Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAccepted-AOC KAMARAJ NAGAR | THIRUVALLUR | TAMIL NADU | 600019 | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.5 L+₹82,518 (7.76%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-WITHDRAW | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-WITHDRAW |
Tender Value
₹10.8 L
EMD Value
₹11,000
Closing Date
22 Apr 2025, 3:00 pmClosed
Block Development Officer(VP), Nallampalli
The Block Development Office, Nallampalli
Improvements to the Burial Ground at Eachampatti H/o Balajangamanahalli, Compound Wall - 30M, Waiting Shed - 1, Borewell -1, CC Pavement - 29M H/o Balajanagamanahalli
2025_RDTN_542463_1
Roc.No.4203/2024/E3, Dt. 07.04.2025 - P04
Open Tender
Civil Works
Item Wise
90 days
The Block Development Office, Nallampalli
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,000
22 May 2025
9 Apr 2025
22 Apr 2025
9 Apr 2025
22 Apr 2025
9 Apr 2025
Amount
Improvements to the Burial Ground at Eachampatti H/o Balajangamanahalli, Compound Wall - 30M, Waiting Shed - 1, Borewell -1, CC Pavement - 29M. H/o Balajanagamanahalli
Waiting Shed (BG Shed) Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m
Collection and Supply of sand filling into the basement Including cost and conveyance to the site and all labour charges
Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Cement mortar 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Brick work in CM 1:5 mix using New Country Bricks including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks
CENTERING BELOW GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
CENTERING ABOVE GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks
Plastering in CM 1:3 mix using 10mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Plastering in CM 1:5 mix using 12mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Weathering Coarse Brick jelly lime concrete 20mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Pressed Tiles including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Scartch proof Ceramic Tiles thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Painting Two Coat of New Plastered wall surface with ready mixed plastic emulsion including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Construction of Compound Wall Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m
Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Brick work in CM 1:5 mix using New Country Bricks including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
CENTERING BELOW GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
CENTERING ABOVE GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Plastering in CM 1:5 mix using 12mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Painting Two Coat of New Plastered wall surface with ready mixed plastic emulsion including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing New borewell With Hand Pumpset Geophysical survey charges Drilling of 150 mm dia Borewell in the hard rock area to the required depth.
Over Burden Soil
Hard Rock Area
Supply and erection of 165mm dia OD PVC 6KSC Casing Pipe in the Borewell
India Mark-ll Hand pumpset as per UNICEF Specification supply and delivery of 32mm dia GI pippes 3.00 metrewith coupling
Supply, delivery & fixing of GI Pipes and Specials 32 mm GI Pipes 3 m with Coupling
Hand pumpset Erection charges
Construction of Handpump Platform as per type design including soakpit
Transport charges of Hand pumpset and GI pipes to site.
Provision for CC Road Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.
Provision for Bitumen pad
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Vijayakumar (BID ID -1311795)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .