Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.7 CrAccepted-Finance | ₹35.7 Cr | L1 | Accepted-Finance Lowest rate tenderer |
| 2 | L2₹38.1 CrAccepted-Finance | ₹38.1 Cr | L2 | Accepted-Finance Highest rate tenderer |
| 3 | L3₹38.8 CrAccepted-Finance | ₹38.8 Cr | L3 | Accepted-Finance Highest rate tenderer |
| 4 | L4₹38.8 CrAccepted-Finance CHENNAI 600 095 | CHENNAI | TAMIL NADU | 600001 | ₹38.8 Cr | L4 | Accepted-Finance Highest rate tenderer |
| 5 | L5₹38.8 CrAccepted-Finance NAMAKKAL | ₹38.8 Cr | L5 | Accepted-Finance Highest rate tenderer |
| Sl No | Description | Qty | Unit | P GANGADARAN L1 | SMP ASSOCIATES L3 | SRI RAMANA BUILDING CONSTRUCTIONS PRIVATE LIMITED L5 | PTM PROJECTS PVT LTD L4 | JOHNSUN ENGINEERING CONTRACTORS L2 | GRM CONSTRUCTIONS L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils (including refilling)
a) 0 to 2 mt. | 1,312 | 1 Cum. | 231 ₹3,03,072 | 225 ₹2,95,200 Lowest | 260 ₹3,41,120 | 300 ₹3,93,600 | 300 ₹3,93,600 | 269 ₹3,52,928 |
| 2.00 | Earth work excavation for Open foundation (excluding refilling)
a) 0 to 2 mt. | 578.4 | 1 Cum. | 131 ₹75,770.4 | 150 ₹86,760 | 123 ₹71,143.2 | 120 ₹69,408 | 145 ₹83,868 | 118 ₹68,251.2 Lowest |
| 3.00 | b. 2 to 3 mt. | 154 | 1 Cum. | 131 ₹20,174 Lowest | 150 ₹23,100 | 134 ₹20,636 | 150 ₹23,100 | 160 ₹24,640 | 133 ₹20,482 |
| 4.00 | c. 3 to 4 mt. | 154 | 1 Cum. | 131 ₹20,174 Lowest | 150 ₹23,100 | 146 ₹22,484 | 150 ₹23,100 | 170 ₹26,180 | 148 ₹22,792 |
| 5.00 | Earth work excavation for Open foundation for drains (excluding refilling) width upto 1.25 m
a. 0 to 2 mt. | 19.2 | 1 Cum. | 131 ₹2,515.2 Lowest | 500 ₹9,600 | 184 ₹3,532.8 | 200 ₹3,840 | 220 ₹4,224 | 189 ₹3,628.8 |
| 6.00 | Providing pre-constructional Antitermite treatment including cost of chemicals labour | 1,527.7 | 1 Sqm | 31 ₹47,358.7 | 30 ₹45,831 | 28 ₹42,775.6 Lowest | 30 ₹45,831 | 35 ₹53,469.5 | 28 ₹42,775.6 Lowest |
| 7.00 | Supplying and filling in foundation and basement with crushed stone sand in layers of 150 mm thickness | 247.8 | 1 Cum. | 1,500 ₹3,71,700 Lowest | 1,750 ₹4,33,650 | 1,844 ₹4,56,943.2 | 1,500 ₹3,71,700 Lowest | 2,160 ₹5,35,248 | 1,988 ₹4,92,626.4 |
| 8.00 | Supplying and filling with 40mm size Hard broken stone jelly in foundation and basement | 48 | 1 Cum. | 600 ₹28,800 Lowest | 1,500 ₹72,000 | 1,387 ₹66,576 | 1,000 ₹48,000 | 1,000 ₹48,000 | 1,578 ₹75,744 |
| 9.00 | Supplying and filling with 20mm size Hard broken stone jelly in foundation and basement | 48 | 1 Cum. | 600 ₹28,800 Lowest | 2,000 ₹96,000 | 1,841 ₹88,368 | 1,500 ₹72,000 | 1,500 ₹72,000 | 2,066 ₹99,168 |
| 10.00 | Filling with Excavated Earth | 183.2 | 1 Cum. | 40 ₹7,328 Lowest | 50 ₹9,160 | 42 ₹7,694.4 | 40 ₹7,328 Lowest | 50 ₹9,160 | 40 ₹7,328 Lowest |
Tender Value
Refer Docs
EMD Value
₹22.9 L
Closing Date
15 Apr 2026, 6:00 pmClosed
Superintending Engineer / CC
No.132, E.V.R.Salai, Kilpauk, Chennai-10
Construction of Girls Student Hostel building with 1000 nos of Beds capacity G plus 10 at Quaid E Millath Government Womens College campus at Anna Salai in Chennai city
2026_TNPHC_675332_1
SE/CC/DB/622/2026
Open Tender
Civil Works
Lump-sum
330 days
Anna Salai in Chennai city
Construction of Girls Student Hostel building with 1000 nos of Beds capacity G plus 10 at Quaid E Millath Government Womens College campus at Anna Salai in Chennai city
9 documents required · 9 mandatory
₹0
₹22.9 L
12 Jun 2026
27 Mar 2026
17 Apr 2026
27 Mar 2026
15 Apr 2026
27 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work excavation in all soils (including refilling)
a) 0 to 2 mt. | - | 1 Cum. | - | - |
| - | Earth work excavation for Open foundation (excluding refilling)
a) 0 to 2 mt. | - | 1 Cum. | - | - |
| - | b. 2 to 3 mt. | - | 1 Cum. | - | - |
| - | c. 3 to 4 mt. | - | 1 Cum. | - | - |
| - | Earth work excavation for Open foundation for drains (excluding refilling) width upto 1.25 m
a. 0 to 2 mt. | - | 1 Cum. | - | - |
| - | Providing pre-constructional Antitermite treatment including cost of chemicals labour | - | 1 Sqm | - | - |
| - | Supplying and filling in foundation and basement with crushed stone sand in layers of 150 mm thickness | - | 1 Cum. | - | - |
| - | Supplying and filling with 40mm size Hard broken stone jelly in foundation and basement | - | 1 Cum. | - | - |
| - | Supplying and filling with 20mm size Hard broken stone jelly in foundation and basement | - | 1 Cum. | - | - |
| - | Filling with Excavated Earth | - | 1 Cum. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tendernotice_2.pdf
PDF • 0.12 MB
PQDoc.pdf
Additional Documents • 0.53 MB
TenderdocumentsatAnnaSalai.pdf
Tender Documents • 16.63 MB
BOQ_811685.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].