Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC 269 VEER COLONY BATHINDA | ₹1.1 Cr | L1 | Accepted-AOC accepted |
| 2 | L2₹1.2 CrRejected-Finance PUNJAB PB PUNJAB | ₹1.2 Cr | L2 | Rejected-Finance due to higher rate |
| Sl No | Description | Qty | Unit | VARINDER KUMAR CONTRACTOR L1 | JOGINDER SINGH CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in ordinary soil, exclusive of compensation of earth:- (a) Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods. | 1 | Cum | 81 ₹81 | 87 ₹87 |
| 2.00 | Earth work excavation in ordinary soil, exclusive of compensation of earth:- (b) Earth work undressed with a combined lead upto 15 metres including breaking of clods. | 1 | Cum | 114 ₹114 | 120 ₹120 |
| 3.00 | Dressing of earth work (i) New work or remodeling work. | 1 | Sq.Mtr | 1 ₹1 | 1.5 ₹1.50 |
| 4.00 | (6.18 (a)) Dag belling single kassi stroke minimum 7.5 cm depth. | 1 | Km | 64 ₹64 | 70 ₹70 |
| 5.00 | LINING Dressing bed and preparation of sub grade for lining. | 1 | Sq.Mtr | 848 ₹848 | 800 ₹800 |
| 6.00 | Dismantling brick work tile, masonry or tile lining:- (b) In cement | 1 | cum | 11 ₹11 | 14 ₹14 |
| 7.00 | BRICK WORK First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth | 1 | Cum | 718 ₹718 | 790 ₹790 |
| 8.00 | PLASTERING & POINTING 10mm thick Cement Plaster 1:4 for Side Walls | 1 | Sq.Mtr | 6,500 ₹6,500 | 7,000 ₹7,000 |
| 9.00 | PLASTERING & POINTING 10mm thick cement plaster 1 : 4 on floors & Top | 1 | Sq.Mtr | 182 ₹182 | 197 ₹197 |
| 10.00 | CONCRETE Supplying & laying dry brick bats | 1 | Cum | 140 ₹140 | 152 ₹152 |
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
20 Apr 2026, 10:00 amClosed
Executive Engineer
Executive Engineer, Bathinda Canal and Ground water Division, Bathinda
Estimate for Relining/Lining of watercourse of Outlet RD 22430/R of Dehlwan disty
2026_WR_164957_3
65/22A/2025-26
Open Tender
Civil Works - Canal
Bathinda
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.1 L
bathinda
6 May 2026
30 Mar 2026
20 Apr 2026
30 Mar 2026
20 Apr 2026
30 Mar 2026
7 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Earth work excavation in ordinary soil, exclusive of compensation of earth:- (a) Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods. | - | Cum | - | - | |
Earth work excavation in ordinary soil, exclusive of compensation of earth:- (b) Earth work undressed with a combined lead upto 15 metres including breaking of clods. | - | Cum | - | - | |
Dressing of earth work (i) New work or remodeling work. | - | Sq.Mtr | - | - | |
(6.18 (a)) Dag belling single kassi stroke minimum 7.5 cm depth. | - | Km | - | - | |
LINING Dressing bed and preparation of sub grade for lining. | - | Sq.Mtr | - | - | |
Dismantling brick work tile, masonry or tile lining:- (b) In cement | - | cum | - | - | |
BRICK WORK First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth | - | Cum | - | - | |
PLASTERING & POINTING 10mm thick Cement Plaster 1:4 for Side Walls | - | Sq.Mtr | - | - | |
PLASTERING & POINTING 10mm thick cement plaster 1 : 4 on floors & Top | - | Sq.Mtr | - | - | |
CONCRETE Supplying & laying dry brick bats | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_334513.xls
BOQ • 0.24 MB
TB03.xls
Additional Documents • 0.04 MB
Download all tender documents and submit your bid