| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.8 LAccepted-AOC S O SH SURESH SINGH R O VPO MADINA KAURSAN DISTRICT ROHTAK 124111 HARYANA 124111 | MADINA | ROHTAK | HARYANA | 124111 | L1 | Accepted-AOC AOC | |
| 2 | L2₹41.6 L+₹73,053.28 (1.79%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical C O PAWAN KUMAR S O SH RISHAL SINGH R O VPO RAWALWAS KHURD HISAR | HISAR | HISAR | HARYANA | - | Rejected-Technical Technically Bid Open | |
| 4 | Rejected-Technical HISAR | - | Rejected-Technical Technically Bid Open | |
| 5 | Rejected-Technical 83 VPO SANGHI ROHTAK 124303 | ROHTAK | ROHTAK | HARYANA | 124303 | - | Rejected-Technical Technically Bid Open |
| Sl No | Description | Qty | Unit | Dinesh Kumar Contractor L2 | The Angad Co-op L&C Society Ltd. L1 |
|---|---|---|---|---|---|
| 1.00 | NS Item -Analysis of Brick And Steel | 8,553 | Each | 4.5 ₹-38,488.5 Lowest | 5 ₹-42,765 |
| 2.00 | NS Item -Supply of RCC Slabs in Municipal Committee
Kalanaur | 300 | Each | 1,500 ₹4,50,000 | 1,458 ₹4,37,400 Lowest |
Tender Value
₹41.6 L
EMD Value
₹98,280
Closing Date
24 Feb 2026, 5:00 pmClosed
Pankaj Garg
Municipal Committee Kalanaur
Construction of RCC Nalla from Govt. Model Sanskriti Sr. Sec. School to Lahar wali gali in Municipal Committee Kalanaur.
2026_HRY_503138_1
202650509971 29A3 4992 AAA6 6950F19328EC318ULB
Open Tender
Civil Works
Works
120 days
Kalanaur
2 documents required · 2 mandatory
₹2,500
₹98,280
Yes
10 Mar 2026
17 Feb 2026
25 Feb 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
NS Item -Analysis of Brick And Steel
NS Item -Supply of RCC Slabs in Municipal Committee Kalanaur
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
HSR Item 17.69.2-Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. HSR Rate(Rs.) 655.00 Through Rate
HSR Item 13.29.2-Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works HSR Rate(Rs.) 83.00 Through Rate
HSR Item 6.1.1-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) HSR Rate(Rs.) 3975.00 Through Rate
HSR Item 5.7.4-Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar HSR Rate(Rs.) 585.00 Through Rate
HSR Item 17.5.3-Compacting Original Ground 3. Compaction of Earthwork Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications HSR Rate(Rs.) 7.00 Through Rate
HSR Item 6.66-Extra for laying reinforced cement concrete in or under water and/ or liquid mud, including cost of pumping or bailing out water and removing slush etc., complete. HSR Rate(Rs.) 360.00 Material Rate
HSR Item 3.1.18-By Mechanical Transport including loading, unloading and stacking 18. Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of Engineer-in-charge. HSR Rate(Rs.) 202.00 Rate
HSR Item 17.23.2-Water Bound Macadam Grading - II 2. Water Bound Macadam (53mm to 22.4 mm)Grading II with screenings Type “B” (11.2 mm aggregates) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications HSR Rate(Rs.) 1243.00 Through Rate
HSR Item 5.23.2-Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) HSR Rate(Rs.) 1149.00 Through Rate
HSR Item 4.14.1-Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. HSR Rate(Rs.) 83.00 Through Rate
HSR Item 6.1.6-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) HSR Rate(Rs.) 2442.00 Through Rate
HSR Item 6.30.2-Centering and shuttering including strutting, propping etc. and removal of form for 2. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. HSR Rate(Rs.) 282.00 Through Rate
HSR Item 6.34.6-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. HSR Rate(Rs.) 68.00 Through Rate
HSR Item 7.21.2-Brick work with common burnt clay non modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) HSR Rate(Rs.) 3968.00 Through Rate
HSR Item 11.6.1-15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) HSR Rate(Rs.) 138.00 Through Rate
HSR Item 6.67-Extra for laying reinforced cement concrete in or under foul positions. HSR Rate(Rs.) 189.00 Material Rate
HSR Item 6.15.1-Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone III) : 3 graded stone aggregate 20 mm nominal size) HSR Rate(Rs.) 5969.00 Through Rate
HSR Item 11.97.3-Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : 3. Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 litre/10 sqm over an under coat of primer applied @ 0.80 litre/10 sqm of approved brand and manufacture HSR Rate(Rs.) 59.00 Through Rate
HSR Item 26.76-Providing and fixing pair of Plastic dustbins 100 litre volume each, of two different colours, for dry and wet waste, made of virgin plastic to be mounted on MS rectangular hollow section 50 x 25 x 3 mm frames pivoted on 3 MS square hollow section verticals, 1 m above ground, one 35 cm RHS welded to each vertical member at base and grouted in 180 x 40 x 30 cm 1:2:4 cement concrete. HSR Rate(Rs.) 10666.00 Through Rate
HSR Item 11.59-Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. HSR Rate(Rs.) 71.00 Through Rate
HSR Item 26.41.2-Supplying and display seasonal flowers of F1 hybrid quality in earthen pots at site of work, as specified by Engineer-in-charge including cost of pot. 2. Seasonal well bloomed flower seedlings in 25 cm size of pots HSR Rate(Rs.) 108.00 Through Rate
HSR Item 13.30.2-Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 2. Hot finished seamless type tubes HSR Rate(Rs.) 118.00 Through Rate
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_581830.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .