Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 26 P BLOCK KUNJ VIHAR YASHODA NAGAR KANPUR NAGAR UTTAR PRADESH 208011 | KANPUR NAGAR | UTTAR PRADESH | 208011 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.1 L
EMD Value
₹1.4 L
Closing Date
19 Jun 2026, 3:00 pmClosed
CHIEF ENGINEER, KMC
MOtijheel
Construction of room, Fixing of red stone jali and improvement of foothpath at siddhnath park pardewan purwa in ward-28 under Zone-02
2026_NNKAN_1160471_1
87/AA-2/26-27
Open Tender
Civil Works
Fixed-rate
60 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹1.4 L
19 Jun 2026
13 Jun 2026
19 Jun 2026
13 Jun 2026
19 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismenteling of RCC or reinforcement brick work incluiding Stacking of material etc all complete. | - | sqm | 1,200 | - |
| 2 | Dismenteling of brick including stacking of dismentled material etc all complete work | - | cum | 580 | - |
| 3 | Dismenteling of CC floor including Stacking of dismentled material etc all complete work. | 16 | sqm | 67 | ₹1,072 |
| 4 | Earth work in Excavation in trenches for foundations pipes Cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in distance of 50 mtr. | 14.24 | cum | 170 | ₹2,420.8 |
| 5 | Providing and laying Cement concrete (1:6:12,1 Cement:6 fine sand:12 Brick ballast nominal size 40mm) and curing complete, including cost of form work in foundation and floors. | 1.68 | sqm | 4,380 | ₹7,358.4 |
| 6 | Class-150 Brick workin (1:4) cement mortar in Foundation & Plinth including supply of all Materials Labour and Tool & Plants etc, required for proper completion of the work. | 1 | cum | 6,600 | ₹6,593.4 |
| 7 | RCC Work with Cement concrete 1:1.5:3, 1 Cement:1.5 coarse sand:3 stone Agregate incuding all completion of work | 0.36 | cum | 8,720 | ₹3,167.1 |
| 8 | Mild Steel or Iron in Reinforcement including all completion of work. | 0.28 | qtls | 7,200 | ₹2,050.56 |
| 9 | Class-150 Brick workin (1:4) cement mortar including supply of all materials Labour and Tool and Plantss etc requried for proper completion of the work for Super structure | 0.4 | cum | 7,500 | ₹3,000 |
| 10 | Sale of materials bricks with all completion | 1,619 | nos | -7.2 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.65 MB
BOQ_2174863.xls
BOQ • 0.29 MB
100stamp.pdf
Tender Documents • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .