| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAdmitted-Finance | ₹4.1 L | L1 | Admitted-Finance |
| 2 | L2₹4.1 LAdmitted-Finance | ₹4.1 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ANNAI CONSTRUCTION L2 | D S CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.01Construction of Mini CSC Common Toilet Type-2 PUES in pudupattu Habitation Korattampattu panchayat | |||||
| 1.02 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation | 10.43 | Cum | 229.49 ₹2,393.58 Lowest | 260 ₹2,711.8 |
| 1.03 | Filling with M.Sand from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 1.95 | Cum | 1,950.46 ₹3,803.4 | 1,200 ₹2,340 Lowest |
| 1.04 | Refilling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 2.46 | Cum | 39.89 ₹98.13 Lowest | 40 ₹98.4 |
| 1.05 | Plain Cement Concrete 1:4:8 (one cement, four sand and eight hard granite broken stone of 40mm size ISS gauge) for foundation and footing including mixing, placing, ramming ,finishing curing etc. complete in accordance with standard specification and as directed by the TWAD Board Officers. | 2.77 | Cum | 5,500 ₹15,235 | 5,000 ₹13,850 Lowest |
| 1.06 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 4.34 | Cum | 6,164.15 ₹26,752.41 | 5,000 ₹21,700 Lowest |
| 1.07 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 5.09 | Cum | 6,257.02 ₹31,848.23 | 5,200 ₹26,468 Lowest |
| 1.08 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 1.91 | Cum | 9,200 ₹17,572 | 6,000 ₹11,460 Lowest |
| 1.09 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 2.52 | Cum | 9,200 ₹23,184 | 6,200 ₹15,624 Lowest |
| 1.10 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | 13.11 | Cum | 476.33 ₹6,244.69 Lowest | 500 ₹6,555 |
Tender Value
₹4.8 L
EMD Value
₹4,900
Closing Date
14 Aug 2026, 3:00 pmClosed
Block Development Officer(V.Pts)Pudupalayam
Block Development Officer(V.Pts)Pudupalayam
Construction of Mini CSC Common Toilet Type-2 PUES in pudupattu Habitation Korattampattu panchayat Under SBM(G) General Fund (V-Pts) - 2026-27
2026_RDTN_689537_1
Roc. No.A10/2553/2026Dt.03.07.2026 TVMPPM/2026-27/0005
Open Tender
Civil Works
Item Rate
180 days
Block Development Officer(V.Pts)Pudupalayam
please refer tender doucement
2 documents required · 2 mandatory
₹0
₹4,900
Yes
18 Aug 2026
30 Jul 2026
14 Aug 2026
30 Jul 2026
14 Aug 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Construction of Mini CSC Common Toilet Type-2 PUES in pudupattu Habitation Korattampattu panchayat | - | - | - | - |
| 1.02 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation | 1 | Cum | - | - |
| 1.03 | Filling with M.Sand from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | - | Cum | - | - |
| 1.04 | Refilling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | - | Cum | - | - |
| 1.05 | Plain Cement Concrete 1:4:8 (one cement, four sand and eight hard granite broken stone of 40mm size ISS gauge) for foundation and footing including mixing, placing, ramming ,finishing curing etc. complete in accordance with standard specification and as directed by the TWAD Board Officers. | - | Cum | - | - |
| 1.06 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 1 | Cum | - | - |
| 1.07 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 1 | Cum | - | - |
| 1.08 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | - | Cum | - | - |
| 1.09 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | - | Cum | - | - |
| 1.1 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | 1 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Tenderdocument1.pdf
Tender Documents • 0.33 MB
BOQ_828883.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].