Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 12 14 3RD STREET ANNAI SATHYA NAGAR CHENNAI 600 118 | CHENNAI | CHENNAI | TAMIL NADU | 600118 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical M 241 RAGAVENDRA NAGAR TNHB SEVELIMEDU KANCHIPURAM DISTRICT TAMIL NADU 631 502 | SEVELIMEDU | KANCHIPURAM | TAMIL NADU | 631502 | Rejected-Technical Technically Rejected |
Tender Value
Refer Docs
EMD Value
₹38,000
Closing Date
3 Jul 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Archaeologist
O/o The Superintending Archaeologist, Archaeological Survey of India, Chennai Circle
MW(C) TO APATHSAHAYESWARA TEMPLE, THENNERI, TAMIL NADU 2022-23
2023_ASI_757313_1
Sout/Chen/Kanc/6 La/11415546
Limited
Civil Works - Buildings
Works
120 days
As Per Tender Document
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹38,000
Yes
24 Jul 2023
12 Jun 2023
4 Jul 2023
12 Jun 2023
3 Jul 2023
12 Jun 2023
Amount
Provision for carefully removing the vegetation growth and uprooted the small trees, thorny bushes along with demarcate boundary collecting and disposing them to a far off place etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete all as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for removal of accumulated debris including earthwork excavation and dispose the same from the monumental area to village limit etc. by using lorry/tractor etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete as per the drawings enclosed and as directed by the department officials. (Quantity may be varied as per site conditions).
Earth work excavation for laying brick jelly concrete on hard soil with initial lead and lift collecting, conveying the debris to a far off distance etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete all as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for laying brick jelly concrete in pure lime 1:2 using 20mm size, consolidation, curing etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete all as directed by the department officials. (Quantity may be varied as per site conditions).
Laying new stone flooring using granite stone slabs 75 to 100 mm thick after neatly dressing the top, cutting the sides, set in cement mortar 1:3 and pointing the stone joints with combination mortar 1:1:5 with necessary colour matching, curing etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete all as directed by the department officials. (Quantity may be varied as per site conditions).
Supplying new granite kerb stone Edges of size 1.00 x 0.30 x 0.10 m for the side of apron/pathway with neatly dressed and cutting the top corner, etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete all as directed by the department officials. (Quantity may be varied as per site conditions).
Earth work excavation for laying brick jelly concrete on hard soil with initial lead and lift collecting, conveying the debris to a far off distance, etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete all as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for laying Brick jelly concrete in pure lime in 1:2 using 20mm brick jelly 100mm thick curing etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete all as directed by the department officials. (Quantity may be varied as per site conditions).
Fixing the Kerb stone along the apron / pathway set in combination mortar 1:1:3, curing etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete all as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for carefully dismantling and removing the dead/damaged plastering of coping of outer prakara wall, disposing the waste debris to a far off place and then re-plastering the same with combination mortar 1:1:5, 20mm thick curing etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete all as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for strengthening the stone masonry prakara wall by way of carefully racking out the existing damaged stone joints, disposing the waste debris, grouting wherever necessary, underpinning the missing stones if any etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete all as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for re-pointing stone joints of outer prakara wall and existing stone flooring with fresh combination mortar 1:1:5 including cost of all materials and labour charges etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete all as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for supplying and fixing of new stones for extending the both sides of existing steps leading to main temple for the convenience of devotees and visitors etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete all as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for carefully collecting, conveying the scattered stone members inside and outside the temple on southern side and set righting the same etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete all as directed by the department officials. (Quantity may be varied as per site conditions).
Carefully dismantling and removing the undulated/tilting existing stone flooring and then relaying over 100mm thick brick jelly concrete in pure lime 1:2, set in cement mortar 1:3 and pointing the stone joints with combination mortar 1:1:5 colour matching, curing etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete as per the drawings enclosed and as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for increasing the height of the stone pillars of main entrance gate with RR stone masonry set in cement mortar 1:3, pointing the stone joints with combination mortar 1:1:5, curing etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete all as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for carefully dismantling and removing the damaged flooring, disposing the waste debris to a far off place etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete all as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for laying plain cement concrete using 3 to 10mm stone jelly, consolidation, curing etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete all as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for top plastering over the stone jelly concrete with combination mortar 1:1:5 20mm thick curing etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete all as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for carefully dismantling and removing the damaged plastering, disposing the debris to a far off place and then re-plastering with combination mortar 1:1:5 20mm thick curing etc. complete including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete all as directed by the department officials. (Quantity may be varied as per site conditions).
Making, supplying and fixing of M.S. Grill gate of size: 4.00 x 1.60 mtr. with 50x50x6mm L'angle frame, welded with 50x6mm Flat 3 Nos. in horizontal and 16mm dia MS rounds at 10 cm. c/c in vertical fixing the grill with suitable bearings and hinges in RR masonry pillar including cost, conveyance of all materials, labour charges, loading and unloading charges, transportation charges etc., and other applicable taxes if any complete as per the drawing enclosed as directed by the department officials. (Quantity may be varied as per site conditions).
Rajendran Contractor
N VEERAMANI ( LAKSHMI ENGINEERING SERVICES )
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .