| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-Finance CHOTOBENE PARA SRIPALLY 713103 | SRI PALLY | PURBA BARDHAMAN | WEST BENGAL | 713103 | ₹4.3 L | L1 | Accepted-Finance Lowest bidder |
| 2 | L2₹4.4 L+₹2,288.25 (0.53%)Rejected-Finance JAMALPUR PURBA BARDHAMAN PIN 713408 | JAMALPUR | PURBA BARDHAMAN | WEST BENGAL | 713408 | ₹4.4 L+₹2,288.25 (0.53%) | L2 | Rejected-Finance 2nd Lowest bidder |
| 3 | L3₹4.4 L+₹4,004.45 (0.92%)Rejected-Finance 171 KATWA ROAD P O DIST BURDWAN | BURDWAN | BURDWAN | WEST BENGAL | ₹4.4 L+₹4,004.45 (0.92%) | L3 | Rejected-Finance 3rd Lowest bidder |
| Sl No | Description | Qty | Unit | BABA MALLESHWAR ENTERPRISE L1 | SUDIKSHA CONSTRUCTION L2 | CHOUDHURY ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Washing, cleaning of chlorine machine unit including chlorine tank, pipe & specials etc. by engaging skilled personnel once in a month with supply of fast moving spares parts such as gland packing, clamp, nut, bolts etc. as required to keep the unit in healthy condition for the period of 12 (twelve) months. w.e.f 01/10/2026 to 30/09/2027 | ||||||
| 1.01 | List of Pump Houses under Khandoghosh Block
a) Sankari w/s scheme, P.H. No.- I & II
b) Sagrai w/s scheme, P.H. No.- I, II & III
c) Taraposh w/s scheme, P.H. No.- I & II
d) Khandoghosh w/s scheme, P.H. No.- I, II & III
e) Bichkhara w/s scheme, P.H. No.- I & II
f) Punshur w/s scheme, P.H. No.- I & II
g) Amilia w/s scheme, P.H. No.- I & II
h) Khejurhati w/s scheme, P.H. No.- I & II
i) Khudkuri w/s scheme, P.H. No.- I & II
j) Chagram w/s scheme, P.H. No.- I & II
k) Guir w/s scheme, P.H. No.- I & II
l) Balabati w/s scheme, P.H. No.- I & II
m) Saranga w/s scheme, P.H. No.- I & II
n) Amra w/s scheme, P.H. No.- I & II
o) Sasanga w/s scheme, P.H. No.- I & II
p) Ukhrid w/s scheme, P.H. No.- I & II
q) Gopalbera w/s scheme, P.H. No.- I & II
r) Sultanpur w/s scheme, P.H. No.- I & II
s) Onari w/s scheme, P.H. No.- I & II
Total pump house- 40 nos
(40 nos. x 1 time/month x 12 months) = 480 times | 480 | Times | 393 ₹1,88,640 Lowest | 397 ₹1,90,560 | 400 ₹1,92,000 |
| 2.00 | Dismantling of chlorine machine at site part by part engaging skilled personnel towards repairing and through servicing of the same as per direction of E.I.C
(Measurement will be taken as per actual no. of through overhauling of chlorinator conducted by mechanic) | 20 | Items | 485 ₹9,700 Lowest | 485 ₹9,700 Lowest | 485 ₹9,700 Lowest |
| 3.00Supply & delivery at site following spares :- | ||||||
| 3.01 | 15 mm dia braided hose pipe | 40 | Mtr. | 34 ₹1,360 Lowest | 34 ₹1,360 Lowest | 34 ₹1,360 Lowest |
| 3.02 | Tail Piece (200 mm long) | 25 | Nos. | 24 ₹600 Lowest | 24 ₹600 Lowest | 24 ₹600 Lowest |
| 3.03 | 15 mm Short Piece (100 mm) | 25 | Nos. | 13 ₹325 Lowest | 13 ₹325 Lowest | 13 ₹325 Lowest |
| 3.04 | 15 mm dia GI Elbow | 5 | Nos. | 22 ₹110 Lowest | 22 ₹110 Lowest | 22 ₹110 Lowest |
| 3.05 | 15 mm dia GI Tee | 5 | Nos. | 35 ₹175 Lowest | 35 ₹175 Lowest | 35 ₹175 Lowest |
| 3.06 | 15 mm dia NRV | 25 | Nos. | 369 ₹9,225 Lowest | 369 ₹9,225 Lowest | 369 ₹9,225 Lowest |
Tender Value
₹4.4 L
EMD Value
₹9,000
Closing Date
24 Aug 2026, 5:30 pmClosed
ASSISTANT ENGINEER, CENTRAL MECHANICAL DIVISION
AE,CMSD,PHED,5TH_FLOOR_PUTHA_BHAVAN,_PURBA_BARDHAMAN
Carrying_out_preventive_as_well_as_breakdown_maintenance_and_repairing_of_chlorinator_for_ascertaining_disinfection_of_different_PWSS_under_Khandoghosh_Block_under_CMD_PHE_Dte._Dist._Purba_Bardhaman.
2026_PHED_1037305_5
WBPHED/AE/CMSD/eNIT-01/2026-27
Open Tender
MECHANICAL
Item Rate
365 days
AE, CMSD, PHED, 5TH FLOOR PUTHA BHAVAN, PURBA BARDHAM
Carrying_out_preventive_as_well_as_breakdown_maintenance_and_repairing_of_chlorinator_for_ascertaining_disinfection_of_different_PWSS_under_Khandoghosh_Block_under_CMD_PHE_Dte._Dist._Purba_Bardhaman.
5 documents required · 5 mandatory
₹9,000
Yes
15 Sept 2026
14 Aug 2026
27 Aug 2026
14 Aug 2026
24 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Washing, cleaning of chlorine machine unit including chlorine tank, pipe & specials etc. by engaging skilled personnel once in a month with supply of fast moving spares parts such as gland packing, clamp, nut, bolts etc. as required to keep the unit in healthy condition for the period of 12 (twelve) months. w.e.f 01/10/2026 to 30/09/2027 | |||||
| 1.01 | List of Pump Houses under Khandoghosh Block
a) Sankari w/s scheme, P.H. No.- I & II
b) Sagrai w/s scheme, P.H. No.- I, II & III
c) Taraposh w/s scheme, P.H. No.- I & II
d) Khandoghosh w/s scheme, P.H. No.- I, II & III
e) Bichkhara w/s scheme, P.H. No.- I & II
f) Punshur w/s scheme, P.H. No.- I & II
g) Amilia w/s scheme, P.H. No.- I & II
h) Khejurhati w/s scheme, P.H. No.- I & II
i) Khudkuri w/s scheme, P.H. No.- I & II
j) Chagram w/s scheme, P.H. No.- I & II
k) Guir w/s scheme, P.H. No.- I & II
l) Balabati w/s scheme, P.H. No.- I & II
m) Saranga w/s scheme, P.H. No.- I & II
n) Amra w/s scheme, P.H. No.- I & II
o) Sasanga w/s scheme, P.H. No.- I & II
p) Ukhrid w/s scheme, P.H. No.- I & II
q) Gopalbera w/s scheme, P.H. No.- I & II
r) Sultanpur w/s scheme, P.H. No.- I & II
s) Onari w/s scheme, P.H. No.- I & II
Total pump house- 40 nos
(40 nos. x 1 time/month x 12 months) = 480 times | 480 | Times | - | - |
| 0.0 | Dismantling of chlorine machine at site part by part engaging skilled personnel towards repairing and through servicing of the same as per direction of E.I.C
(Measurement will be taken as per actual no. of through overhauling of chlorinator conducted by mechanic) | 20 | Items | - | - |
| 0.0 | Supply & delivery at site following spares :- | - | - | - | - |
| 3.01 | 15 mm dia braided hose pipe | 40 | Mtr. | - | - |
| 3.02 | Tail Piece (200 mm long) | 25 | Nos. | - | - |
| 3.03 | 15 mm Short Piece (100 mm) | 25 | Nos. | - | - |
| 3.04 | 15 mm dia GI Elbow | 5 | Nos. | - | - |
| 3.05 | 15 mm dia GI Tee | 5 | Nos. | - | - |
| 3.06 | 15 mm dia NRV | 25 | Nos. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
2911-N-pdf.pdf
Tender Documents • 1.09 MB
BOQ_2548378.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .