Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹75 LAccepted-AOC | 1 | Accepted-AOC ok | |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹2.8 L
EMD Value
₹2,800
Closing Date
22 Feb 2024, 3:00 pmClosed
Executive officer of Minjur Town Panchayat
Executive officer of Minjur Town Panchayat
Providing Paver Block Road at SRF Nagar Balance Part in Minjur Town Panchayat
2024_DTP_427447_1
28/2023/a1
Open Tender
Civil Works
Works
180 days
Providing Paver Block Road at SRF Nagar Balance Pa
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹2,800
Yes
11 Oct 2024
19 Feb 2024
22 Feb 2024
19 Feb 2024
22 Feb 2024
19 Feb 2024
Amount
Earth Work Excavation the Existing BT Surface including All Labour Charges and complete as per the standard Specification
Providing of Granular Sub base using Grade I materials of table 400 -1 of Morth with minimum CBR 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at OMC and compacting with Vibratory Roller to achieve the desired density including all labourcharges etc, complete as per technical specification and as directed by the departmental officers. Morth - IV No. 111,112,401,900
Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam 200mm (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying of prime coat using emulsion at the rate of 7 Kg per ten square meter over the WMM surface including cost of emulsion and labour charges for preparing the surface for laying the tack coat and applying the required quantity of emultion for tack coat by sprayer etc. complete complying with standard specifications as per relevatn MORTH specifications.
Providing and laying of tack coat using emulsion at the rate of 2.5 Kg per ten square meter over the WMM surface including cost of emulsion and labour charges for preparing the surface for laying the tack coat and applying the required quantity of emultion for tack coat by sprayer etc. complete complying with standard specifications as per relevatn MORTH specifications.
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 46.28 kgs of 60/70 Grade Bulk bitumen and added sheeded plastic 8% is 4.02 kgs for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_508254.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .