11,700 ₹4.1 L |
Tender Value
Refer Docs
EMD Value
₹11,000
Closing Date
24 Feb 2026, 1:00 pmClosed
Executive Engineer Mech. Division RTIC Kathua
Executive Engineer Mech. Division RTIC Kathua
e-NIT No. 17 of 2025-26 dt. 12.02.2026
2026_IFC_303027_1
e-Nit No.17 of 2025-26 dt. 12.02.2026
Open Tender
Machineries/ Mechanical Engg Items
20 days
Ujh-Barrage
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Executive Engineer Mech. Division RTIC Kathua
₹11,000
Yes
Executive Engineer Mech. Division RTIC Kathua
28 Feb 2026
12 Feb 2026
25 Feb 2026
12 Feb 2026
24 Feb 2026
16 Feb 2026
14 Feb 2026
Providing of various machinery and equipment parts to 250 KVA transformer installed at Ujh Barrage by way of disconnecting of HT and LT electrical supply of the transformer by deploying skilled labour. De-mounting the transformer from its installed position by way of using long boom crane and then shifting it into the vehicle with the assistance of manual labour for carriage, shifting it to work shop. Unloading in the workshop in the same manner by using crane and specified tools/tackles. Dismantling of the transformer and then extracting out the damaged worn-out coils and other components of the transformer from the tank after draining out the old transformer oil. Complete rewinding, Testing and Refitting of HT coils and LT strips by using superior double paper covered wires of requisite size/gauge. Servicing, cleaning and flushing of oil tank by using chemicals to clean all the carbon deposits. Providing and fitting of HT bush 03 Nos, HT bush rod 03 Nos, HT bush clamp 03 Nos, LT bush 04 Nos, LT bush rod 04 Nos, Set of Gaskets including all accessories items i.e. Cotton tape, Bobon tape, Gum, sleeves , nuts/bolts, sundry items along with other parts. Assembling the transformer, re-filling the extracting transformer oil after de-moisturing into the oil chamber & topping up with new transformer oil- 150 lts (approx.). Job also includes cleaning the complete surface of transformer by scratching/removing of old paint with heat treatment, wire brush and emery paper. Then applying two coat of superior quality of smoke gray paint on the whole surface of transformer and then Shifting of repaired transformer to work site at Ujh Barrage mounting it on its appropriate/original position by way of using long boom Crane. P/F of new thimbles with proper crimping tool, nut bolts, insulation material used for making all the electrical connections and then testing on full load. Complete job includes installation/fitting charges, tools and tackles required for the execution of job along with the cost of material including cost of supply at site besides charges of installation and all the taxes as applicable(01 job)
2. (A)Provision for providing of various machinery and equipment parts to motors, dial indicator assemblies, electromagnetic brakes along with allied electromechnical works at Ujh Barrage.(B) Provision for providing of various machinery and equipment parts to Elecon worm gear box, Central drive units, driving and floating shafts along with allied electromechnical works at Ujh Barrage. As per Scope of work Annexure "C" of SBD item no.02
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
SBDseventeen.pdf
Tender Documents • 0.70 MB
BOQ_983368.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid