| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance 2308 SF NO 453 3B1 VEERAPANDI TIRUPUR SOUTH | L1 | Accepted-Finance Accept | |
| 2 | Rejected-Technical | - | Rejected-Technical Not Responsive |
| Sl No | Description | Qty | Unit | L.ELLAPPAN L2 | Sivakumar L1 |
|---|---|---|---|---|---|
| 1.00 | Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | 37 | Cu.m | 4,350 ₹1,60,950 | 4,327 ₹1,60,099 Lowest |
| 2.00 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 748 | Sq.m | 25 ₹18,700 | 23 ₹17,204 Lowest |
| 3.00 | Providing and laying Bituminous concrete to 40mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. | 23 | Cu.m | 10,600 ₹2,43,800 | 10,442 ₹2,40,166 Lowest |
| 4.00 | Providing and laying Bituminous concrete to 40mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. | 23 | Cu.m | 10,600 ₹2,43,800 | 75,144 ₹75,144 Lowest |
| 5.00 | GST @ 18% | 1 | No | 78,000 ₹78,000 Lowest | - |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
30 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Commissioner Theni allinagaram Municipality
Commissioner Theni allinagaram Municipality
Providing patch works to municipal roads in Theni allinagaram municipality
2025_MAWS_614926_1
2034/2025/e1
Open Tender
Civil Works
Works
Theni allinagaram Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
19 Jan 2026
21 Oct 2025
30 Oct 2025
21 Oct 2025
30 Oct 2025
23 Oct 2025
Amount
Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying Bituminous concrete to 40mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications.
Providing and laying Bituminous concrete to 40mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications.
L.ELLAPPAN (BID ID -1500429)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_734712.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .