| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Complied as per Technical Bid Document |
| 2 | Accepted-Technical | Accepted-Technical Complied as per Technical Bid Document |
Tender Value
Refer Docs
EMD Value
₹4.5 L
Closing Date
15 May 2026, 3:00 pmClosed
EE C D Ayodhya 04
Construction Division Ayodhaya 04,Ayodhya h no 190 bhikhapur distt ayodhya
CONSTRUCTION OF A COMMUNITY CENTRE IN CAMPUS OF ACHARYA NARENDRA DEV UNIVERSITY OF AGRICULTURE AND TECHNOLOGY KUMARGANJ AYODHYA
2026_UPHDB_1143202_2
497/AC-4/32 Dt 25/04/26
Open Tender
Civil Works
Fixed-rate
540 days
AYODHYA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
ee cd ayodhya-04
₹4.5 L
19 May 2026
28 Apr 2026
15 May 2026
28 Apr 2026
15 May 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out construction of shoring & bracing ,removal of stumps and other deleterious materials and disposal upto a lead of 50m,dressing of sides and bottom and backfilling in trenches with excavated suitable material. | 548.1 | CUM | 134.37 | ₹73,648.2 |
| 2 | Filling of carted earth in plinth including supply of necessary quantity of earth from a distance not exceeding 8km from the side of work and including watering dressing etc. required for proper completion of work.(lead up to 30m & lift 1.5m) | 153.55 | CUM | 530.28 | ₹81,424.49 |
| 3 | Providing & laying cement concrete in 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggreagate 40mm nominal size) including supply of all materials,labour and T & P etc. required for completion of work and curing complete including cost of form work in foundation and floors | 98.63 | CUM | 5,156.68 | ₹5,08,603.35 |
| 4 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km from the site of work and including watering ,dressing etc rate to include cost of all materials, labour T&P etc. Required for proper completion of work . | 66.22 | CUM | 1,607.68 | ₹1,06,460.57 |
| 5 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground floor only shall be measured as per I.S.6313(PartII 1981)Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or chordancewill be used The rate of application of chemical emulsion shallbe as follows : (1)Treatment for masonary & foundation 5 liters per/100 sqm.(2) Back fill in immediate contact with foundation 7.5 liters/100sqm (3) Treatment of top surface of plinth filling 5 liters/100 sqm (4)Treatment junction of wall and the floor 7.5 liters /100 sqm (5)Treatment of soil along external perimeter of building 7.5liters/100sqm. (6) Treatment of soil under apron along external perimter 5 liters/100 sqm. | 850.9 | SQM | 230 | ₹1,95,707 |
| 6 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete
work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland
/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete,to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in
charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cemeNT .All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum footing | 167.16 | CUM | 7,195.1 | ₹12,02,732.92 |
| 7 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete
work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland
/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete,to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in
charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cemeNT .All works above plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum Column | 51.84 | CUM | 7,464.32 | ₹3,86,950.35 |
| 8 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete
work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland
/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete,to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in
charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cemeNT .All works above plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum plinth and lintel band | 6 | CUM | 7,464.32 | ₹44,785.92 |
| 9 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete
work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland
/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete,to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in
charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cemeNT .All works above plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum Sunshade | 5.06 | CUM | 7,464.32 | ₹37,769.46 |
| 10 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete
work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland
/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete,to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in
charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cemeNT .All works above plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum beam | 81.96 | CUM | 7,464.32 | ₹6,11,775.67 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
financialbidcommunity.pdf
Tender Documents • 3.28 MB
BOQ_2135233.xls
BOQ • 0.58 MB
TECHNICALBIDcommunity.pdf
Tender Documents • 20.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .