Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹2.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.7 L+₹27,122.18 (11.3%)Admitted-Fee/PreQual/Technical/Finance | ₹2.7 L+₹27,122.18 (11.3%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.8 L+₹36,640.73 (15.3%)Admitted-Fee/PreQual/Technical/Finance | ₹2.8 L+₹36,640.73 (15.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.9 L+₹45,056.36 (18.8%)Admitted-Fee/PreQual/Technical/Finance | ₹2.9 L+₹45,056.36 (18.8%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹2.9 L+₹51,825.14 (21.6%)Admitted-Fee/PreQual/Technical/Finance | ₹2.9 L+₹51,825.14 (21.6%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | sri karthikeyan industries L1 | Deepa Constructions L3 | P.Ganesan L5 | Kubendiran L4 | Manjunathan L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Construction of Plastic Storage Shed at Vadapudupattu Panchayat | ||||||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation | 15.37 | Cum | 200.2 ₹3,077.07 | 250 ₹3,842.5 | 260 ₹3,996.2 | 130 ₹1,998.1 Lowest | 203.78 ₹3,132.1 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation | 4.3 | Cum | 2,176.64 ₹9,359.55 Lowest | 5,600 ₹24,080 | 5,600 ₹24,080 | 5,430 ₹23,349 | 4,737.87 ₹20,372.84 |
| 4.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 21.91 | sqm | 191.57 ₹4,197.3 Lowest | 530 ₹11,612.3 | 285 ₹6,244.35 | 270 ₹5,915.7 | 487.5 ₹10,681.13 |
| 5.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.28 | mt | 67,928.03 ₹19,359.49 Lowest | 90,000 ₹25,650 | 91,000 ₹25,935 | 90,000 ₹25,650 | 89,938.4 ₹25,632.44 |
| 6.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 3.5 | Cum | 2,612.75 ₹9,144.63 Lowest | 5,900 ₹20,650 | 8,500 ₹29,750 | 9,500 ₹33,250 | 9,081.05 ₹31,783.68 |
| 7.00 | Precast concrete block masonry (including Quoin Blocks, Jamb blocks, closers, etc) with Solid cement concrete blocks of approved size size made of cement concrete 1:3:6 mix ( 1 cement, 3 coarse M.Sand, 6 graded stone aggregate 20mm and down gauge) in foundation and plinth in cement lime mortar 1:2:9 (1 cement, 2 lime putty 9 coarse M.Sand)/ 1:1:6 (1 cement, 1 lime putty, 6 coarse M.Sand )/ Cement 1:6 (1 cement: 6 coarse M.Sand) Details of cost for 1.89cum of precast concrete blocks masonry.) 100 sqft x 2/3 = 66 2/3 cft= 1.89cum) (No. 7.75) | 3.36 | Cum | 3,658.04 ₹12,291.01 | 300 ₹1,008 Lowest | 6,100 ₹20,496 | 6,500 ₹21,840 | 5,969.68 ₹20,058.12 |
| 8.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of paint and all labour charges etc complete | 49.26 | sqm | 174.15 ₹8,578.63 | 168 ₹8,275.68 Lowest | 262 ₹12,906.12 | 272 ₹13,398.72 | 199.21 ₹9,813.08 |
| 9.00 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including costand conveyance of all materials to site and all labour charges etc complete | 26.25 | sqm | 391.86 ₹10,286.33 | 300 ₹7,875 | 255 ₹6,693.75 | 251 ₹6,588.75 | 115.22 ₹3,024.53 Lowest |
| 10.00 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. | 49.26 | sqm | 95.81 ₹4,719.6 Lowest | 100 ₹4,926 | 280 ₹13,792.8 | 275 ₹13,546.5 | 192.48 ₹9,481.56 |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
17 Sept 2026, 3:00 pmClosed
The BDO (VP), Madhanur
The BDO (VP), Madhanur
Tirupathur District - Construction of Plastic Storage Shed at Vadapudupattu Panchayat at Madhanur Block under SBM (G) -2026-27
2026_RDTN_698999_1
B7/1282/2025
Open Tender
Civil Works
Item Rate
The BDO (VP), Madhanur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
Yes
18 Sept 2026
28 Aug 2026
17 Sept 2026
28 Aug 2026
17 Sept 2026
28 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Plastic Storage Shed at Vadapudupattu Panchayat | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation | 15.37 | Cum | - | - |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation | 4.3 | Cum | - | - |
| 4 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 21.91 | sqm | - | - |
| 5 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 1 | mt | - | - |
| 6 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 3.5 | Cum | - | - |
| 7 | Precast concrete block masonry (including Quoin Blocks, Jamb blocks, closers, etc) with Solid cement concrete blocks of approved size size made of cement concrete 1:3:6 mix ( 1 cement, 3 coarse M.Sand, 6 graded stone aggregate 20mm and down gauge) in foundation and plinth in cement lime mortar 1:2:9 (1 cement, 2 lime putty 9 coarse M.Sand)/ 1:1:6 (1 cement, 1 lime putty, 6 coarse M.Sand )/ Cement 1:6 (1 cement: 6 coarse M.Sand) Details of cost for 1.89cum of precast concrete blocks masonry.) 100 sqft x 2/3 = 66 2/3 cft= 1.89cum) (No. 7.75) | 3.36 | Cum | - | - |
| 8 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of paint and all labour charges etc complete | 1 | sqm | - | - |
| 9 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including costand conveyance of all materials to site and all labour charges etc complete | 26.25 | sqm | - | - |
| 10 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. | 49.26 | sqm | - | - |
stage.html
html • 0.02 MB
finance_840265.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.35 MB
Tendernotice_2.pdf
PDF • 0.53 MB
BOQ_840265.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .