Loading…
Loading…
Tender Value
₹19.3 Cr
EMD Value
₹38.6 L
Closing Date
30 Jun 2026, 3:00 pmClosed
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
Above/Below/Par
WORKS
13 conditions · 2 needing a document upload
As per GCC 10(b):- The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; Where: V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of 'total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VI B, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet
As mentioned in GCC 2022 clause 10(a) The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. The work is executed for similar nature of work as under: Execution of any 25 kV AC OHE work The work must have been carried out in any of the following organizations: a) Central Government departments or State Government departments. b) Central government PSUs or State Government PSUs.
18 conditions · 17 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Following documents mentioned at (a) to (h) below, should be furnished along with tender and should be submitted online at the time of tender bidding. Tenders not accompanied by these documents will be summarily rejected.
(a) TENDER FORM (First Sheet) (Ref: Page Nos.9 & 10 of GCC April 2022).
(b) Work(s) completion certificate(s) as per the requirement of Technical eligibility criteria (Ref: Clause 10.1 & and for tenderer participating as JV firm Clause 17.15.1 of TENDER FORM (Second Sheet) at Page Nos.12-14 & 24 of April 2022).
( c ) Documents as per the requirement of financial eligibility criteria (Ref: Clause 10.2 and for tenderer participating as JV firm Clause 17.15.2 of TENDER FORM (Second Sheet) along with Annexure-VIB at Page Nos.12-14 & 24 of GCC April 2022).
(d) Documents for evaluating the Bid Capacity, for tenders having advertised value more than Rs.10.00 crore. (Ref: Clause 10.3 and for tenderer participating as JV firm Clause 17.15.3 of TENDER FORM (Second Sheet) along with Annexure-VI, at Page Nos.14, 25 & 35-36 of GCC April 2022), Correction Slip - 11, GCC- 2022.
( e ) Certificate stating that the tenderer/s are not liable to be disqualified and all their statements / documents submitted along with bid are true and factual as per Annexure-V (Ref: PARA 6.1 of Part-I, Instruction to Tenderers(ITT) at Page Nos.7 & 33-34 of GCC April 2022).
( f ) In case the tenderer is other than Joint Venture (JV) firm, tenderer has to submit all the documents as mentioned below (Ref: Clause 14 (ii) (a) to (c), (e) to (g), (iv) & 18.10 of TENDER FORM (Second Sheet) at Page Nos.17-18 of GCC April 2022):
(g) In case the tenderer is a Joint Venture (JV) firm, tenderer has to submit all the documents as mentioned below: (i)Copy of Memorandum of Understanding (MoU) duly executed by the JV members on a stamp paper, shall be submitted by the JV along with the tender. The complete details of the members of the JV, their share and responsibility in the JV etc. particularly with reference to financial, technical and other obligations shall be furnished in the MoU. (Ref: Clause 17.6 of TENDER FORM (Second Sheet) at Page Nos. 21 of GCC April 2022 & Appendix- VIII of the Tender Document). (ii)Documents of JV Members: (Ref: Clause 17.14 of TENDER FORM (Second Sheet) at Page Nos.22- 24 of GCC April 2022): (iii)All other documents in terms of Para 10 of the TENDER FORM (Second Sheet) at Page Nos.12-16 of GCC April 2022.
Electrical Contractor License
Electrical Supervisor License
Copy of the complete details of the firm as per Appendix-I of the Tender/Technical Bid Document, to which all correspondences shall be made by the Railway.
Copy of Goods and Services Tax (GST) Registration Certificate containing GST Registration Number. Copy of PAN Card. Copy of Aadhaar Card.
Compliance of Employment / Partnership etc. of Retired Railway Employees as per Clause 16 of TENDER FORM (Second Sheet) at Page Nos.19-20 of GCC April 2022, failing which contract is liable to be dealt in accordance with provision of Clause 62 of Standard General Condition of Contract at Page Nos.92-95 of GCC April 2022 (Note: Information / Certification should be given as per 'Appendix-IV').
If a tender is accepted on the quoted rates of bidder which is below the advertised tender value, an additional performance security shall be submitted by the bidder as below: Bid quoted in % of advertised cost (below 0 - 5% inclusive) = Nil. Bid quoted in % of advertised cost (below 5%) = 5%.
In case of tenderer is participating as Sole Proprietor in a tender, the tenderer should submit and undertaking on suitable stamp paper to this effect clearly mentioning PAN Number also along with tender document at the time of submitting of tender.
Tenderers shall note that the submission of other following supporting documents, is important and they shall ensure the same at the time of on line bidding of tender. However Railways may seek clarifications / details / documents in this regard: (a) Copy of Vendor Mandate Form as per Appendix-VII of the Tender Document. All Payments to the agency [Including the refund of the Earnest Money (EMD) of the unsuccessful bidder] will be remitted through NEFT. The Tenderer is required to declare Bank details and A/C No. etc. in Vendor Mandate Form. (b) Copy of the complete details of the firm as per Appendix-I of the Tender/Technical Bid Document, to which all correspondences shall be made by the Railway. (c) Copy of Goods and Services Tax (GST) Registration Certificate containing GST Registration Number. (d) Copy of certificate by tenderer for site visit & familiarization as per Appendix-VI of the Tender/Technical Bid Document. (e) Copy of the list of the Personnel / Organization of the tenderer on hand and proposed to be engaged for this tender as per Appendix-IV of the Tender/Technical Bid Document (Ref: CP/23/23). (f) Copy of list of the plants & machinery of tenderer available on hand and proposed to be inducted & hired for this tender as per Appendix-V of the Tender/Technical Bid Document (Ref: CP/23/24).
Annexure V(A) for blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender
Left over work of Design, supply of materials, modification, erection, removal of infringements, testing & commissioning of 25KV AC OHE in connection with Asangaon-Khardi Section of Kalyan Kasara 3rd Line in Mumbai Division of Central Railway.
LCF-DR-OHE-506-2026-01
LCF-DR-OHE-506-2026-01
Open
Works - General
6 Months
Unknown (Unspecified Location)
₹0
₹38.6 L
30 Jun 2026
5 Jun 2026
16 Jun 2026
249 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 19,31,38,433 | ||
| — | 15.00 | — | — | ||
| Preparation of design & drawings for overhead quipment and verification of Purchaser's pegging plans | — | — | — | 2,93,220 | |
| — | 500.00 | — | — | ||
| M-20 Concrete of foundation and plinth in hard soil. | — | — | — | 46,33,000 | |
| — | 800.00 | — | — | ||
| M-20 Concrete of foundation and plinth in rocky soil. | — | — | — | 78,97,600 | |
| — | 1400.00 | — | — | ||
| M-20 Concrete of foundation and plinth in other than hard & rocky soil | — | — | — | 1,22,37,400 | |
| — | 350.00 | — | — | ||
| Supply only fabricated and galvanished steel. Fabrication, galvanised and supply only of K- series, B-series, T-series, G-series, S-series mast/portals- Uprights. | — | — | — | 4,03,75,650 | |
| — | 100.00 | — | — | ||
| Supply only fabricated and galvanished steel. Fabrication, galvanisation and supply only of portal booms/portal uprights made up of angle steel members. | — | — | — | 1,17,16,900 | |
| — | 100.00 | — | — | ||
| Supply only fabricated and galvanished small part steel. | — | — | — | 1,11,69,900 | |
| — | 400.00 | — | — | ||
| Erection of K/B/G/T Series cantilever mast, mast of head span/uprights of D/G type Portals | — | — | — | 61,62,400 | |
| — | 120.00 | — | — | ||
| Erection of portal booms/ Angle fabricated portal boom upright by purchaser's rail crane. | — | — | — | 18,20,280 | |
| — | 100.00 | — | — | ||
| Erection of small part steel work. | — | — | — | 16,13,900 | |
| — | 150.00 | — | — | ||
| Supply of guy rod assembly. | — | — | — | 14,54,400 | |
| — | 150.00 | — | — | ||
| Erection of guy rod assembly. | — | — | — | 3,92,700 | |
| — | 20.00 | — | — | ||
| Supply of OHE (including wiring) | — | — | — | 31,55,600 | |
| — | 20.00 | — | — | ||
| Erection of OHE (including wiring) | — | — | — | 55,86,180 | |
| — | 200.00 | — | — | ||
| Supply of 25 KV insulation with modified bracket assembly for two wire OHE with 125/129/242 sq.mm catenary & 193 sq.mm contact wire on structures. (Open route).The insulators shall be of Porcelain type only. | — | — | — | 60,01,200 | |
| — | 200.00 | — | — | ||
| Erection of 25 KV insulation with modified bracket assembly for two wire OHE with 125/129/242 sq.mm catenary & 193 sq.mm contact wire on structures. (Open route). The insulators shall be of Porcelain type only. | — | — | — | 7,15,800 | |
| — | 80.00 | — | — | ||
| Supply of suspension arrangement with 9 tonne insulator for 125/129/150/242 sq.mm 2 single catenary /feeder/jumper/ wire. (Cable Hanger) The insulators shall be of Porcelain type only | — | — | — | 7,52,000 | |
| — | 80.00 | — | — | ||
| Erection of suspension arrangement with 9 tonne insulator for 125/129/150/242 sq.mm 2 single catenary /feeder/jumper/ wire. (Cable Hanger) The insulators shall be of Porcelain type only | — | — | — | 1,12,560 | |
| — | 500.00 | — | — | ||
| Supply of Single Bracket Cantilever assembly with High (Long) Creepage Distance suitable for polluted zone type ST & BT insulators. The insulators shall be of Porcelain type only | — | — | — | 1,26,74,500 | |
| — | 400.00 | — | — | ||
| Erection of Single Bracket Cantilever assembly with High (Long) Creepage Distance suitable for polluted zone type ST & BT insulators. The insulators shall be of Porcelain type only | — | — | — | 12,67,600 | |
| — | 100.00 | — | — | ||
| Supply of materials for termination of OHE for 129/125/242/107/193/323 sq mm main contact/catenary/feeder wire with compensanting plate & one 9 ton insulator. The insulators shall be of Porcelain type only | — | — | — | 15,79,500 | |
| — | 100.00 | — | — | ||
| Erection of materials for termination of OHE for 129/125/242/107/193/323 sq mm main contact/catenary/feeder wire with compensanting plate & one 9 ton insulator. The insulators shall be of Porcelain type only | — | — | — | 2,59,800 | |
| — | 35.00 | — | — | ||
| Supply of 9 tonne cut in insulator for 193 sq mm contact wire. The insulators shall be of Porcelain type only. | — | — | — | 3,19,200 | |
| — | 35.00 | — | — | ||
| Erection of 9 tonne cut in insulator for 193 sq mm contact wire. The insulators shall be of Porcelain type only. | — | — | — | 49,035 | |
| — | 35.00 | — | — | ||
| Supply of 9 tonne cut in insulator for 129 / 125 / 323 / 242 / 105 sq mm catenary / feeder wire. The insulators shall be of Porcelain type only. | — | — | — | 3,19,200 | |
| — | 35.00 | — | — | ||
| Erection of 9 tonne cut in insulator for 129 /125 / 323 / 242 / 105 sq mm catenary / feeder wire. The insulators shall be of Porcelain type only. | — | — | — | 49,035 | |
| — | 50.00 | — | — | ||
| Supply of 25 kV post insulator | — | — | — | 4,99,700 | |
| — | 50.00 | — | — | ||
| Erection of 25 kV post insulator | — | — | — | 26,000 | |
| — | 10.00 | — | — | ||
| Supply of 25 KV section insulator suitable for 193 sq.mm contact wire, For OHE system on turn out, cross-over/loop line. (242/129/125/323 sq mm catenary and 193 sq mm contact wire) | — | — | — | 8,13,960 | |
| — | 10.00 | — | — | ||
| Erection of 25 KV section insulator suitable for 193 sq.min contact wire, For OHE system on turn out, cross-over/loop line. (242/129/125/323 sq mm catenary and 193 sq mm contact wire) | — | — | — | 1,20,220 | |
| — | 10.00 | — | — | ||
| Supply of 25KV, 1600 amps, single pole Isolators without earth contact assembly. | — | — | — | 9,81,360 | |
| — | 10.00 | — | — | ||
| Erection & commissioning of 25KV, 1600 amps, single pole Isolators without earth contact assembly. | — | — | — | 65,980 | |
| — | 10.00 | — | — | ||
| Supply of Extra on item 31-32 for an inter-locking device- mechanical/electrical (Also provision of copper beaded flexible jumper for isolator | — | — | — | 42,260 | |
| — | 10.00 | — | — | ||
| Erection of Extra on item 31-32 for an inter-locking device- mechanical/electrical (Also provision of copper beaded flexible jumper for isolator | — | — | — | 5,060 | |
| — | 20.00 | — | — | ||
| Supply of material for Anti Creep arrangement | — | — | — | 3,82,340 | |
| — | 20.00 | — | — | ||
| Erection of material for Anti Creep arrangement | — | — | — | 56,200 | |
| — | 25.00 | — | — | ||
| Supply for Formation of new IOL/UIOL at SP/SSP/TSS/Neutral section | — | — | — | 10,66,925 | |
| — | 25.00 | — | — | ||
| Erection for Formation of new IOL/UIOL at SP/SSP/TSS/Neutral section | — | — | — | 3,60,000 | |
| — | 15.00 | — | — | ||
| Supply of material for Turn outs/cross overs | — | — | — | 4,33,590 | |
| — | 15.00 | — | — | ||
| Erection of material for Turnouts/cross overs | — | — | — | 1,26,480 | |
| Each | 300.00 | Span | — | ||
| Supply of dropper & dropper adjustement for AC insulation on newly erected structure (All new droppers/fittings in one span) / For Droppering & reprofiling. | — | — | — | 40,88,400 | |
| Each | 300.00 | Span | — | ||
| Erection of dropper & dropper adjustement for AC insulation on newly erected structure (All new droppers/fittings in one span) / For Droppering & reprofiling | — | — | — | 12,18,600 | |
| — | 70.00 | — | — | ||
| Supply for 105 sq mm in-span jumper for 2 wire system alongwith PG/ Connector for 160/105/323/242/193/129/125 Sq.mm Jumper /catenary/contact Wire | — | — | — | 4,41,070 | |
| — | 70.00 | — | — | ||
| Erection for 105 sq mm in-span jumper for 2 wire system alongwith PG/ Connector for 160/105/323/242/193/129/125 Sq.mm Jumper /catenary/contact Wire. | — | — | — | 25,060 | |
| — | 10.00 | — | — | ||
| — | — | — | 2,21,520 | ||
| for | :- Supply 160/105/323/242/193/129/125 | 160 sq mm Sq.mm Jumper | — | ||
| — | — | — | Connector | ||
| — | 10.00 | — | — | ||
| Erection for 160 sq mm G Jumper alongwith 160/105/323/242/193/129/125 Sq.mm Jumper /catenary/contact Wire. | — | — | — | 42,200 | |
| — | — | — | PG/ | ||
| — | — | — | Connector | ||
| — | 50.00 | — | — | ||
| Supply of ATD without counter weight assembly as per Techincal specification andexplanatory notes. (5 pulley ATD) | — | — | — | 31,56,100 | |
| — | 50.00 | — | — | ||
| Erection of Regulating Equipment 5 pully block type with counter weight as per Rly approved drawing | — | — | — | 3,50,000 | |
| Each | 15.00 | Span | — | ||
| Supply of material for Splicing & extension of OHE with Contractor's supply material - U clamps etc for both contact and catenary. | — | — | — | 1,72,575 | |
| Each | 15.00 | Span | — | ||
| Erection of materials for Splicing & extension of OHE with Contractor's supply material -U clamps etc for both contact and catenary. | — | — | — | 2,44,620 | |
| Each | 150.00 | Span | — | ||
| Slewing of OHE | — | — | — | 6,42,750 | |
| — | 150.00 | — | — | ||
| Transfer of equipment from one mast or support to another mast or support. (242/ 150/ 65/ 107/ 193/ 125 / 323 sq.mm /earth wire) (It also includes dismantling & removal of old bracket from existing structure) | — | — | — | 5,76,600 | |
| — | 3.00 | — | — | ||
| Supply of 150 sq mm Hard Drawn Stranded Copper Cross Feeder Wire (37/2.25 MM) As per RDSO Spec. No: TI/SPC/OHE/HDCSCF/0031 or latest | — | — | — | 49,27,680 | |
| — | 4.00 | — | — | ||
| Transportation and erection of 150 Sq.mm copper feeder wire. | — | — | — | 2,12,624 | |
| — | 420.00 | — | — | ||
| Supply of a structure bond with 50 x 6mm G.I. flat. | — | — | — | 3,47,340 | |
| — | 420.00 | — | — | ||
| Erection of a structure bond with 50 x 6mm G.I. flat. | — | — | — | 2,34,780 | |
| — | 250.00 | — | — | ||
| Supply of a longitudinal bond with 50 x 6mm G.I. flat. | — | — | — | 1,30,500 | |
| — | 250.00 | — | — | ||
| Erection of a longitudinal bond with 50 x 6mm G.I. flat. | — | — | — | 1,35,250 | |
| — | 200.00 | — | — | ||
| Supply of transverse & special bond with 50 x 6mm G.I. flat. | — | — | — | 1,65,600 | |
| — | 200.00 | — | — | ||
| Erection of transverse & special bond with 50 x 6mm G.I. flat. | — | — | — | 1,14,400 | |
| — | 20.00 | — | — | ||
| Supply of single earth electrode | — | — | — | 76,820 | |
| — | 20.00 | — | — | ||
| Erection of single earth electrode | — | — | — | 53,120 | |
| — | 20.00 | — | — | ||
| Supply for Extra for special embedment of earth electrode. | — | — | — | 39,540 | |
| — | 20.00 | — | — | ||
| Erection for Extra for special embedment of earth electrode. | — | — | — | 49,700 | |
| — | 6.00 | — | — | ||
| Supply, testing of 25 KV/240V, 50 KVA auxiliary transformer | — | — | — | 19,84,344 | |
| — | 6.00 | — | — | ||
| Erection, oil filteration, testing & commissioning of 50 KV/240V, 50 KVA auxiliary transformer | — | — | — | 99,222 | |
| — | 6.00 | — | — | ||
| Supply of 25KV DO Fuse Switch assembly. | — | — | — | 1,61,172 | |
| — | 6.00 | — | — | ||
| Erection, testing & Commissioning of 25KV DO Fuse Switch assembly. | — | — | — | 6,816 | |
| — | 6.00 | — | — | ||
| Supply of anti climbing device etc. for LT supply transformer. | — | — | — | 9,312 | |
| — | 6.00 | — | — | ||
| Erection of anti climbing device etc. for LT supply transformer. | — | — | — | 4,002 | |
| — | 3.00 | — | — | ||
| Supply of 300 A automatic changeover control panel for CLS Supply as per RDSO specification no. TI/SPC/PSI/CLS/0022 or Latest inclusive of termination of cable & required material. | — | — | — | 8,20,596 | |
| — | 3.00 | — | — | ||
| Erection, testing and commissioning of 300 A automatic changeover control panel for CLS Supply as per RDSO specification no. TI/SPC/PSI/CLS/0022 or Latest inclusive of termination of cable & required material. | — | — | — | 27,360 | |
| — | 6.00 | — | — | ||
| Supply of LV Box Assy (with required fuse) for 25KV/50KVA AT as per RDSO drawing | — | — | — | 39,366 | |
| — | 6.00 | — | — | ||
| Erection of LV Box Assy (with required fuse) for 25KV/50KVA AT as per RDSO drawing | — | — | — | 6,954 | |
| — | 12.00 | — | — | ||
| Supply of G.I Junction box on LV side of auxiliary transformer for AT 25 kVA / 50 kVA | — | — | — | 89,748 | |
| — | 12.00 | — | — | ||
| Erection of G.I Junction box on LV side of auxiliary transformer for AT 25 kVA / 50 kVA | — | — | — | 10,476 | |
| — | 1500.00 | — | — | ||
| Transportation & laying connecting testing of 1.1 grade 2x185sq mm/300 sq mm XLPE insulated PVC sheated cable (Cable supplied by railways from Kalyan/Juinagar). | — | — | — | 1,89,000 | |
| — | 30.00 | — | — | ||
| Supply of cable end termination of 2 core 185sq mm/300 sq aluminium armoured cable with suitable gland and lugs etc. | — | — | — | 1,34,970 | |
| — | 30.00 | — | — | ||
| Erection & commissioning of cable end termination of 2 core 185sq mm/300 sq aluminium armoured cable with suitable gland and lugs etc. | — | — | — | 13,500 | |
| — | 2500.00 | — | — | ||
| Supply of RCC truncking with RCC warning cover of size 500mm X 220mm x 215mm | — | — | — | 5,82,500 | |
| — | 2500.00 | — | — | ||
| Placing of RCC truncking with RCC warning cover of size 500mm X 220mm x 215mm | — | — | — | 22,500 | |
| — | 80.00 | — | — | ||
| Supply of 75 mm dia size B' class GI pipes for protection of cables on wall/poles | — | — | — | 37,920 | |
| — | 80.00 | — | — | ||
| Erection of 75 mm dia size B' class GI pipes for protection of cables on wall/poles | — | — | — | 2,720 | |
| — | 80.00 | — | — | ||
| Supply of HT/LT cable route marker | — | — | — | 13,120 | |
| — | 80.00 | — | — | ||
| Erection of HT/LT cable route marker | — | — | — | 1,440 | |
| — | 600.00 | — | — | ||
| Excavation & Resurfacing of cable trench of size 450 mm wide and 1000 mm deep in soil & refilling trench with sand pebbles etc., after laying of cable complete. As per Rly requirement. (IS 1255) | — | — | — | 90,600 | |
| — | 150.00 | — | — | ||
| Laying of 120 sqmm Copper Cable | — | — | — | 4,200 | |
| — | 20.00 | — | — | ||
| Supply of 2 core 120sqmm Cable Termination | — | — | — | 4,660 | |
| — | 20.00 | — | — | ||
| Erection of 2 core 120sqmm Cable Termination | — | — | — | 640 | |
| — | 20.00 | — | — | ||
| Supply of 25x3 GI Flat for CLS earthing | — | — | — | 2,640 | |
| — | 20.00 | — | — | ||
| Erection of 25x3 GI Flat for CLS earthing | — | — | — | 460 | |
| — | 250.00 | — | — | ||
| Supply of RCC pipe 2 meter long, 150 mm diameter with collar at one end | — | — | — | 1,02,250 | |
| — | 250.00 | — | — | ||
| Laying of RCC pipe 2 meter long, 150 mm diameter with collar at one end | — | — | — | 11,500 | |
| — | 350.00 | — | — | ||
| Breaking of Hard rock core cutting by using hydraulic mechanical poclain / blasting equipment | — | — | — | 90,86,000 | |
| — | 400.00 | — | — | ||
| Breaking of foundation upto 200 mm below track formation. | — | — | — | 17,35,600 | |
| — | 20.00 | — | — | ||
| Extra for manual erection of Portal booms by upto 50MT Road Crane dismantle of portal in power block or without power block | — | — | — | 1,88,860 | |
| — | 20.00 | — | — | ||
| Loading, Transporting and unloading of railway supply material from JNJ /KYN stores to work site with contractors truck of 5-8 Tonne capacity including all tools & crane required for loading & unloading the material | — | — | — | 4,60,280 | |
| Lumpsum | 2.00 | 1,26,999 | — | ||
| Erection of material for Provision of Anti Theft charging of OHE. | — | — | — | 2,53,998 | |
| — | 6.00 | — | — | ||
| Re-Coilling of 129/125/193 sqmm Catenary/CONTACT Wire from damaged Drum to New Drum for manual wiring | — | — | — | 1,55,760 | |
| — | 80.00 | — | — | ||
| Dismantling/cutting/ loading and transporting to Hazibunder (Scrapped steel) and to JNJ store (new full length steel) of old released CTL/POM/Single mast & Structure at site. | — | — | — | 4,99,680 | |
| — | 4000.00 | — | — | ||
| Dismantling of catenary / feeder conductor from site to Parel Store Depot. | — | — | — | 3,48,000 | |
| — | 60.00 | — | — | ||
| Dismantling of DC/AC Section insulator/Bkt insulator/ Isolator/AT/Guy Rod Assembely. | — | — | — | 1,77,900 | |
| Lumpsum | 1.00 | — | — | ||
| Extra @ 50% of erection rate for execution of erection work under Power Block | — | — | — | 49,20,163 | |
| — | 50.00 | — | — | ||
| Supply of material, repairing, water proofing & sealing (fiber & chemical based on gel sealing) of platform roof sheets at locations where OHE masts / portals uprights are erected / dismantled. | — | — | — | 2,86,000 | |
| — | 800.00 | — | — | ||
| Supply of AntiBird disc asper RDSO Drawing No.TI/DRG/OHE/AntiBird/00001/00/01 or latest | — | — | — | 6,00,000 | |
| — | 800.00 | — | — | ||
| Erection of AntiBird disc on HT side of 9 Ton insulator, BT insulator, ST insulator of cantilevers under power block | — | — | — | 77,600 | |
| — | 1000.00 | — | — | ||
| Supply of Porcelain type insulators High (Long) Creepage Distance suitable for polluted zone type ST insulators. | — | — | — | 43,11,000 | |
| — | 1000.00 | — | — | ||
| Supply of Porcelain type insulators High (Long) Creepage Distance suitable for polluted zone type BT insulators. | — | — | — | 41,36,000 | |
| — | 500.00 | — | — | ||
| Supply of Porcelain type insulators High (Long) Creepage Distance suitable for polluted zone type 9 Tonne Insulators | — | — | — | 28,36,500 | |
| — | 500.00 | — | — | ||
| Supply of Extra material for DC BKT assembly to complete bracket assembly for item no.15 - 20 (Exculding ST, BT, RT, Steady arm & insulator) | — | — | — | 16,78,000 | |
| — | 50.00 | — | — | ||
| Supply of Extra material for AC BKT assembly to complete bracket assembly for item no.15 - 20 (Exculding ST, BT, RT, Steady arm & insulator) | — | — | — | 1,67,800 | |
| — | 2.00 | — | — | ||
| Hiring of battery-operated railway track inspection trolleys for inspection | — | — | — | 2,95,000 | |
| — | 20.00 | — | — | ||
| Supply of Danger Board for 25 KV. | — | — | — | 35,960 | |
| — | 20.00 | — | — | ||
| Erection of Danger Board for 25 KV. | — | — | — | 2,700 | |
| — | 20.00 | — | — | ||
| Supply of Warning Board for 25 KV. | — | — | — | 14,980 | |
| — | 20.00 | — | — | ||
| Erection of Warning Board for 25 KV. | — | — | — | 2,900 | |
| — | 20.00 | — | — | ||
| Supply of General caution notice board for Rly station for 25 KV. | — | — | — | 12,320 | |
| — | 20.00 | — | — | ||
| Erection of General caution notice board for Rly station for 25 KV. | — | — | — | 3,300 | |
| — | 20.00 | — | — | ||
| Supply of General caution notice board for staff for 25 KV. | — | — | — | 12,360 | |
| — | 20.00 | — | — | ||
| Erection of General caution notice board for staff for 25 KV. | — | — | — | 3,300 | |
| — | 900.00 | — | — | ||
| Supply of retro reflective number plate | — | — | — | 10,56,600 | |
| — | 900.00 | — | — | ||
| Erection of retro reflective number plate | — | — | — | 50,400 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
01SPECIALINSTRUCTIONTOTENDERER.pdf
ATTACHMENT
02INSTRUCTIONSTOTENDERERS.pdf
ATTACHMENT
03CONDITIONSOFCONTRACT.pdf
ATTACHMENT
04PRICESANDPAYMENTS.pdf
ATTACHMENT
05TENDERSCHEDULE.pdf
ATTACHMENT
06EXPLANATORYNOTES.pdf
ATTACHMENT
07SPECIFICATIONS.pdf
ATTACHMENT
08GCC2022.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .