Loading…
Loading…
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
19 Jun 2026, 4:00 pm7d left
Er. Layaqit Ali (Executive Engineer)
OFFICE OF THE EXECUTIVE ENGINEER PWD DIV SURANKOTE
Please Refer to BOQ.
2026_PWDJK_312199_1
e-NIT No.29 of 2026-27 Dated 11-06-2026
Open Tender
Civil Works
60 days
SURANKOTE
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
₹30,000
11 Jun 2026
11 Jun 2026
20 Jun 2026
11 Jun 2026
19 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 73.48 | Cum | 256.85 | ₹18,873.34 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 28.08 | Cum | 4,826.5 | ₹1,35,528.12 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 37.4 | Cum | 5,733.6 | ₹2,14,436.64 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 79.88 | Cum | 7,788.4 | ₹6,22,137.39 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more | 3,594.38 | Kg | 123.2 | ₹4,42,827.62 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 60.5 | Sqm | 286.35 | ₹17,324.18 |
| 7Carriage of material by M.T including loading and unloading and stacking on site complete | |||||
| 7.01 | Carriage of Sand aggrigate below 40mm nominal size by an average distance of 8 km by MT | 197.53 | Cum | 247.72 | ₹48,932.13 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.77 MB
BOQ_1010610.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid